Add office photos
Rachana Infrastructure logo
Employer?
Claim Account for FREE

Rachana Infrastructure

3.5
based on 7 Reviews
Filter interviews by

Rachana Infrastructure Interview Questions and Answers

Updated 28 Nov 2024

Q1. What if we have only one TBM to connect instrument

Ans.

Utilize the TBM efficiently by strategically connecting instruments

  • Prioritize critical instruments for connection first

  • Consider using multiplexers to connect multiple instruments to one TBM

  • Implement a communication protocol to ensure smooth data transfer

  • Ensure proper calibration and testing of connected instruments

  • Have a backup plan in case of TBM failure

Add your answer
right arrow

Q2. How to Check error in Total station

Ans.

To check errors in a Total Station, perform a calibration check and ensure proper leveling and alignment.

  • Perform a calibration check by measuring a known distance and comparing it to the Total Station's measurement.

  • Ensure the Total Station is properly leveled and aligned before taking measurements.

  • Check for any physical damage or obstructions that may affect the accuracy of the Total Station.

  • Verify that the instrument is set to the correct units and coordinate system for the ...read more

Add your answer
right arrow

Q3. How to import data in AutoCad

Ans.

Data can be imported in AutoCad using the 'Data Extraction' tool.

  • Open the drawing in AutoCad

  • Go to the 'Insert' tab and click on 'Data Extraction'

  • Select the objects from which you want to extract data

  • Choose the properties you want to extract

  • Save the extracted data as a .csv file

Add your answer
right arrow

Q4. What are the coordinates

Ans.

Coordinates are sets of numbers used to determine the position of a point in a space or on a map.

  • Coordinates consist of latitude and longitude values

  • Latitude measures how far north or south a point is from the equator

  • Longitude measures how far east or west a point is from the Prime Meridian

  • Coordinates are commonly used in GPS systems to pinpoint locations

Add your answer
right arrow
Discover Rachana Infrastructure interview dos and don'ts from real experiences

Q5. How to do Tranverse Survey

Ans.

Transverse survey involves measuring distances and angles to determine the position of points on the ground.

  • Set up the theodolite at a known point and measure a back sight to a benchmark.

  • Take foresight readings to the points to be surveyed, recording both the horizontal and vertical angles.

  • Measure the distances using a tape or EDM.

  • Calculate the coordinates of the points using trigonometry and the measured angles and distances.

  • Check the accuracy of the survey by closing the tr...read more

Add your answer
right arrow

Q6. How to do Level work

Ans.

Level work involves using a level instrument to determine the elevation of points on the ground.

  • Set up the level instrument at a known benchmark point

  • Take readings at various points to determine their elevations

  • Use the leveling rod to measure the height difference between the instrument and the ground

  • Calculate the elevation of each point based on the readings

  • Ensure the instrument is properly calibrated for accurate results

Add your answer
right arrow
Contribute & help others!
Write a review
Write a review
Share interview
Share interview
Contribute salary
Contribute salary
Add office photos
Add office photos

Interview Process at Rachana Infrastructure

based on 1 interviews
Interview experience
4.0
Good
View more
interview tips and stories logo
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories
Share an Interview
Profile Image
Hello, Guest
Awards 2025
Contribute to help millions!
Write a review
Write a review
Share interview
Share interview
Contribute salary
Contribute salary
Add office photos
Add office photos
Add office benefits
Add office benefits
Stay ahead in your career with AmbitionBox app