Upload Button Icon Add office photos

Filter interviews by

Robt Stone (ME) LLC Construction Mechanical Engineer Interview Questions and Answers

Updated 12 Oct 2024

Robt Stone (ME) LLC Construction Mechanical Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. About current roles and responsibility
  • Q2. About Planning ,manpower Management
  • Q3. About Excuation at site
  • Q4. About Project Documents
  • Q5. About materials requirement at site at project different phases.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Dec 2023. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Please tell us about yourself.
  • Ans. 

    I am a dedicated and experienced construction manager with a strong background in overseeing projects from start to finish.

    • Over 10 years of experience in construction management

    • Skilled in project planning, budgeting, and scheduling

    • Strong leadership and communication skills

    • Managed multiple projects simultaneously, ensuring timely completion

    • Proficient in reading blueprints and coordinating with subcontractors

  • Answered by AI
  • Q2. How do you manage situations when work is not progressing according to the planned schedule?
  • Ans. 

    I address delays by identifying the root cause, adjusting the schedule, reallocating resources, and communicating with stakeholders.

    • Identify the root cause of the delay

    • Adjust the schedule accordingly

    • Reallocate resources if necessary

    • Communicate with stakeholders to keep them informed

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. What is your current cost to company (CTC) and what is your expected cost to company (CTC)?
  • Ans. 

    My current CTC is $70,000 and my expected CTC is $80,000.

    • Current CTC is $70,000

    • Expected CTC is $80,000

    • The increase in CTC is due to additional responsibilities and experience gained

  • Answered by AI
  • Q2. How long does it take for you to submit your PME report, and when do you usually submit it?
  • Ans. 

    I usually submit my PME report within 1-2 days after completion of the project.

    • I typically take 1-2 days to compile and submit my PME report.

    • I aim to submit the report promptly after the project is completed to ensure timely documentation.

    • Submitting the PME report promptly helps in tracking project progress and identifying any issues early on.

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. How long would it take for you to join?
  • Ans. 

    I can join within 2 weeks of receiving an offer.

    • I have a two-week notice period at my current job.

    • I need time to relocate if necessary.

    • I may need to tie up loose ends before starting a new position.

  • Answered by AI
  • Q2. Are you prepared to search for your accommodation?
  • Ans. 

    Yes, I am prepared to search for my accommodation.

    • I have already started researching different neighborhoods and rental options.

    • I am familiar with online platforms like Zillow, Trulia, and Craigslist for finding accommodation.

    • I have a budget in mind and know what amenities I am looking for in my accommodation.

    • I am open to considering roommates or shared housing to save on costs.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Indeed and was interviewed before Feb 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Self introduction
  • Ans. Thank you sir for your opportunity My name is umesha basically from raichur presently staying in malleshwaram bangalore my last working in sulabh international as a senior engineer cum cad desiner...
  • Answered Anonymously
Round 2 - Technical 

(4 Questions)

  • Q1. Dia of yhe steel
  • Ans. 

    The diameter of the steel refers to the measurement of the cross-sectional size of the steel material.

    • The diameter of the steel is an important parameter in construction engineering as it determines the strength and load-bearing capacity of the material.

    • It is commonly used to specify the size of reinforcing bars (rebars) used in concrete structures.

    • For example, a #4 rebar has a diameter of 1/2 inch, while a #8 rebar ha...

  • Answered by AI
  • Q2. Minimum grade of concrete
  • Ans. 

    The minimum grade of concrete refers to the lowest strength that concrete can achieve.

    • The minimum grade of concrete is determined by the project requirements and specifications.

    • Concrete grades are denoted by a number followed by the letter 'M', representing the compressive strength in megapascals (MPa).

    • Common minimum grades of concrete include M5, M10, M15, and M20.

    • For example, M5 concrete has a minimum compressive str...

  • Answered by AI
  • Q3. Period of open bag cement
  • Ans. 

    The period of open bag cement refers to the time during which cement can be used after the bag has been opened.

    • The period of open bag cement depends on various factors such as humidity, temperature, and storage conditions.

    • Generally, open bag cement should be used within a few hours to a few days.

    • If the cement is exposed to moisture or air for an extended period, it may lose its effectiveness and strength.

    • Proper storage...

  • Answered by AI
  • Q4. Types of slabs in the construction
  • Ans. 

    There are several types of slabs used in construction, including one-way slab, two-way slab, flat slab, and waffle slab.

    • One-way slab is supported on two opposite sides and the load is transferred in one direction.

    • Two-way slab is supported on all four sides and the load is transferred in two directions.

    • Flat slab is a reinforced concrete slab without beams, providing a flat soffit and easy formwork.

    • Waffle slab consists o...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Overall Very good
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Dec 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. It was Telephonic Interview with Project Directors & HR .
  • Q2. Based on my CV & my Work Experience
  • Q3. Explanations how to rule the Project ....
  • Ans. 

    To rule a project effectively, a construction manager must establish clear goals, communicate effectively, manage resources efficiently, and adapt to changes.

    • Establish clear project goals and objectives

    • Communicate effectively with team members, stakeholders, and clients

    • Manage resources efficiently to stay within budget and timeline

    • Adapt to changes and challenges that may arise during the project

    • Delegate tasks appropria...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Review your Previous work experience & some good Knowledge about Project -Site Management .
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Oct 2022. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Minor interview
  • Q2. About last company

Interview Preparation Tips

Interview preparation tips for other job seekers - Poor management don't join
Company forcely sell his product to employees like uniform, food items by his Mall & product from jio money..
Worst HR policy
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Why you leavinng last company??
Round 3 - One-on-one 

(1 Question)

  • Q1. Whats your expectation from company??

Interview Preparation Tips

Interview preparation tips for other job seekers - Hard work and terget yourself untill achieve your success.

I applied via Naukri.com and was interviewed in Dec 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Mix Design, Grade of Concrete, calculations of concrete.

Interview Preparation Tips

Interview preparation tips for other job seekers - Study well Concrete based subject.....

I applied via Other and was interviewed before Aug 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About how to Managed & control The site Construction work, ETC , Telephonic Interview around 45 Mantis.

Interview Preparation Tips

Interview preparation tips for other job seekers - Telephonic Interview will be Comfortable allows.

I applied via Applied directly and was interviewed before Apr 2019. There were 4 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Technically
  • Q2. Planning
  • Q3. Rate analysts

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical but this was done in 3 different meetings.

Robt Stone (ME) LLC Interview FAQs

How many rounds are there in Robt Stone (ME) LLC Construction Mechanical Engineer interview?
Robt Stone (ME) LLC interview process usually has 1 rounds. The most common rounds in the Robt Stone (ME) LLC interview process are Technical.
What are the top questions asked in Robt Stone (ME) LLC Construction Mechanical Engineer interview?

Some of the top questions asked at the Robt Stone (ME) LLC Construction Mechanical Engineer interview -

  1. About Planning ,manpower Managem...read more
  2. About Excuation at s...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 Robt Stone (ME) LLC interview
Referral
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

TCS Interview Questions
3.7
 • 10.3k Interviews
Infosys Interview Questions
3.7
 • 7.5k Interviews
HDFC Bank Interview Questions
3.9
 • 2.1k Interviews
ITC Interview Questions
4.0
 • 536 Interviews
Bajaj Auto Interview Questions
3.9
 • 267 Interviews
View all
HSE Officer
8 salaries
unlock blur

₹8.4 L/yr - ₹18 L/yr

Mechanical Engineer
7 salaries
unlock blur

₹10 L/yr - ₹15 L/yr

HSE Engineer
7 salaries
unlock blur

₹12 L/yr - ₹18 L/yr

QA QC Welding Inspector
6 salaries
unlock blur

₹8.1 L/yr - ₹20.4 L/yr

Electrical & Instrumentation Engineer
6 salaries
unlock blur

₹5.6 L/yr - ₹14.4 L/yr

Explore more salaries
Compare Robt Stone (ME) LLC with

Larsen & Toubro Limited

4.0
Compare

TCS

3.7
Compare

Reliance Industries

4.0
Compare

Hindustan Unilever

4.2
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview