I applied via Referral and was interviewed before Oct 2023. There was 1 interview round.
Yes, ACB settings refer to the settings of Air Circuit Breakers used in electrical systems.
ACB settings include parameters such as overload protection, short circuit protection, and ground fault protection.
These settings can be adjusted based on the specific requirements of the electrical system.
For example, the trip unit of an ACB can be set to trip at a certain current level to protect the system from overloads.
Power factor is a measure of how effectively electrical power is being used in a system.
Power factor is the ratio of real power (kW) to apparent power (kVA) in an electrical system.
It indicates how efficiently power is being converted into useful work.
A power factor of 1 indicates all power is being used effectively, while a lower power factor means some power is being wasted.
Power factor correction can be used to impr
I will first check the cause of the trip, reset the ACB, and then investigate further if needed.
Check the cause of the trip - look for any overload, short circuit, or earth fault
Reset the ACB by switching it off and then on again
Investigate further if needed - check for any faulty components or wiring
VRF stands for Variable Refrigerant Flow and is a type of HVAC system that uses refrigerant as the cooling and heating medium. AHU stands for Air Handling Unit and is a device used to condition and circulate air as part of an HVAC system.
VRF systems use refrigerant to directly cool or heat the space, while AHUs use chilled or heated water to condition the air before distributing it.
VRF systems are more energy efficient...
I applied via Naukri.com and was interviewed in May 2024. There were 2 interview rounds.
Under and over reinforcement in beams and columns refers to the amount of reinforcement provided in relation to the required strength of the structure.
Under reinforcement occurs when the amount of reinforcement provided is less than what is required for the structure to carry the design loads.
Over reinforcement occurs when the amount of reinforcement provided is more than what is required for the structure, leading to ...
NDT tests of members are done to ensure structural integrity and safety.
NDT tests are non-destructive tests used to evaluate the properties of a material, component, or system without causing damage.
These tests help in detecting defects such as cracks, voids, and discontinuities that may compromise the structural integrity of the members.
By conducting NDT tests, engineers can ensure the safety and reliability of struct...
Prestige Group interview questions for popular designations
Reinforcement quantity for beam, slab, column, and tiles wastage calculations involve determining the amount of materials needed and accounting for potential wastage.
Calculate the required quantity of reinforcement for beams, slabs, columns, and tiles based on structural drawings and specifications.
Consider the standard lengths and sizes of reinforcement bars available in the market to minimize wastage.
Factor in the cu...
Get interview-ready with Top Prestige Group Interview Questions
I applied via Referral and was interviewed in Apr 2024. There were 2 interview rounds.
The market trend of the real estate industry is currently showing a steady increase in demand and prices.
Low interest rates are driving more people to buy homes
Limited inventory is causing prices to rise
Remote work is leading to increased interest in suburban and rural areas
Investors are looking for opportunities in rental properties
Bar Bending Schedule is a document detailing the reinforcement placement in a beam.
Bar Bending Schedule includes details like bar diameter, spacing, length, and shape for each bar in the beam.
It helps in ensuring proper reinforcement placement as per structural design requirements.
Example: Bar Bending Schedule for a beam may specify 10mm diameter bars at 150mm spacing with a total length of 2.5m.
Bar Bending schedule for Column involves detailing the reinforcement requirements for columns in a construction project.
Bar Bending schedule includes details of reinforcement bars, their sizes, shapes, and placement in the column.
It is essential for ensuring the structural integrity and strength of the column.
The schedule is prepared based on structural drawings and design requirements.
Example: A typical bar bending sc...
Types of pumps include centrifugal, positive displacement, and diaphragm pumps. They work by creating flow and pressure to move liquids or gases.
Centrifugal pumps use a rotating impeller to create flow and pressure.
Positive displacement pumps trap and move a fixed amount of fluid with each cycle.
Diaphragm pumps use a flexible diaphragm to create pressure and move fluid.
Pumps can be powered by electricity, engines, or m
Quantity take off involves measuring and calculating the materials needed for construction, while BBS (Bar Bending Schedule) is a detailed list of reinforcement bars required for footings, beams, and columns.
Quantity take off involves measuring the dimensions of footings, beams, and columns and calculating the required materials such as concrete and steel reinforcement.
Preparation of BBS for footings, beams, and column...
Steel measurement can be calculated by multiplying the length, width, and height of the steel piece.
Calculate the length, width, and height of the steel piece in meters or feet
Multiply the length, width, and height together to get the volume of the steel piece
Use the density of steel (usually around 7850 kg/m^3) to calculate the weight of the steel piece by multiplying the volume with the density
Material can be controlled through proper inventory management, regular audits, and strict access control.
Implementing a robust inventory management system to track material movement and levels
Conducting regular audits to ensure accuracy of inventory records
Implementing strict access control measures to prevent unauthorized access to materials
Utilizing technology such as barcode scanning or RFID tags for efficient trac...
The duration of Prestige Group interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 46 interviews
Interview experience
based on 426 reviews
Rating in categories
Assistant Manager
95
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
62
salaries
| ₹0 L/yr - ₹0 L/yr |
Executive Accountant
34
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Executive
32
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Manager
29
salaries
| ₹0 L/yr - ₹0 L/yr |
DLF
Godrej Properties
Sobha
Brigade Group