Pushkar Raj Construction Civil Site Engineer Interview Questions and Answers

Updated 3 Jan 2024

11 Interview questions

A Civil Site Engineer was asked
Q. What is surveying?
Ans. 

Survey is the process of measuring and mapping the physical features of a land area.

  • Survey is used to determine the boundaries, contours, and elevations of a piece of land.

  • It involves the use of various instruments and techniques to collect data about the land.

  • Survey data is used in the design and construction of infrastructure projects.

  • Examples of surveys include topographic surveys, boundary surveys, and constru...

A Civil Site Engineer was asked
Q. What is estimation?
Ans. 

Estimation is the process of calculating the approximate cost, time, and resources required for a construction project.

  • Estimation involves analyzing the project requirements and specifications.

  • It includes determining the quantities of materials, labor, and equipment needed.

  • Estimation also considers factors like project duration, site conditions, and potential risks.

  • Various methods like quantity takeoff, cost datab...

Civil Site Engineer Interview Questions Asked at Other Companies

Q1. What is the minimum grade of concrete used in RCC works?
Q2. If you have a 10x10 feet room and you have 600x600 mm size tiles, ... read more
asked in TCE
Q3. If your M50 concrete's 28-day cube test result is below 100%, wha ... read more
Q4. 1.What is the thickness of plastering?, 2.What is name of plaster ... read more
Q5. What is the shelf life of an open bag of cement?
A Civil Site Engineer was asked
Q. What are columns?
Ans. 

Columns are vertical structural elements that support the weight of a building or structure.

  • Columns are typically made of materials such as concrete, steel, or wood.

  • They are designed to transfer the load from the upper parts of the structure to the foundation.

  • Columns come in various shapes and sizes, including rectangular, circular, and square.

  • They are often used in combination with beams and slabs to form the fra...

A Civil Site Engineer was asked
Q. What is a simply supported beam?
Ans. 

A simply supported beam is a structural element that is supported at both ends and is free to rotate and deflect under load.

  • A simply supported beam is one of the most common types of structural elements used in construction.

  • It consists of a beam that is supported at two points, typically with pins or rollers.

  • The beam is free to rotate and deflect under load, allowing it to distribute the applied forces.

  • Simply supp...

A Civil Site Engineer was asked
Q. What is RCC?
Ans. 

RCC stands for Reinforced Cement Concrete.

  • RCC is a composite material made of concrete and reinforcement bars.

  • It is widely used in construction for its strength and durability.

  • The reinforcement bars, usually made of steel, are embedded in the concrete to enhance its tensile strength.

  • RCC is commonly used in the construction of buildings, bridges, dams, and other structures.

  • It provides structural integrity and helps...

A Civil Site Engineer was asked
Q. What is a foundation?
Ans. 

The foundation is the lowermost part of a structure that transfers the load of the structure to the underlying soil or rock.

  • It provides stability and prevents settlement of the structure.

  • Foundations can be shallow or deep, depending on the soil conditions and the size of the structure.

  • Common types of foundations include spread footings, pile foundations, and mat foundations.

  • For example, a building with a spread fo...

A Civil Site Engineer was asked
Q. What is the full form of Civil Engineer?
Ans. 

The full form of Civil Engineer is a professional who designs, constructs, and maintains infrastructure projects.

  • Civil Engineer stands for a professional who specializes in the planning, design, construction, and maintenance of infrastructure projects.

  • They are responsible for ensuring the safety, functionality, and sustainability of structures such as buildings, bridges, roads, dams, and more.

  • Civil Engineers work ...

Are these interview questions helpful?
A Civil Site Engineer was asked
Q. What is the compressive strength?
Ans. 

Compressive strength is the maximum amount of compressive stress a material can withstand before it fails.

  • Compressive strength measures a material's ability to resist compression forces.

  • It is an important property in civil engineering, as it determines the load-bearing capacity of structures.

  • Compressive strength is typically measured in units of force per unit area, such as pounds per square inch (psi) or megapasc...

A Civil Site Engineer was asked
Q. What is the cement-concrete ratio?
Ans. 

The cement concrete ratio refers to the proportion of cement to aggregates in a concrete mixture.

  • The ratio is typically expressed as a combination of cement, sand, and coarse aggregates.

  • For example, a common ratio for general construction is 1:2:4, which means one part cement, two parts sand, and four parts coarse aggregates.

  • The ratio may vary depending on the desired strength, workability, and durability of the c...

A Civil Site Engineer was asked
Q. What is the BBS?
Ans. 

BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars required for a construction project.

  • BBS is used to provide information about the type, size, quantity, and placement of reinforcement bars in a structure.

  • It helps in estimating the amount of steel required and ensures proper reinforcement detailing.

  • BBS includes information about the cutting length, shape, and bending details of eac...

Pushkar Raj Construction Civil Site Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(12 Questions)

  • Q1. What is the BBS ?
  • Ans. 

    BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars required for a construction project.

    • BBS is used to provide information about the type, size, quantity, and placement of reinforcement bars in a structure.

    • It helps in estimating the amount of steel required and ensures proper reinforcement detailing.

    • BBS includes information about the cutting length, shape, and bending details of each bar...

  • Answered by AI
  • Q2. What is the Survey ?
  • Ans. 

    Survey is the process of measuring and mapping the physical features of a land area.

    • Survey is used to determine the boundaries, contours, and elevations of a piece of land.

    • It involves the use of various instruments and techniques to collect data about the land.

    • Survey data is used in the design and construction of infrastructure projects.

    • Examples of surveys include topographic surveys, boundary surveys, and construction...

  • Answered by AI
  • Q3. What is the RCC ?
  • Ans. 

    RCC stands for Reinforced Cement Concrete.

    • RCC is a composite material made of concrete and reinforcement bars.

    • It is widely used in construction for its strength and durability.

    • The reinforcement bars, usually made of steel, are embedded in the concrete to enhance its tensile strength.

    • RCC is commonly used in the construction of buildings, bridges, dams, and other structures.

    • It provides structural integrity and helps in w...

  • Answered by AI
  • Q4. What is the Estimation ?
  • Ans. 

    Estimation is the process of calculating the approximate cost, time, and resources required for a construction project.

    • Estimation involves analyzing the project requirements and specifications.

    • It includes determining the quantities of materials, labor, and equipment needed.

    • Estimation also considers factors like project duration, site conditions, and potential risks.

    • Various methods like quantity takeoff, cost databases,...

  • Answered by AI
  • Q5. What is the cement concrete ratio ?
  • Ans. 

    The cement concrete ratio refers to the proportion of cement to aggregates in a concrete mixture.

    • The ratio is typically expressed as a combination of cement, sand, and coarse aggregates.

    • For example, a common ratio for general construction is 1:2:4, which means one part cement, two parts sand, and four parts coarse aggregates.

    • The ratio may vary depending on the desired strength, workability, and durability of the concre...

  • Answered by AI
  • Q6. Full form of Civil Engineer ?
  • Ans. 

    The full form of Civil Engineer is a professional who designs, constructs, and maintains infrastructure projects.

    • Civil Engineer stands for a professional who specializes in the planning, design, construction, and maintenance of infrastructure projects.

    • They are responsible for ensuring the safety, functionality, and sustainability of structures such as buildings, bridges, roads, dams, and more.

    • Civil Engineers work on va...

  • Answered by AI
  • Q7. What is the simply supported beam ?
  • Ans. 

    A simply supported beam is a structural element that is supported at both ends and is free to rotate and deflect under load.

    • A simply supported beam is one of the most common types of structural elements used in construction.

    • It consists of a beam that is supported at two points, typically with pins or rollers.

    • The beam is free to rotate and deflect under load, allowing it to distribute the applied forces.

    • Simply supported...

  • Answered by AI
  • Q8. What is the compressive strength ?
  • Ans. 

    Compressive strength is the maximum amount of compressive stress a material can withstand before it fails.

    • Compressive strength measures a material's ability to resist compression forces.

    • It is an important property in civil engineering, as it determines the load-bearing capacity of structures.

    • Compressive strength is typically measured in units of force per unit area, such as pounds per square inch (psi) or megapascals (...

  • Answered by AI
  • Q9. What is the columns ?
  • Ans. 

    Columns are vertical structural elements that support the weight of a building or structure.

    • Columns are typically made of materials such as concrete, steel, or wood.

    • They are designed to transfer the load from the upper parts of the structure to the foundation.

    • Columns come in various shapes and sizes, including rectangular, circular, and square.

    • They are often used in combination with beams and slabs to form the framewor...

  • Answered by AI
  • Q10. What is the Foundation ?
  • Ans. 

    The foundation is the lowermost part of a structure that transfers the load of the structure to the underlying soil or rock.

    • It provides stability and prevents settlement of the structure.

    • Foundations can be shallow or deep, depending on the soil conditions and the size of the structure.

    • Common types of foundations include spread footings, pile foundations, and mat foundations.

    • For example, a building with a spread footing...

  • Answered by AI
  • Q11. Are you hard worker ?
  • Q12. What is the work in construction field for civil site engineer ?
  • Ans. 

    Civil site engineers oversee construction projects, ensuring quality, safety, and adherence to design specifications.

    • Project Planning: Develop detailed project plans and timelines, e.g., scheduling tasks for a bridge construction.

    • Site Management: Supervise daily operations on-site, ensuring work is performed according to plans and safety standards.

    • Quality Control: Conduct inspections and tests to ensure materials and w...

  • Answered by AI

Top trending discussions

View All
Interview Tips & Stories
1w (edited)
a team lead
Why are women still asked such personal questions in interview?
I recently went for an interview… and honestly, m still trying to process what just happened. Instead of being asked about my skills, experience, or how I could add value to the company… the questions took a totally unexpected turn. The interviewer started asking things like When are you getting married? Are you engaged? And m sure, if I had said I was married, the next question would’ve been How long have you been married? What does my personal life have to do with the job m applying for? This is where I felt the gender discrimination hit hard. These types of questions are so casually thrown at women during interviews but are they ever asked to men? No one asks male candidates if they’re planning a wedding or how old their kids are. So why is it okay to ask women? Can we please stop normalising this kind of behaviour in interviews? Our careers shouldn’t be judged by our relationship status. Period.
Got a question about Pushkar Raj Construction?
Ask anonymously on communities.

Interview questions from similar companies

I applied via Naukri.com and was interviewed in Jul 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About structur like, Shuttring and steel dia wise wait per/m special gravity of cement & aggregate, related QC

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

Civil Site Engineer Interview Questions Asked at Other Companies

Q1. What is the minimum grade of concrete used in RCC works?
Q2. If you have a 10x10 feet room and you have 600x600 mm size tiles, ... read more
asked in TCE
Q3. If your M50 concrete's 28-day cube test result is below 100%, wha ... read more
Q4. 1.What is the thickness of plastering?, 2.What is name of plaster ... read more
Q5. What is the shelf life of an open bag of cement?

I applied via Recruitment Consultant and was interviewed in Apr 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About HT/LT,Motor/Feeder & Substation Errection & Commission.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good Questions Are Asked.

I applied via Company Website and was interviewed in Jun 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. Why do you want this job?
  • Ans. I positively look forward to give my best to your organization.
  • Answered by Dhinesh Babu
  • Q2. What attracted you to this company?
  • Ans. The company is great are team work.
  • Answered by Dhinesh Babu
  • Q3. What are your strength?
  • Ans. I am very strong analytical skills.
  • Answered by Dhinesh Babu

Interview Preparation Tips

Interview preparation tips for other job seekers - Bring your sense of humor and smile.

Interview Questionnaire 

1 Question

  • Q1. What is density of cement
  • Ans. 

    The density of cement varies depending on the type of cement and its composition.

    • The density of ordinary Portland cement is around 3.15 g/cm³

    • The density of white cement is around 2.90 g/cm³

    • The density of low heat cement is around 3.0 g/cm³

    • The density of high alumina cement is around 3.0 g/cm³

    • The density of rapid hardening cement is around 3.15 g/cm³

  • Answered by AI

I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About self introduction , site execution planning, labour management ,client detailing , how to achieve site progress and all about to proceed work and details description what you mention in resume

Interview Preparation Tips

Interview preparation tips for other job seekers - Be polite, truth, what ever you face just tell them and positive with result oriented

I applied via Referral and was interviewed in Jun 2021. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. About previous work experience.
  • Q2. Work done over Manpower
  • Q3. Why I left my first job so early
  • Ans. 

    I left my first job early to pursue better growth opportunities and align my career with my long-term goals.

    • I realized that the role didn't align with my career aspirations, as I was seeking more challenging projects.

    • The company culture was not a good fit for me; I value collaboration and innovation, which I found lacking.

    • I received an offer for a position that provided more opportunities for professional development a...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and go through your resume properly. Try not to be fake
Are these interview questions helpful?
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Why should we hire you?
  • Ans. 

    I bring a strong blend of technical skills, practical experience, and a commitment to quality in civil engineering projects.

    • Proven experience in managing construction projects, such as a recent highway expansion that improved traffic flow by 30%.

    • Strong knowledge of engineering software like AutoCAD and Civil 3D, which enhances design accuracy and efficiency.

    • Excellent communication skills, enabling effective collaborati...

  • Answered by AI
  • Q2. Tell me about yourself.
  • Ans. 

    I am a Civil Site Engineer with experience in managing construction projects and ensuring compliance with regulations.

    • Experienced Civil Site Engineer

    • Skilled in managing construction projects

    • Knowledgeable in regulations and compliance

    • Strong attention to detail

    • Effective problem-solving skills

    • Excellent communication and teamwork abilities

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Nothing to say...........................................

I applied via Naukri.com and was interviewed in Feb 2021. There were 2 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Welding, qc, daily activities
  • Q2. Ndt test, valve industry

Interview Preparation Tips

Interview preparation tips for other job seekers - Little knowledge required but confidence is important

I applied via Walk-in and was interviewed before Mar 2021. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Where do you see yourself in 5 years?
  • Ans. 

    In five years, I envision myself as a senior civil site engineer, leading projects and mentoring junior engineers.

    • I aim to lead major infrastructure projects, such as bridges or highways, enhancing my project management skills.

    • I plan to obtain professional certifications, like PMP or PE, to solidify my expertise and credibility in the field.

    • I want to mentor junior engineers, sharing my knowledge and experience to help ...

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. Water supply project rwss and EPC industry project

Interview Preparation Tips

Interview preparation tips for other job seekers - Sir I'm civil engineer with water supply project and EPC industry project presently working gvpr engineer LTD my experience 8years

Pushkar Raj Construction Interview FAQs

How many rounds are there in Pushkar Raj Construction Civil Site Engineer interview?
Pushkar Raj Construction interview process usually has 1 rounds. The most common rounds in the Pushkar Raj Construction interview process are Technical.
What are the top questions asked in Pushkar Raj Construction Civil Site Engineer interview?

Some of the top questions asked at the Pushkar Raj Construction Civil Site Engineer interview -

  1. What is the work in construction field for civil site enginee...read more
  2. What is the simply supported bea...read more
  3. What is the compressive strengt...read more

Tell us how to improve this page.

Overall Interview Experience Rating

5/5

based on 1 interview experience

Difficulty level

Hard 100%

Duration

Less than 2 weeks 100%
View more
Pushkar Raj Construction Civil Site Engineer Salary
based on 4 salaries
₹3 L/yr - ₹3.8 L/yr
6% less than the average Civil Site Engineer Salary in India
View more details
Compare Pushkar Raj Construction with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare
write
Share an Interview