I applied via Walk-in and was interviewed in Jun 2022. There were 3 interview rounds.
Shift calculation of month and OEE formula
Shift calculation involves determining the number of shifts in a month
OEE formula is used to calculate Overall Equipment Effectiveness
OEE = Availability x Performance x Quality
Availability = Operating Time / Planned Production Time
Performance = Actual Production Rate / Ideal Production Rate
Quality = Good Units Produced / Total Units Produced
Overall experience,
Performance,
Attitude,
Professional,
Bio data,
Skill level
Top trending discussions
posted on 6 Mar 2024
I applied via Referral and was interviewed before Mar 2023. There were 2 interview rounds.
How will be your contingency planning and MOQ planning
posted on 8 Apr 2022
I applied via Walk-in and was interviewed in Apr 2022. There were 2 interview rounds.
Engineer
98
salaries
| ₹2.9 L/yr - ₹5.8 L/yr |
Production Engineer
69
salaries
| ₹2.1 L/yr - ₹5.4 L/yr |
Assistant Manager
65
salaries
| ₹5.8 L/yr - ₹11 L/yr |
Assistant Engineer
63
salaries
| ₹2 L/yr - ₹3.5 L/yr |
Senior Engineer
56
salaries
| ₹3.5 L/yr - ₹8 L/yr |
Samvardhana Motherson Group
Bharat Forge
TVS Sundram Fasteners
Rane Holdings