i
Reliable Autotech
Filter interviews by
I appeared for an interview before Jun 2022.
How is your Previous experience ?
Top trending discussions
I applied via Referral and was interviewed before Aug 2022. There was 1 interview round.
Defects in injection molding can include issues like warping, sink marks, flash, and short shots.
Warping: occurs when the part cools unevenly, leading to distortion
Sink marks: caused by uneven cooling or insufficient packing pressure
Flash: excess material around the edges of the part due to poor mold alignment or excessive injection pressure
Short shots: incomplete filling of the mold cavity, resulting in a part that is
Factors affecting defects include material quality, production process, human error, and environmental conditions.
Material quality: Poor quality materials can lead to defects in the final product.
Production process: Inefficient or flawed production processes can result in defects.
Human error: Mistakes made by workers during manufacturing can cause defects.
Environmental conditions: Factors like temperature, humidity, an
I applied via Recruitment Consultant and was interviewed in Jan 2020. There were 6 interview rounds.
My area of interest is strategic planning and business development.
Strategic planning
Business development
Market analysis
Competitive intelligence
Partnership and alliance building
The tool design process starts with understanding the requirements and creating a design concept.
Understand the requirements and specifications of the tool
Identify the purpose and functionality of the tool
Create a design concept based on the requirements
Consider factors such as ergonomics, materials, and manufacturing processes
Develop detailed drawings and specifications
Prototype and test the design
Make necessary adjus...
I applied via Approached by Company and was interviewed before Nov 2022. There were 4 interview rounds.
All manufacturing process
I applied via Referral and was interviewed in Jan 2023. There were 2 interview rounds.
Ensure efficient dispatch by optimizing routes, tracking inventory, and prioritizing urgent orders.
Implement a route optimization software to minimize travel time and fuel costs.
Maintain accurate inventory records to avoid stockouts and delays.
Prioritize urgent orders and communicate any delays to customers.
Train dispatchers to handle unexpected situations and make quick decisions.
Regularly review and analyze dispatch
I applied via Referral and was interviewed in Dec 2022. There were 3 interview rounds.
There are three main types of defects in engineering: design defects, manufacturing defects, and usage defects.
Design defects occur when there is an issue with the initial design of a product, leading to problems in its functionality or safety. For example, a car with a faulty braking system due to a design flaw.
Manufacturing defects happen during the production process, resulting in a product that does not meet the in...
The 7 wastes refer to inefficiencies in a process that can be eliminated to improve productivity and quality.
Transportation: Unnecessary movement of materials or products
Inventory: Excess inventory leading to waste of resources
Motion: Unnecessary movement of people
Waiting: Idle time in a process
Overproduction: Producing more than needed
Overprocessing: Doing more work than necessary
Defects: Errors that require rework or
Line balance refers to distributing workload evenly among different stations in a production line to optimize efficiency.
Line balance ensures that each station in the production line has a similar amount of work to do.
It helps in preventing bottlenecks and maximizing throughput.
Line balance can be achieved by adjusting the cycle times at each station or by adding/subtracting workstations.
An example of line balance is i...
To reduce defects and increase productivity, focus on continuous improvement, training, quality control, and efficient processes.
Implement a quality control system to catch defects early on
Provide regular training to employees to improve skills and knowledge
Analyze data to identify root causes of defects and implement corrective actions
Streamline processes to eliminate waste and improve efficiency
OEE stands for Overall Equipment Effectiveness, a measure of how well a manufacturing process is utilized.
OEE is calculated by multiplying Availability, Performance, and Quality.
Factors affecting OEE include equipment downtime, speed loss, and defects in production.
Improving OEE involves reducing downtime, increasing production speed, and minimizing defects.
For example, implementing preventive maintenance can reduce eq
I applied via Referral and was interviewed in Nov 2021. There were 5 interview rounds.
based on 1 interview
Interview experience
Senior Officer
64
salaries
| ₹2.2 L/yr - ₹5.5 L/yr |
Junior Executive
48
salaries
| ₹3.9 L/yr - ₹7.2 L/yr |
Executive
42
salaries
| ₹4 L/yr - ₹8.4 L/yr |
Assistant Manager
29
salaries
| ₹8 L/yr - ₹13.4 L/yr |
Senior Executive
29
salaries
| ₹5.9 L/yr - ₹10.8 L/yr |
JBM Group
Subros
Varroc Group
Endurance Technologies