Cost to complete refers to the estimated amount of money required to finish a project or task.
Cost to complete is an important metric used in project management and quantity surveying.
It takes into account the remaining work, resources, and expenses needed to complete a project.
It helps in assessing the financial status of a project and making informed decisions.
Cost to complete can be calculated by subtracting the act...
Unit weight of steel bars varies based on their diameter and length.
The weight of steel bars is measured in kilograms per meter (kg/m).
The unit weight of steel bars ranges from 0.785 kg/m to 6.16 kg/m depending on their diameter.
For example, a 10mm diameter steel bar weighs around 0.62 kg/m while a 32mm diameter steel bar weighs around 6.16 kg/m.
I applied via Referral and was interviewed before May 2020. There was 1 interview round.
Rate analysis is the process of determining the unit cost of a particular item or activity in a construction project.
Identify the item or activity to be analyzed
Determine the quantity of materials and labor required
Calculate the cost of materials and labor
Add overhead costs and profit margin
Divide the total cost by the quantity to get the unit rate
Compare the rate with market rates to ensure competitiveness
Components to be considered in Rate analysis
Cost of materials
Cost of labor
Cost of equipment
Overhead expenses
Profit margin
Taxes and duties
Transportation costs
Wastage and spoilage
Contingencies
Productivity rates
Market rates
Inflation rates
The documents required to certify the final bill as a Quantity Surveyor.
Contract documents
Measurement records
Variation orders
Payment certificates
Final account statement
As-built drawings
Completion certificates
Test reports
Subcontractor invoices
Material invoices
I applied via Referral and was interviewed before Jul 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.
posted on 26 Jan 2024
I applied via Walk-in and was interviewed in Jul 2023. There was 1 interview round.
The question asks about the code for mode of measurement, types of joints in flooring, and previous projects and estimation preparation.
The code for mode of measurement refers to the standard method used to measure quantities in construction projects.
Types of joints in flooring include butt joints, tongue and groove joints, and expansion joints.
Previous projects can include residential buildings, commercial complexes, ...
I applied via Naukri.com
We can increase the performance of the company by implementing efficient project management techniques and investing in employee training and development.
Implement efficient project management techniques
Invest in employee training and development
Encourage innovation and creativity
Streamline processes and procedures
Regularly review and evaluate performance metrics
Steel can be made strong by controlling its composition and heat treatment.
Increasing the carbon content and adding other alloying elements like manganese, chromium, and nickel can improve strength.
Heat treatment processes like quenching and tempering can also increase strength.
Proper quality control during manufacturing and testing can ensure the steel meets strength requirements.
Examples of high-strength steels inclu...
I applied via Walk-in and was interviewed in Apr 2022. There were 2 interview rounds.
based on 1 review
Rating in categories
Field Engineer
63
salaries
| ₹2.2 L/yr - ₹4.8 L/yr |
Assistant Project Engineer
62
salaries
| ₹2.3 L/yr - ₹5.2 L/yr |
Deputy Team Leader
52
salaries
| ₹4.6 L/yr - ₹9 L/yr |
Assistant Manager Finance
44
salaries
| ₹2.7 L/yr - ₹6.9 L/yr |
Field Supervisor
43
salaries
| ₹1.9 L/yr - ₹3.2 L/yr |
AECOM
L&T Energy Hydrocarbon
Apco Infratech
Saipem