I applied via Approached by Company and was interviewed in May 2023. There were 4 interview rounds.
Tension zone of columns is the area above the floor level where lapping of reinforcement is not allowed. Lift pit depth for high rise buildings is typically between 1300mm to 1500mm. Pile work at building construction involves surveying, selecting road crown levels, fixing pile cap top level, pointing out and fixing pile points, fixing center line of each pile, driving beller, using tremie pipes for concrete pouring, a...
IP&SR sites refer to inspection platforms and service roads for canal work. CBL stands for Cannel Bed Level and IH stands for Instrument Height.
IP stands for inspection platforms located opposite the SR site for canal work.
SR stands for service road located opposite the IP site of the canal cross section.
CBL refers to Cannel Bed Level, which is the level of the bed of the canal.
IH stands for Instrument Height, which is...
NBL stands for Nala bed level and DBC stands for Down box culvert in civil engineering.
NBL refers to the level of a drainage channel or nala bed in a civil engineering project.
DBC refers to a type of culvert that is installed below the ground level to allow water to flow underneath a road or structure.
Understanding NBL and DBC is crucial for proper drainage and water management in civil engineering projects.
Haunch is an inclined bar placing between a vertical wall and the base of a structure. Admixtures are used for transporting concrete over long distances. Bleeding is the separation of course aggregate from concrete.
Haunch is a foundation part that provides additional support and stability to a structure.
Admixtures are added to concrete to improve its workability, durability, and strength. For example, water-reducing ad...
The role of a Quality Control Incharge is to ensure that products meet quality standards by overseeing the testing and inspection of materials and products.
Developing and implementing quality control systems and procedures
Training and supervising QC staff
Conducting quality inspections and audits
Identifying and resolving quality issues
Collaborating with production and other departments to improve quality
Maintaining reco...
Introduction, explanation of GST and its reconciliation process, and due dates of GST return filing.
Introduce yourself briefly, highlighting your experience in accounts and taxation.
GST stands for Goods and Services Tax, a unified tax system implemented in India in 2017.
GST reconciliation process involves matching the data uploaded by the supplier with the data uploaded by the recipient, and making necessary adjustment...
TDS working filing dates and sections with brief decryption.
TDS stands for Tax Deducted at Source.
TDS is deducted from the income of the recipient and deposited with the government.
The due date for filing TDS returns is 31st July for Q1, 31st October for Q2, 31st January for Q3, and 31st May for Q4.
Section 192 deals with TDS on salary, Section 194 deals with TDS on dividends, and Section 194C deals with TDS on contract...
Raj Path Infracon interview questions for popular designations
I applied via Referral and was interviewed before Nov 2020. There were 3 interview rounds.
There are three types of roads: National Highways, State Highways, and Village Roads.
National Highways are maintained by the central government and connect major cities and towns.
State Highways are maintained by the state government and connect district headquarters and important cities.
Village Roads are maintained by the local government and connect villages to nearby towns and cities.
Other types of roads include expr...
The layers of a road include subgrade, subbase, base, and surface course.
Subgrade: natural soil or improved soil beneath the pavement
Subbase: layer of aggregate material placed on top of the subgrade
Base: layer of asphalt or concrete placed on top of the subbase
Surface course: top layer of asphalt or concrete that provides a smooth riding surface
Cross section shows the layers in a vertical view
posted on 10 Sep 2017
I was interviewed before Sep 2016.
I want to join the company because of its innovative projects and strong company culture.
I am impressed by the company's track record of successful projects.
I believe the company's values align with my own professional goals.
I am excited about the opportunity to work with a talented team of professionals.
I see great potential for growth and development within the company.
I am a dedicated and hardworking individual with relevant skills and experience.
I have a strong work ethic and am committed to delivering high-quality results.
I have relevant experience and skills that align with the requirements of the position.
I am a quick learner and adaptable to new environments.
I am passionate about the industry and eager to contribute to the team.
I would like to work in a marketing and communications profile.
Experience in creating marketing campaigns
Strong communication skills
Ability to analyze market trends and consumer behavior
Proficiency in social media and digital marketing
Collaboration with cross-functional teams
posted on 20 Feb 2015
Some of the top questions asked at the Raj Path Infracon interview -
based on 4 interviews
Interview experience
based on 70 reviews
Rating in categories
Highway Engineer
13
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
13
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Structural Engineer
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Hindustan Construction Company