CBR test is a laboratory test used to determine the strength and bearing capacity of soil.
CBR stands for California Bearing Ratio.
It is a measure of the relative strength of a soil sample.
The test involves compacting a soil sample in a mold and subjecting it to a standard load.
The load penetration is measured and compared to standard values.
CBR values are used in the design of pavements and other civil engineering stru...
Sub grade FDD is required as per Morth.
FDD stands for Field Density Test.
Morth refers to the Ministry of Road Transport and Highways.
Sub grade FDD is necessary to determine the compaction and strength of the sub grade soil.
It helps in ensuring the stability and durability of the road pavement.
FDD results are used to assess the quality of the sub grade and make necessary improvements.
Top trending discussions
I applied via Walk-in and was interviewed before Aug 2019. There was 1 interview round.
Fe500 is a type of high-strength reinforcement steel used in construction.
Fe500 stands for 'Fe' meaning iron and '500' representing the minimum yield strength of the steel in megapascals (MPa).
It is commonly used in construction for its high strength and durability.
Fe500 steel bars are used in reinforced concrete structures such as buildings, bridges, and highways.
It is also known as TMT (Thermo-Mechanically Treated) s...
posted on 6 Nov 2019
I applied via Naukri.com and was interviewed in Aug 2020. There were 3 interview rounds.
posted on 11 Apr 2021
I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.
Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.
Identifying the required personnel for a project
Recruiting and hiring personnel
Training and orienting personnel to the project
Assigning roles and responsibilities to personnel
Managing personnel performance and productivity
Ensuring compliance with labor laws and regulations
Examples include mobilizing a construc...
Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.
Create a detailed project budget and stick to it
Track expenses regularly and adjust budget as needed
Identify and eliminate unnecessary expenses
Negotiate with vendors for better pricing
Implement cost-saving measures without compromising quality
Use project management tools to monitor expenses and progress
Reg...
Handling clients requires effective communication, understanding their needs, and providing timely solutions.
Listen actively to their concerns and requirements
Communicate clearly and professionally
Provide timely updates and solutions
Build a strong relationship based on trust and respect
Be proactive in identifying and addressing potential issues
Ensure customer satisfaction by going above and beyond expectations
Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.
Identify the need for manpower
Plan the recruitment process
Source and screen candidates
Conduct interviews and assessments
Select and hire candidates
Provide training and orientation
Deploy manpower to required locations
I applied via Job Portal and was interviewed in Oct 2020. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Mar 2021. There were 6 interview rounds.
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
The question is unclear and lacks context.
Please provide more information about the 'update shuttering system'.
Specify the time frame for the updates.
Clarify the purpose or objective of the updates.
Provide any relevant examples or scenarios.
I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.
As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.
I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.
While working on a formwork or quality team would be valuable experi...
Concrete is the most important as it provides the strength and durability to the structure.
Concrete is the backbone of any RCC structure.
It provides the strength and durability to the structure.
Reinforcements and formwork are important too, but without concrete, they are useless.
Proper mix design and curing of concrete are crucial for the longevity of the structure.
I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.
Mix design of concrete and BTech project
Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete
Factors like strength, workability, durability, and cost are considered while designing the mix
BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design
Examples of BTech projects...
based on 1 interview
Interview experience
based on 32 reviews
Rating in categories
Civil Engineer
151
salaries
| ₹3 L/yr - ₹9.3 L/yr |
Mechanical Engineer
108
salaries
| ₹3.4 L/yr - ₹6 L/yr |
Assistant Manager
106
salaries
| ₹4.8 L/yr - ₹18 L/yr |
Inspection Engineer
96
salaries
| ₹3.3 L/yr - ₹10 L/yr |
Engineer
91
salaries
| ₹3 L/yr - ₹10 L/yr |
L&T Construction
Simplex Infrastructures
AECOM
L&T Energy Hydrocarbon