Upload Button Icon Add office photos

Filter interviews by

ROCKY CONSTRUCTION PTY. Civil Engineer Interview Questions, Process, and Tips

Updated 18 Jan 2025

ROCKY CONSTRUCTION PTY. Civil Engineer Interview Experiences

1 interview found

Civil Engineer Interview Questions & Answers

user image Brahma Kushwaha

posted on 18 Jan 2025

Interview experience
2
Poor
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - HR 

(5 Questions)

  • Q1. What is the ratio of C30?
  • Ans. 

    The ratio of C30 refers to the compressive strength of concrete mix.

    • C30 refers to a concrete mix with a compressive strength of 30 megapascals (MPa).

    • The ratio of C30 typically consists of 1 part cement, 2 parts sand, and 3 parts aggregate.

    • The ratio may vary depending on the specific requirements of the project.

  • Answered by AI
  • Q2. What do you understand water cement ratio?
  • Ans. 

    Water cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix.

    • Water cement ratio is a crucial factor in determining the strength and durability of concrete.

    • A lower water cement ratio leads to stronger and more durable concrete.

    • The ideal water cement ratio varies depending on the type of concrete mix and its intended use.

    • For example, a water cement ratio of 0.5 is commonly used fo...

  • Answered by AI
  • Q3. What is the shrinkage value?
  • Ans. 

    Shrinkage value refers to the decrease in volume or size of a material due to drying or cooling.

    • Shrinkage value is a measure of how much a material shrinks in volume or size.

    • It is commonly seen in materials like concrete, clay, and plastics.

    • Shrinkage can lead to cracking or deformation in structures if not properly accounted for in design and construction.

    • Factors affecting shrinkage include moisture content, temperatur

  • Answered by AI
  • Q4. What is difference bending moment and shear force ?
  • Ans. 

    Bending moment is the internal resistance to bending in a beam, while shear force is the internal resistance to sliding in a beam.

    • Bending moment is a moment that causes a beam to bend. It is calculated as the product of the force applied and the distance from the point of application.

    • Shear force is a force that acts parallel to the cross-section of the beam. It tends to slide one part of the beam over the other.

    • Bending...

  • Answered by AI
  • Q5. What is quantity of cement in 1 cum?
  • Ans. 

    The quantity of cement in 1 cubic meter varies depending on the grade of concrete being used.

    • The quantity of cement in 1 cubic meter of concrete can range from 300 to 450 kg.

    • For example, in M20 grade concrete, the quantity of cement is typically around 320 kg per cubic meter.

    • In M25 grade concrete, the quantity of cement can be around 350 kg per cubic meter.

    • Higher grade concretes like M30 or M40 may require even more ce

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - If anyone give interview then first preparing himself of his core subject which is study in college or university. And preparing self.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. What is the method for calculating the weight of a 12 mm diameter steel bar with a length of 12 meters?
  • Ans. 

    The weight of a steel bar can be calculated using the formula: weight = volume x density

    • Calculate the volume of the steel bar using the formula: volume = πr^2h

    • Determine the density of steel, which is typically around 7850 kg/m^3

    • Calculate the weight using the formula: weight = volume x density

    • Substitute the values of radius (6 mm), length (12 meters), and density into the formula to find the weight

  • Answered by AI
  • Q2. What is the method to calculate the development length of steel?
  • Ans. 

    The development length of steel can be calculated using the formula specified in the relevant design code.

    • The development length of steel is calculated based on the bond strength between the steel reinforcement and the concrete.

    • The formula for calculating the development length is typically provided in the design code being used, such as ACI 318 for American standards or Eurocode 2 for European standards.

    • Factors such a...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - The company has excellent staff and demonstrates strong coordination across all sites.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Civil engineering sewage project
  • Q2. Civil engineering
Round 2 - Technical 

(2 Questions)

  • Q1. Excavation engineering sewage project
  • Q2. Civil engineering 6 year sewage project
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. Technical engineer
  • Q2. My salary 800000
Round 2 - Technical 

(3 Questions)

  • Q1. Technical engineer
  • Q2. My salary 800000
  • Q3. Excavation Engineer

Interview Preparation Tips

Interview preparation tips for other job seekers - Excavation engineers sewerage project delhi
Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company

Round 1 - Technical 

(2 Questions)

  • Q1. Site work related like foundation
  • Q2. Eraction and stringing
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Sep 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

The goal of an aptitude test is to predict the ability to learn new skills

Round 2 - Technical 

(2 Questions)

  • Q1. What experience do you have that relates to this job role
  • Q2. Tell me about your final year projects

Interview Preparation Tips

Interview preparation tips for other job seekers - Send follow up mails
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Why do a slump test
  • Ans. 

    To determine the workability of concrete mix

    • To ensure the concrete mix has the desired consistency for proper placement and compaction

    • To assess the water content in the concrete mix

    • To check the quality of the concrete mix and its ability to flow and settle

    • To prevent issues such as segregation and bleeding in the concrete mix

    • To meet the specifications and requirements of the project

    • Example: If the slump test result show...

  • Answered by AI
  • Q2. What should be the minimum slump of concrete
  • Ans. 

    The minimum slump of concrete should be 25 mm according to standards.

    • The minimum slump of concrete is typically specified by standards such as ASTM or ACI.

    • A slump test is conducted to measure the consistency of concrete, with a minimum value of 25 mm usually required.

    • A higher slump value indicates a more workable concrete mix, while a lower value may result in difficulties during placement and compaction.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Tell me about yourself?
Round 2 - Technical 

(1 Question)

  • Q1. Current job responsibilities?
Round 3 - Final decision for acceptance 

(1 Question)

  • Q1. Is the job is suitable for you or not?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and passionate
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. BBS ,QUANTITY TAKE OFF ,QUANTITY OF CONCRETE, lapping, and clear cover
  • Ans. Find accurate cutting length and find the total weight of rcc structure, find out all the quantity of structure, Lapping normal used 50d clear cover our for footing 50mm and beam 25mm and column for 40mm and slab 20mm
  • Answered by Jitu Behera
  • Q2. Bbs, mix design

Interview Preparation Tips

Interview preparation tips for other job seekers - Good to learn the skill
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Reason for leaving current company
  • Ans. 

    Seeking new challenges and opportunities for growth.

    • Desire for career advancement

    • Looking for new challenges

    • Seeking better work-life balance

    • Company restructuring or downsizing

    • Relocation to a new area

  • Answered by AI
  • Q2. Current job location
  • Ans. 

    Currently working in a construction company in downtown Los Angeles.

    • Working in downtown Los Angeles

    • Construction company

    • Civil engineering job

  • Answered by AI

ROCKY CONSTRUCTION PTY. Interview FAQs

How many rounds are there in ROCKY CONSTRUCTION PTY. Civil Engineer interview?
ROCKY CONSTRUCTION PTY. interview process usually has 1 rounds. The most common rounds in the ROCKY CONSTRUCTION PTY. interview process are HR.
What are the top questions asked in ROCKY CONSTRUCTION PTY. Civil Engineer interview?

Some of the top questions asked at the ROCKY CONSTRUCTION PTY. Civil Engineer interview -

  1. What is difference bending moment and shear forc...read more
  2. What do you understand water cement rat...read more
  3. What is quantity of cement in 1 c...read more

Tell us how to improve this page.

ROCKY CONSTRUCTION PTY. Civil Engineer Interview Process

based on 1 interview

Interview experience

2
  
Poor
View more

ROCKY CONSTRUCTION PTY. Civil Engineer Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

4.0

Skill development

5.0

Work-life balance

4.0

Salary

5.0

Job security

4.0

Company culture

1.0

Promotions

2.0

Work satisfaction

Explore 1 Review and Rating
Compare ROCKY CONSTRUCTION PTY. with

Larsen & Toubro Limited

4.0
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview