There are several types of moulds used in injection moulding, including two-plate, three-plate, hot runner, and cold runner moulds.
Two-plate moulds have a stationary half and a moving half that opens and closes to release the part.
Three-plate moulds have an additional plate that separates the runner and gate from the part.
Hot runner moulds use a heated manifold to keep the plastic molten as it flows into the mould cavi...
Vernier caliper is a measuring tool used to measure the dimensions of an object with high accuracy.
Clean the jaws and ensure they are parallel
Close the jaws and check if the zero on the vernier scale aligns with the zero on the main scale
Open the jaws and place the object between them
Read the main scale value closest to the object's edge
Read the vernier scale value that aligns with the main scale value
Add the main scal...
I applied via campus placement at Sathyabama University
Top trending discussions
Production planning is the process of determining the resources needed to achieve production goals and scheduling their use.
Analyzing demand forecasts to determine production requirements
Identifying available resources such as raw materials, equipment, and labor
Creating a production schedule to optimize resource utilization
Monitoring production progress and adjusting plans as needed
Ensuring timely delivery of finished
I have extensive experience in handling manpower in various production environments.
Managed a team of 20 production workers in a manufacturing plant
Developed and implemented training programs for new hires to improve efficiency
Scheduled shifts and assignments to ensure optimal productivity
Addressed employee concerns and conflicts to maintain a positive work environment
I applied via LinkedIn and was interviewed in Nov 2024. There were 2 interview rounds.
I implemented new production processes and technologies to improve efficiency and quality.
Introduced automated systems to streamline production processes
Implemented lean manufacturing principles to reduce waste and improve productivity
Led training sessions for employees to ensure smooth transition to new processes
Collaborated with cross-functional teams to identify areas for improvement
I was interviewed in Dec 2024.
posted on 28 Dec 2024
I applied via Walk-in and was interviewed in Jun 2024. There was 1 interview round.
OEE stands for Overall Equipment Effectiveness and is a measure of how well a manufacturing process is performing.
OEE is calculated by multiplying Availability, Performance, and Quality.
Availability is the ratio of operating time to planned production time.
Performance is the ratio of actual production to maximum possible production.
Quality is the ratio of good parts to total parts produced.
OEE = Availability x Performa...
G code and M code are machine codes used in CNC programming to control the movements and functions of a machine tool.
G code is used to control the movements of the machine, such as linear or circular interpolation.
M code is used to control auxiliary functions of the machine, such as turning on or off coolant or spindle rotation.
G codes are typically used for positioning and feed rate control, while M codes are used for...
I have used software to create programs.
I have used software like AutoCAD, SolidWorks, and MATLAB to create programs for production engineering.
Using software allows for more precise and efficient programming compared to manual methods.
Software also helps in simulating and testing programs before implementation.
posted on 3 Feb 2025
Online test conducted for 1 hour atlest
I applied via Approached by Company and was interviewed in Sep 2023. There was 1 interview round.
based on 13 reviews
Rating in categories
Engineer
92
salaries
| ₹2.9 L/yr - ₹5.8 L/yr |
Assistant Manager
64
salaries
| ₹5.8 L/yr - ₹11 L/yr |
Assistant Engineer
64
salaries
| ₹2 L/yr - ₹3.6 L/yr |
Production Engineer
60
salaries
| ₹2.3 L/yr - ₹6 L/yr |
Senior Engineer
57
salaries
| ₹3.5 L/yr - ₹8 L/yr |
Samvardhana Motherson Group
Bharat Forge
TVS Sundram Fasteners
Rane Holdings