Coordinates are sets of numbers used to determine the position of a point in a space or on a map.
Coordinates consist of latitude and longitude values
Latitude measures how far north or south a point is from the equator
Longitude measures how far east or west a point is from the Prime Meridian
Coordinates are commonly used in GPS systems to pinpoint locations
Utilize the TBM efficiently by strategically connecting instruments
Prioritize critical instruments for connection first
Consider using multiplexers to connect multiple instruments to one TBM
Implement a communication protocol to ensure smooth data transfer
Ensure proper calibration and testing of connected instruments
Have a backup plan in case of TBM failure
Level work involves using a level instrument to determine the elevation of points on the ground.
Set up the level instrument at a known benchmark point
Take readings at various points to determine their elevations
Use the leveling rod to measure the height difference between the instrument and the ground
Calculate the elevation of each point based on the readings
Ensure the instrument is properly calibrated for accurate res
Data can be imported in AutoCad using the 'Data Extraction' tool.
Open the drawing in AutoCad
Go to the 'Insert' tab and click on 'Data Extraction'
Select the objects from which you want to extract data
Choose the properties you want to extract
Save the extracted data as a .csv file
To check errors in a Total Station, perform a calibration check and ensure proper leveling and alignment.
Perform a calibration check by measuring a known distance and comparing it to the Total Station's measurement.
Ensure the Total Station is properly leveled and aligned before taking measurements.
Check for any physical damage or obstructions that may affect the accuracy of the Total Station.
Verify that the instrument ...
Transverse survey involves measuring distances and angles to determine the position of points on the ground.
Set up the theodolite at a known point and measure a back sight to a benchmark.
Take foresight readings to the points to be surveyed, recording both the horizontal and vertical angles.
Measure the distances using a tape or EDM.
Calculate the coordinates of the points using trigonometry and the measured angles and di...
Top trending discussions
posted on 6 Jan 2021
I applied via Approached by Company and was interviewed before Jan 2020. There were 2 interview rounds.
To submit client related documents, follow these steps:
Ensure all required documents are complete and accurate
Organize the documents in a logical order
Create a cover letter or email explaining the purpose of the submission
Use a secure method of transmission, such as email with password protection or a secure file-sharing platform
Confirm receipt of the documents with the client
Maintain a record of all submitted document
I applied via Company Website and was interviewed in May 2021. There was 1 interview round.
The principle of surveying involves measuring and mapping the Earth's surface to determine the relative positions of points.
Surveying is used to establish property boundaries, create topographic maps, and plan construction projects.
The principle of surveying relies on accurate measurements using various instruments such as total stations, GPS receivers, and levels.
Surveyors use mathematical calculations and trigonometr...
based on 1 review
Rating in categories
Accountant
4
salaries
| ₹1.8 L/yr - ₹2.1 L/yr |
Deputy Manager
4
salaries
| ₹7.5 L/yr - ₹10 L/yr |
Structural Engineer
4
salaries
| ₹2.4 L/yr - ₹5.4 L/yr |
Site Engineer
4
salaries
| ₹1.4 L/yr - ₹4.2 L/yr |
Civil Site Engineer
4
salaries
| ₹2.4 L/yr - ₹3.8 L/yr |
Millennium Engineers & Contractors
Karam Industries
S V S Projects India
MaRS Planning & Engineering Services