I applied via Referral and was interviewed before Oct 2023. There was 1 interview round.
Rate analysis for building items involves calculating the cost of materials, labor, and overhead for each item in a construction project.
Rate analysis helps in determining the cost of each building item based on material and labor costs.
It involves breaking down the total cost into components like material cost, labor cost, and overhead expenses.
Rate analysis helps in estimating the total project cost accurately.
For ex...
Material rates of building materials vary based on factors like location, quality, and demand.
Material rates can vary based on the location of the construction site.
The quality of the building materials can also impact the rates.
Demand for certain materials can cause fluctuations in prices.
For example, the rate of cement in urban areas may be higher compared to rural areas.
Higher quality bricks may cost more than lower...
I applied via Approached by Company and was interviewed in Jul 2022. There was 1 interview round.
My strength is my ability to lead and motivate a team towards achieving goals.
Effective communication skills
Strong decision-making abilities
Ability to delegate tasks efficiently
Positive attitude towards challenges
Experience in managing teams
Motivational skills
Goal-oriented mindset
I will assess the situation and take necessary actions to minimize the impact on the project timeline.
Check with the supplier for the reason of delay and expected delivery date
Evaluate the impact on the project timeline and inform the project team
Explore alternative options such as sourcing from a different supplier or adjusting the project schedule
Communicate the revised plan to all stakeholders and ensure timely deli...
To calculate cement and sand for 1 sqm cm 1:4, use the formula: (1/5.5) * 1 = 0.18 cubic meters of cement and (4/5.5) * 1 = 0.73 cubic meters of sand.
The ratio of cement to sand is 1:4
Calculate the total volume of the mixture, which is 1 sqm cm
Divide the total volume by the sum of the ratio (1+4=5)
Multiply the quotient by the individual ratio to get the volume of cement and sand
Convert the volume to weight using the de
Price escalation refers to the increase in the price of goods or services over time.
It is a common phenomenon in the market due to inflation, changes in demand and supply, and other economic factors.
Price escalation can also occur due to changes in the cost of production, such as raw material costs, labor costs, and transportation costs.
For example, the price of gasoline may escalate due to an increase in the cost of c...
I have 5 years of experience in management roles, including 2 years as an Assistant Manager.
5 years of management experience
2 years as an Assistant Manager
Successfully led a team of 10 employees
Implemented new strategies to improve productivity and efficiency
Trained and mentored new employees
The thickness of subgrade varies depending on the type of construction and soil conditions.
The thickness of subgrade is determined based on the load-bearing capacity required for the structure.
It is typically measured in inches or centimeters.
For example, in road construction, the subgrade thickness can range from 6 to 12 inches.
In building construction, it may vary from a few inches to several feet depending on the bu
Ramky Infrastructure interview questions for designations
I applied via Walk-in and was interviewed before Jul 2020. There were 4 interview rounds.
Get interview-ready with Top Ramky Infrastructure Interview Questions
Top trending discussions
I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.
Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.
The vessel or pipeline is filled with water and pressurized to a specified level
The pressure is held for a specified amount of time to check for leaks or deformations
The test is usually performed before commissioning or after repairs
The test pressure and duration are deter...
HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.
Ensure the HDD is compatible with the computer system
Physically install the HDD in the appropriate bay
Connect the necessary cables to the HDD and motherboard
Configure the HDD in the BIOS settings
Format the HDD and install the operating system
Test the HDD for proper functionality
posted on 22 Apr 2022
I applied via Recruitment Consulltant and was interviewed in Mar 2022. There was 1 interview round.
posted on 11 Jul 2022
I applied via Walk-in and was interviewed in Jan 2022. There were 3 interview rounds.
The percentage of coupler and rebar lapping varies depending on the project specifications and design requirements.
The percentage of coupler and rebar lapping is determined by the engineer or designer based on the project specifications.
The percentage can range from 25% to 100% depending on the design requirements.
Coupler lapping is typically used in situations where the rebar cannot be overlapped due to space constrai...
posted on 31 Dec 2022
I applied via Approached by Company and was interviewed in Dec 2022. There were 3 interview rounds.
posted on 5 Jan 2025
based on 1 interview
Interview experience
based on 18 reviews
Rating in categories
Assistant Manager
109
salaries
| ₹3.6 L/yr - ₹9 L/yr |
Engineer
97
salaries
| ₹2.2 L/yr - ₹5 L/yr |
Senior Engineer
76
salaries
| ₹2.9 L/yr - ₹6.7 L/yr |
Deputy Manager
59
salaries
| ₹5.9 L/yr - ₹12 L/yr |
Senior Assistant Manager
56
salaries
| ₹5.1 L/yr - ₹9.2 L/yr |
L&T Construction
Simplex Infrastructures
ITD Cementation India
Ashoka Buildcon