Filter interviews by
Steel measurement can be calculated by multiplying the length, width, and height of the steel piece.
Calculate the length, width, and height of the steel piece in meters or feet
Multiply the length, width, and height together to get the volume of the steel piece
Use the density of steel (usually around 7850 kg/m^3) to calculate the weight of the steel piece by multiplying the volume with the density
Material can be controlled through proper inventory management, regular audits, and strict access control.
Implementing a robust inventory management system to track material movement and levels
Conducting regular audits to ensure accuracy of inventory records
Implementing strict access control measures to prevent unauthorized access to materials
Utilizing technology such as barcode scanning or RFID tags for efficient trac...
I applied via Approached by Company and was interviewed in Sep 2023. There was 1 interview round.
Top trending discussions
posted on 17 Mar 2024
I applied via Company Website and was interviewed in Mar 2024. There was 1 interview round.
I applied via Referral and was interviewed before Apr 2021. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Jul 2021. There were 2 interview rounds.
Cap rate is a real estate metric used to determine the potential return on investment.
Cap rate stands for capitalization rate.
It is calculated by dividing the net operating income (NOI) by the property's value.
The result is expressed as a percentage and represents the rate of return an investor can expect from the property.
A higher cap rate indicates a higher potential return on investment, but may also indicate higher...
I applied via Referral and was interviewed in Jan 2021. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Dec 2023. There was 1 interview round.
The slab cycle of aluminium shuttering refers to the process of using aluminium formwork for casting slabs in construction projects.
Aluminium shuttering is lightweight and durable, making it ideal for repetitive use in slab construction.
The slab cycle involves setting up the aluminium formwork, pouring concrete, allowing it to cure, and then dismantling the formwork for reuse.
Aluminium shuttering can be easily assemble...
I applied via Naukri.com and was interviewed in Oct 2024. There were 2 interview rounds.
based on 2 interviews
Interview experience
based on 1 review
Rating in categories
Assistant Manager
81
salaries
| ₹4.6 L/yr - ₹14.6 L/yr |
Deputy Manager
65
salaries
| ₹5.7 L/yr - ₹15 L/yr |
Executive Accountant
35
salaries
| ₹2.2 L/yr - ₹5.4 L/yr |
Senior Executive
32
salaries
| ₹3.4 L/yr - ₹8.5 L/yr |
Project Manager
31
salaries
| ₹6.7 L/yr - ₹21.5 L/yr |
Sobha
Lodha Group
Cushman & Wakefield
Godrej Properties