Filter interviews by
I applied via Safları Result
I applied via LinkedIn and was interviewed in Aug 2024. There was 1 interview round.
I am a motivated finance student with strong analytical skills and a passion for learning.
Currently pursuing a degree in Finance at XYZ University
Completed internships at ABC Company and gained experience in financial analysis
Proficient in Excel, financial modeling, and data analysis
Strong communication and teamwork skills demonstrated through group projects and extracurricular activities
I want to join PowerGrid because of its reputation for innovation and commitment to sustainable energy solutions.
I am passionate about renewable energy and PowerGrid's focus on sustainable solutions aligns with my values.
I am impressed by PowerGrid's track record of innovation in the energy sector, and I am eager to contribute to their cutting-edge projects.
I believe that PowerGrid offers a dynamic and challenging work...
Grade of concrete refers to the strength of the concrete mix design.
Grade of concrete is denoted by the ratio of cement, sand, and aggregates in the mix.
Common grades of concrete include M10, M15, M20, M25, etc.
Higher grade of concrete indicates higher strength and durability.
For example, M20 grade concrete has a mix ratio of 1:1.5:3 (cement:sand:aggregate).
Power Grid Corporation of India interview questions for popular designations
30 question 30 min are given for the apptitude test test was medioker.
CBT at designated venue as fixed by PGCIL and will be mentioned in the admit card.
Various types of conductors include copper, aluminum, and steel.
Copper: highly conductive, commonly used in electrical wiring
Aluminum: lighter and cheaper than copper, used in power lines
Steel: used in overhead transmission lines for strength and durability
I applied via Company Website and was interviewed in Aug 2023. There was 1 interview round.
I applied via Walk-in and was interviewed in Feb 2023. There were 2 interview rounds.
I appeared for an interview before Oct 2023.
The Indian government typically requires around 1-2 acres of land for setting up a 400kv power transmission line.
The land requirement for a 400kv power transmission line can vary depending on factors such as terrain, population density, and environmental regulations.
In general, the Indian government may require anywhere from 1 to 2 acres of land for a 400kv transmission line.
The exact land requirement will be determine...
Top trending discussions
The duration of Power Grid Corporation of India interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 11 interviews
Interview experience
based on 908 reviews
Rating in categories
Field Engineer
216
salaries
| ₹3.6 L/yr - ₹10 L/yr |
Field Supervisor
84
salaries
| ₹4.1 L/yr - ₹6.5 L/yr |
Electrical Engineer
63
salaries
| ₹1.7 L/yr - ₹9.1 L/yr |
Associate Engineer
61
salaries
| ₹2.4 L/yr - ₹4.6 L/yr |
Graduate Apprentice Trainee
60
salaries
| ₹1 L/yr - ₹2.8 L/yr |
Suzlon Group
Adani Group
NTPC
Torrent Power