Upload Button Icon Add office photos

Filter interviews by

Robt Stone (ME) LLC Electrical & Instrumentation Engineer Interview Questions and Answers

Updated 21 Jul 2021

Robt Stone (ME) LLC Electrical & Instrumentation Engineer Interview Experiences

1 interview found

I applied via Referral and was interviewed in Jan 2021. There were 4 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Technical question regarding oil industry
  • Q2. About my work experience in my past company
  • Q3. About my way of handling different situation and getting results

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and try to be cool, calm and composed while getting interviews.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. How to install temperature transmitter
  • Ans. 

    To install a temperature transmitter, you need to properly mount the transmitter, connect the wiring, configure the settings, and test the transmitter.

    • Mount the temperature transmitter in a suitable location near the temperature source.

    • Connect the wiring according to the manufacturer's instructions, ensuring proper grounding.

    • Configure the settings such as range, output signal, and calibration using the transmitter's di...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Types of Instruments
  • Ans. 

    Instruments used in control and instrumentation include sensors, transmitters, controllers, and actuators.

    • Sensors: devices that detect changes in physical properties and convert them into electrical signals (e.g. temperature sensors, pressure sensors)

    • Transmitters: devices that send signals from sensors to controllers (e.g. signal transmitters)

    • Controllers: devices that receive signals from sensors and transmitters to re...

  • Answered by AI
  • Q2. PID loop working in Complete
  • Ans. 

    PID loop is a control system feedback mechanism used in industrial processes to maintain desired setpoints.

    • PID stands for Proportional, Integral, Derivative

    • Proportional term responds to the current error

    • Integral term corrects past errors

    • Derivative term predicts future errors

    • PID controller continuously calculates an error value as the difference between a desired setpoint and a measured process variable

    • Example: PID loop...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Strong basic
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Ritik Kumar Maurya
  • Q2. Indian oil corporation limited Panipat
  • Q3. One year apprentice training in Instrumentation and control
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. Instrument Technician
  • Q2. Personal Details
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. How much you earn
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Job Fair and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(6 Questions)

  • Q1. Any instrumentation equipment explain
  • Ans. 

    Instrumentation equipment refers to devices used to measure, control, and monitor various parameters in industrial processes.

    • Instruments like pressure gauges, flow meters, and temperature sensors are commonly used in instrumentation.

    • Control valves and actuators are used to regulate the flow of fluids or gases.

    • Programmable Logic Controllers (PLCs) are used for automation and control of processes.

    • Analytical instruments l...

  • Answered by AI
  • Q2. PLC and scada and DCS
  • Q3. PLC panel wiring diagram
  • Ans. 

    A PLC panel wiring diagram is a visual representation of the electrical connections and components in a programmable logic controller panel.

    • A PLC panel wiring diagram shows the layout and connections of various components such as power supplies, input/output modules, relays, and sensors.

    • It helps technicians understand how the electrical signals flow within the panel and how different devices are interconnected.

    • The diag...

  • Answered by AI
  • Q4. What is the control valve
  • Ans. 

    A control valve is a device used to regulate the flow of fluid or gas in a process system.

    • Control valves are commonly used in industries such as oil and gas, chemical, and power plants.

    • They can be operated manually or automatically through an electrical or pneumatic signal.

    • Control valves consist of a valve body, actuator, and positioner.

    • They can control variables such as flow rate, pressure, temperature, and level.

    • Exam...

  • Answered by AI
  • Q5. What is the transmitter
  • Ans. 

    A transmitter is a device used in instrumentation to convert a physical measurement into an electrical signal.

    • Transmitters are commonly used in industries such as oil and gas, chemical, and power plants.

    • They are used to measure variables such as pressure, temperature, flow rate, level, and pH.

    • Transmitters typically consist of a sensing element, signal conditioning circuitry, and an output signal.

    • The sensing element det...

  • Answered by AI
  • Q6. What is the flow meters
  • Ans. 

    Flow meters are devices used to measure the flow rate of a fluid or gas.

    • Flow meters are commonly used in industries such as oil and gas, water treatment, and manufacturing.

    • They can measure flow rates in various units such as liters per minute, cubic meters per hour, or gallons per minute.

    • Different types of flow meters include electromagnetic, ultrasonic, turbine, and differential pressure flow meters.

    • Flow meters can be...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical skills and programming had checked-in scada

Skills evaluated in this interview

I applied via Recruitment Consulltant and was interviewed in Apr 2022. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. General technical questions from Resume
Round 2 - Technical 

(1 Question)

  • Q1. Sizing and equipment selection
Round 3 - Behavioral interview 

(1 Question)

  • Q1. Situational based questions.

Interview Preparation Tips

Interview preparation tips for other job seekers - Horrible experience:
Totally three rounds of interview where their first two rounds are technical and third round was behaviour interview . The interview went well and they informed me that the result will be announced after 2 weeks of time.
But even after 1 month , I haven't gotten any feedback from them , but the job application status changed to "No longer under construction" in the company's website .They were not even bother to give feedback to the candidate.
Exxon Mobil Bangalore team requires a lot of improvement in the way they are treating candidates and their interviews are very sub standard and needs lot of improvement .
Most of the interviewers were Ex Reliance industries limited employees who run their Own lobby and denying the opportunities for better candidates due to insecurity....So Exxon Mobil Bangalore is in a pathetic situation.....

I applied via Walk-in

Round 1 - Technical 

(2 Questions)

  • Q1. Process instrument caliberation f&g
  • Q2. Control valve assembling

Interview Preparation Tips

Interview preparation tips for other job seekers - Caliberation of process instrument f&g, isolation and trouble shooting, assembling of control valve, permit system, safety awerness
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before May 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Question about selection instrument for hazardous area, and it's classification

Robt Stone (ME) LLC Interview FAQs

What are the top questions asked in Robt Stone (ME) LLC Electrical & Instrumentation Engineer interview?

Some of the top questions asked at the Robt Stone (ME) LLC Electrical & Instrumentation Engineer interview -

  1. About my way of handling different situation and getting resu...read more
  2. Technical question regarding oil indust...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

TCS Interview Questions
3.7
 • 10.4k Interviews
Infosys Interview Questions
3.6
 • 7.6k Interviews
HDFC Bank Interview Questions
3.9
 • 2.1k Interviews
ITC Interview Questions
3.9
 • 542 Interviews
Bajaj Auto Interview Questions
3.9
 • 269 Interviews
View all
Robt Stone (ME) LLC Electrical & Instrumentation Engineer Salary
based on 6 salaries
₹5.6 L/yr - ₹14.4 L/yr
54% more than the average Electrical & Instrumentation Engineer Salary in India
View more details

Robt Stone (ME) LLC Electrical & Instrumentation Engineer Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

5.0

Skill development

4.0

Work-life balance

4.0

Salary

5.0

Job security

4.0

Company culture

4.0

Promotions

4.0

Work satisfaction

Explore 1 Review and Rating
HSE Officer
8 salaries
unlock blur

₹8.4 L/yr - ₹18 L/yr

Mechanical Engineer
7 salaries
unlock blur

₹10 L/yr - ₹15 L/yr

HSE Engineer
7 salaries
unlock blur

₹12 L/yr - ₹18 L/yr

QA QC Welding Inspector
6 salaries
unlock blur

₹8.1 L/yr - ₹20.4 L/yr

Electrical & Instrumentation Engineer
6 salaries
unlock blur

₹5.6 L/yr - ₹14.4 L/yr

Explore more salaries
Compare Robt Stone (ME) LLC with

Larsen & Toubro Limited

4.0
Compare

TCS

3.7
Compare

Reliance Industries

4.0
Compare

Hindustan Unilever

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview