Filter interviews by
Standard Operating Procedures (SOP) are detailed instructions on how to perform a specific task or operation.
SOPs are essential for ensuring consistency, quality, and safety in operations.
They outline step-by-step instructions, safety precautions, and best practices.
SOPs are commonly used in industries such as manufacturing, healthcare, and food service.
Examples of SOPs include procedures for equipment maintenance, eme
Mandatory PPE for site includes hard hats, safety glasses, gloves, and steel-toed boots.
Hard hats are required to protect against head injuries from falling objects.
Safety glasses are necessary to prevent eye injuries from debris or chemicals.
Gloves should be worn to protect hands from cuts, burns, or chemical exposure.
Steel-toed boots are essential for foot protection in case of heavy objects falling.
Hira, JSA, SOP, JHA are all safety procedures used in the workplace to identify and mitigate hazards.
HIRA stands for Hazard Identification and Risk Assessment, used to identify potential hazards and assess the associated risks.
JSA stands for Job Safety Analysis, a process of identifying potential hazards in a specific job task and determining the best way to perform the task safely.
SOP stands for Standard Operating Pro...
Safety role at site involves ensuring compliance with safety regulations, conducting risk assessments, implementing safety programs, and training employees.
Ensuring compliance with safety regulations and standards
Conducting regular risk assessments to identify potential hazards
Implementing safety programs and initiatives to prevent accidents and injuries
Training employees on safety procedures and protocols
Investigating...
posted on 11 Apr 2021
I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.
Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.
Identifying the required personnel for a project
Recruiting and hiring personnel
Training and orienting personnel to the project
Assigning roles and responsibilities to personnel
Managing personnel performance and productivity
Ensuring compliance with labor laws and regulations
Examples include mobilizing a construc...
Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.
Create a detailed project budget and stick to it
Track expenses regularly and adjust budget as needed
Identify and eliminate unnecessary expenses
Negotiate with vendors for better pricing
Implement cost-saving measures without compromising quality
Use project management tools to monitor expenses and progress
Reg...
Handling clients requires effective communication, understanding their needs, and providing timely solutions.
Listen actively to their concerns and requirements
Communicate clearly and professionally
Provide timely updates and solutions
Build a strong relationship based on trust and respect
Be proactive in identifying and addressing potential issues
Ensure customer satisfaction by going above and beyond expectations
Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.
Identify the need for manpower
Plan the recruitment process
Source and screen candidates
Conduct interviews and assessments
Select and hire candidates
Provide training and orientation
Deploy manpower to required locations
I applied via Referral and was interviewed in Dec 2020. There were 4 interview rounds.
Cube compressive achieving percentage time periods
The question is asking about the percentage of time periods in which cube compressive strength is achieved
Cube compressive strength refers to the ability of a cube-shaped material to withstand compression
The answer may involve calculating the percentage of time periods in which the cube meets the required compressive strength
Examples of data points needed: time periods,
I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.
BMD for sway frame is a diagram showing the variation of bending moment along the length of the frame.
BMD for sway frame will have a shape similar to a zigzag pattern due to the presence of sway in the frame.
The bending moment will be maximum at the points where the frame experiences maximum sway.
The BMD can be drawn by analyzing the internal forces and moments acting on the frame.
Drawing piperack elevations involves creating detailed drawings of the structure from different viewpoints.
Start by determining the dimensions and layout of the piperack
Use software like AutoCAD to create accurate and detailed drawings
Include all necessary details such as pipe sizes, supports, and connections
Label all components clearly for easy understanding
Review and revise the drawings as needed for accuracy
I appeared for an interview in Apr 2024.
I shifted to pursue new opportunities for growth and development in my career.
Seeking new challenges and responsibilities
Exploring different industries or technologies
Relocation for personal reasons or family commitments
I applied via Job Portal and was interviewed before Dec 2021. There were 3 interview rounds.
posted on 31 Jan 2024
About site experience
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Minimum gap between two structures for seismic point of view is typically around 1.5 times the height of the taller structure.
Minimum gap is usually 1.5 times the height of the taller structure to reduce seismic interaction.
This gap helps prevent collision or structural damage during an earthquake.
Building codes and regulations may specify minimum gaps for seismic safety.
Example: If one building is 100 feet tall, the m...
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Senior Engineer
153
salaries
| ₹2.7 L/yr - ₹9.5 L/yr |
Assistant Engineer
148
salaries
| ₹3 L/yr - ₹6 L/yr |
Junior Engineer
81
salaries
| ₹1 L/yr - ₹4.5 L/yr |
Assistant Engineer - Civil
50
salaries
| ₹2.6 L/yr - ₹5.6 L/yr |
Senior Civil Engineer
50
salaries
| ₹4 L/yr - ₹8.5 L/yr |
AECOM
L&T Energy Hydrocarbon
Apco Infratech
Saipem