I applied via Company Website and was interviewed in Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Group Discussion 

We are using the good thing.then leadership,social also we have handled.

Round 3 - Technical 

(3 Questions)

  • Q1. We have thinking about technology then so the different models.
  • Q2. Survivor he the one part in construction field. Then designer, AutoCAD,concrete it's all are important.
  • Q3. What is main reason failure The construction
  • Ans. 

    Poor planning and lack of communication are the main reasons for construction failure.

    • Poor planning and design

    • Lack of communication between stakeholders

    • Inadequate supervision and inspection

    • Use of substandard materials and equipment

    • Unforeseen environmental factors

    • Inaccurate surveying and measurements

    • Human error and negligence

  • Answered by AI

Interview Preparation Tips

Topics to prepare for ADARSH DEVELOPERS Survey Engineer interview:
  • Quantity Surveying
Interview preparation tips for other job seekers - Main thing customers relationships it's very important.
Then communication skills it's important.

Interview questions from similar companies

I applied via Company Website and was interviewed in May 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Type of work I am doing in previous company
  • Q2. All construction activities I handeld

Interview Preparation Tips

Interview preparation tips for other job seekers - Good Company & Good Culture
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. About yourself and work experience related
  • Q2. About MTECH thesis
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Aug 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(6 Questions)

  • Q1. Aluminium Formwork activity brief description.
  • Ans. 

    Aluminium formwork is a construction technique that uses lightweight aluminium panels to form concrete walls, floors, and columns.

    • Aluminium formwork is a modern construction technique that is faster and more efficient than traditional formwork methods.

    • It involves using lightweight aluminium panels that are easy to handle and can be reused multiple times.

    • The panels are assembled on site to form the desired shape and siz...

  • Answered by AI
  • Q2. Waterproofing Procedure
  • Ans. 

    Waterproofing procedure involves applying a waterproof barrier to prevent water from penetrating a building structure.

    • Identify the areas that need waterproofing such as roofs, walls, and foundations.

    • Choose the appropriate waterproofing material based on the type of structure and the level of water exposure.

    • Prepare the surface by cleaning and repairing any cracks or damage.

    • Apply the waterproofing material using the reco...

  • Answered by AI
  • Q3. External Development area step by step activities
  • Q4. What is Steel Fibre Road Concrete?
  • Ans. 

    Steel Fibre Road Concrete is a type of concrete that contains steel fibres to improve its strength and durability.

    • Steel fibres are added to the concrete mix to enhance its mechanical properties.

    • The fibres act as reinforcement and help to prevent cracking and improve resistance to wear and tear.

    • Steel Fibre Road Concrete is commonly used in the construction of roads, bridges, and other infrastructure projects.

    • It is also ...

  • Answered by AI
  • Q5. Piling works what i had done
  • Ans. 

    I have experience in piling works including design, installation, and testing of piles.

    • Designed pile foundations for various structures including bridges and buildings

    • Installed piles using various methods such as driven piles and drilled shafts

    • Conducted pile load tests to ensure the capacity of the piles

    • Managed and supervised piling works on construction sites

    • Ensured compliance with safety regulations and quality stand

  • Answered by AI
  • Q6. Concrete technology for site activity
  • Ans. 

    Concrete technology is crucial for site activity as it involves the proper mixing, placing, and curing of concrete.

    • Understanding the properties of concrete and how it reacts to different conditions

    • Proper mixing of concrete ingredients to achieve the desired strength and consistency

    • Ensuring proper placement and compaction of concrete to avoid voids and weak spots

    • Proper curing of concrete to achieve maximum strength and ...

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Why i want to leave the current company
  • Q2. What is my expectation for their organisation

Interview Preparation Tips

Interview preparation tips for other job seekers - Technically u need to have a microlevel knowledge.

Interview Questionnaire 

2 Questions

  • Q1. What projects i had done in Bachelors?
  • Ans. 

    I completed various projects during my Bachelor's degree, including a design project for a new bridge and a research project on renewable energy.

    • Designed a new bridge using CAD software

    • Researched and implemented renewable energy sources on campus

    • Collaborated with classmates on a group project to improve campus sustainability

  • Answered by AI
  • Q2. Where i did my 6 months internship?
  • Ans. 

    I completed my 6 months internship at ABC Engineering Firm, where I gained hands-on experience in project management and design.

    • Internship at ABC Engineering Firm

    • Focused on project management and design

    • Hands-on experience gained

  • Answered by AI

Interview Preparation Tips

Round: Technical Interview
Experience: I was fresher, so they usually ask me about my university projects and my final training.
Tips: It will be good if you relate your projects with the company profile.

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Rate Analysis , Reconciliation of materials
  • Q2. Coefficient of cement
  • Ans. 

    The coefficient of cement is a measure of its ability to expand or contract due to changes in temperature or moisture.

    • The coefficient of cement is also known as the coefficient of thermal expansion.

    • It is an important factor to consider in construction projects to prevent cracking or damage to structures.

    • The coefficient of cement varies depending on the type and composition of the cement.

    • For example, Portland cement typ...

  • Answered by AI
  • Q3. Escalation of materials
  • Ans. 

    Escalation of materials refers to the process of increasing the priority or urgency of obtaining necessary materials for a project.

    • Escalation may occur when there are delays in the delivery of materials or when the demand for materials exceeds the supply.

    • Project managers may escalate materials by contacting suppliers to expedite delivery or by seeking alternative sources for the materials.

    • Escalation can impact project ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company , well balanced life, flexible time
Job security

I applied via Naukri.com and was interviewed before Mar 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Water Treatment Process.
  • Q2. Pumps Head discharge curves
  • Q3. Laying of Pipeline and QC.

Interview Preparation Tips

Interview preparation tips for other job seekers - Please never mention any thing in your resume which you are not aware off.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Chiller efficiency
  • Ans. 

    Chiller efficiency is a measure of how well a chiller unit is able to cool a space while using the least amount of energy.

    • Chiller efficiency is typically measured by the Coefficient of Performance (COP), which is the ratio of cooling output to energy input.

    • Regular maintenance and cleaning of chiller components can improve efficiency.

    • Upgrading to a more energy-efficient chiller model can also increase efficiency.

    • Proper ...

  • Answered by AI
  • Q2. Which one more efficiently? Air cooled,or water cooled???
  • Ans. 

    Water cooled systems are generally more efficient than air cooled systems due to higher heat transfer capabilities.

    • Water has higher heat transfer capabilities compared to air

    • Water cooled systems can maintain more consistent temperatures

    • Water cooled systems are typically used in high performance applications such as data centers and industrial machinery

  • Answered by AI
  • Q3. How we improved duct velocity?
  • Ans. 

    Duct velocity can be improved by increasing the fan speed or reducing the duct size.

    • Increase the fan speed to increase the air velocity in the duct.

    • Reduce the duct size to increase the air velocity.

    • Use dampers or adjustable louvers to control and optimize the airflow.

    • Ensure proper sealing of duct joints to minimize air leakage.

    • Consider using smooth and straight ducts to reduce friction and improve airflow.

    • Regularly cle...

  • Answered by AI
  • Q4. What types of gas use chiller system?
  • Ans. 

    The chiller system uses various types of gases for cooling purposes.

    • Common types of gases used in chiller systems include R-134a, R-410A, and ammonia.

    • R-134a is a hydrofluorocarbon (HFC) refrigerant commonly used in air conditioning systems.

    • R-410A is a blend of hydrofluorocarbons used as a replacement for older refrigerants.

    • Ammonia (NH3) is often used in industrial chiller systems due to its high cooling capacity.

    • Other ...

  • Answered by AI
  • Q5. How we decided the vrf system capacity as per area??
  • Ans. 

    The VRF system capacity is determined based on the area's cooling and heating load requirements.

    • Calculate the total cooling load and heating load for the area

    • Consider factors such as insulation, windows, occupancy, and equipment

    • Select VRF system capacity based on the calculated load requirements

    • Consult with HVAC professionals for accurate sizing

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical round is more important than other rounds so we should prepare that things very easily putting during interview and most important things candidates CV,whatever he mension his cv technically should be know very well' 🙏
Round 1 - Technical 

(1 Question)

  • Q1. Regarding Concrete and Finishing Work

Interview Preparation Tips

Interview preparation tips for other job seekers - Do some technical studies before interview

Junior Engineer Interview Questions & Answers

Nyati Group user image Chandan Shirbhayye

posted on 16 Mar 2025

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview in Feb 2025, where I was asked the following questions.

  • Q1. Have you ever used ERP ? And which one
  • Q2. Tell me about your past experience in your previous company

Interview Preparation Tips

Interview preparation tips for other job seekers - For junior level you will get good experience in this company

ADARSH DEVELOPERS Interview FAQs

How many rounds are there in ADARSH DEVELOPERS Survey Engineer interview?
ADARSH DEVELOPERS interview process usually has 3 rounds. The most common rounds in the ADARSH DEVELOPERS interview process are Resume Shortlist, Group Discussion and Technical.
What are the top questions asked in ADARSH DEVELOPERS Survey Engineer interview?

Some of the top questions asked at the ADARSH DEVELOPERS Survey Engineer interview -

  1. What is main reason failure The construct...read more
  2. Survivor he the one part in construction field. Then designer, AutoCAD,concrete...read more
  3. We have thinking about technology then so the different mode...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

InvestoXpert Interview Questions
4.1
 • 63 Interviews
Knight Frank Interview Questions
4.0
 • 44 Interviews
Smartworks Interview Questions
3.6
 • 33 Interviews
Aliens Group Interview Questions
3.2
 • 30 Interviews
Nyati Group Interview Questions
4.2
 • 29 Interviews
Berkadia Interview Questions
3.9
 • 28 Interviews
SMEC Interview Questions
3.7
 • 27 Interviews
Xanadu Interview Questions
3.5
 • 26 Interviews
View all

ADARSH DEVELOPERS Survey Engineer Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Project Engineer
22 salaries
unlock blur

₹5.9 L/yr - ₹10.2 L/yr

Deputy Project Engineer
17 salaries
unlock blur

₹4.2 L/yr - ₹7 L/yr

Senior Site Engineer
14 salaries
unlock blur

₹3.6 L/yr - ₹6.8 L/yr

Senior Accounts Executive
11 salaries
unlock blur

₹5 L/yr - ₹6.8 L/yr

Site Engineer
11 salaries
unlock blur

₹3 L/yr - ₹5.2 L/yr

Explore more salaries
Compare ADARSH DEVELOPERS with

Knight Frank

4.0
Compare

R.S. Infraprojects

3.9
Compare

SMEC

3.7
Compare

BPTP

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview