Filter interviews by
I applied via Referral and was interviewed before Nov 2023. There was 1 interview round.
Coordinates are sets of numbers used to determine the position of a point in a space or on a map.
Coordinates consist of latitude and longitude values
Latitude measures how far north or south a point is from the equator
Longitude measures how far east or west a point is from the Prime Meridian
Coordinates are commonly used in GPS systems to pinpoint locations
Utilize the TBM efficiently by strategically connecting instruments
Prioritize critical instruments for connection first
Consider using multiplexers to connect multiple instruments to one TBM
Implement a communication protocol to ensure smooth data transfer
Ensure proper calibration and testing of connected instruments
Have a backup plan in case of TBM failure
Level work involves using a level instrument to determine the elevation of points on the ground.
Set up the level instrument at a known benchmark point
Take readings at various points to determine their elevations
Use the leveling rod to measure the height difference between the instrument and the ground
Calculate the elevation of each point based on the readings
Ensure the instrument is properly calibrated for accurate res
Data can be imported in AutoCad using the 'Data Extraction' tool.
Open the drawing in AutoCad
Go to the 'Insert' tab and click on 'Data Extraction'
Select the objects from which you want to extract data
Choose the properties you want to extract
Save the extracted data as a .csv file
To check errors in a Total Station, perform a calibration check and ensure proper leveling and alignment.
Perform a calibration check by measuring a known distance and comparing it to the Total Station's measurement.
Ensure the Total Station is properly leveled and aligned before taking measurements.
Check for any physical damage or obstructions that may affect the accuracy of the Total Station.
Verify that the instrument ...
Transverse survey involves measuring distances and angles to determine the position of points on the ground.
Set up the theodolite at a known point and measure a back sight to a benchmark.
Take foresight readings to the points to be surveyed, recording both the horizontal and vertical angles.
Measure the distances using a tape or EDM.
Calculate the coordinates of the points using trigonometry and the measured angles and di...
Top trending discussions
posted on 14 Jan 2025
posted on 29 Nov 2024
I applied via Company Website and was interviewed in Oct 2024. There were 2 interview rounds.
They are as a friendly asked questions what you did past service as before organization.
Blaming staff without evidence is unprofessional and can damage morale and trust within the team.
Avoid jumping to conclusions without concrete evidence
Encourage open communication and transparency
Focus on problem-solving rather than assigning blame
Provide constructive feedback and support to help staff improve
Lead by example and take responsibility for mistakes
Directors may not always be aware of thefts due to lack of oversight, trust in employees, or focus on other priorities.
Directors may not be directly involved in day-to-day operations where thefts occur
There may be a lack of proper oversight or monitoring mechanisms in place
Directors may trust their employees and not suspect them of theft
Directors may be focused on other strategic priorities and not pay attention to pot
posted on 20 Sep 2024
I applied via Naukri.com and was interviewed in Aug 2024. There were 2 interview rounds.
I applied via Referral and was interviewed in Jul 2024. There were 3 interview rounds.
Purchase Assignment - Comparing PO's
posted on 9 Feb 2025
I applied via Walk-in and was interviewed in May 2024. There was 1 interview round.
System implementation process involves planning, designing, testing, and deploying new software or hardware systems.
Planning phase involves defining project scope, setting goals, and creating a timeline.
Design phase includes creating system architecture, database design, and user interface.
Testing phase involves conducting various tests to ensure system functionality and performance.
Deployment phase includes installing...
Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.
Set clear performance expectations for team members
Provide regular feedback on performance
Track progress towards goals and objectives
Address any performance issues promptly and constructively
based on 1 interview
Interview experience
based on 7 reviews
Rating in categories
Accountant
4
salaries
| ₹1.8 L/yr - ₹2.1 L/yr |
Deputy Manager
4
salaries
| ₹7.5 L/yr - ₹10 L/yr |
Structural Engineer
4
salaries
| ₹2.4 L/yr - ₹5.4 L/yr |
Site Engineer
4
salaries
| ₹1.4 L/yr - ₹4.2 L/yr |
Civil Site Engineer
4
salaries
| ₹2.4 L/yr - ₹3.8 L/yr |
Millennium Engineers & Contractors
Karam Industries
S V S Projects India
MaRS Planning & Engineering Services