Filter interviews by
I applied via Approached by Company and was interviewed in Aug 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in May 2024. There were 3 interview rounds.
I applied via LinkedIn and was interviewed in Oct 2023. There was 1 interview round.
Yes, FIDIC stands for International Federation of Consulting Engineers and is a set of contract templates commonly used in the construction industry.
FIDIC stands for International Federation of Consulting Engineers
It provides standard contract templates for construction projects
FIDIC contracts are commonly used in the construction industry worldwide
I applied via Naukri.com and was interviewed in Jan 2024. There were 2 interview rounds.
PS Group interview questions for popular designations
I applied via Job Portal and was interviewed before Mar 2023. There were 3 interview rounds.
STP stands for Sewage Treatment Plant, which is used to treat wastewater before releasing it back into the environment.
There are different types of STPs such as activated sludge process, sequencing batch reactor, and membrane bioreactor.
The type of STP used depends on factors like the volume of wastewater to be treated, space availability, and treatment requirements.
For example, an activated sludge process is commonly ...
I applied via Approached by Company and was interviewed in Nov 2021. There were 2 interview rounds.
The minimum slope for drainage pipe should be 1/4 inch per foot.
The slope ensures proper flow of water and prevents clogging.
The slope may vary depending on the type of pipe and the material used.
The slope should be checked during installation and adjusted if necessary.
A slope of 1/8 inch per foot may be acceptable for larger pipes.
The slope should always be towards the main drain or sewer line.
I applied via Referral and was interviewed in Jan 2021. There were 5 interview rounds.
I applied via Company Website and was interviewed before Aug 2020. There were 6 interview rounds.
Top trending discussions
posted on 23 Oct 2021
I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.
posted on 10 Sep 2020
I applied via Company Website and was interviewed in Aug 2020. There were 3 interview rounds.
Connecting to a database has multiple options depending on the type of database and programming language used.
For SQL databases, options include using JDBC for Java, ODBC for C++, and ADO.NET for C#.
For NoSQL databases, options include using MongoDB's driver for Python or Node.js.
ORMs like Hibernate and Entity Framework can also be used to abstract away the database connection details.
Connection strings are used to spe...
The duration of PS Group interview process can vary, but typically it takes about 2-4 weeks to complete.
based on 4 interviews
Interview experience
based on 129 reviews
Rating in categories
Civil Site Engineer
18
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Supervisor
16
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
15
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
10
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Site Engineer
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Group
Reliance Industries
Aditya Birla Group
Mahindra & Mahindra