Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Polycab Wires Team. If you also belong to the team, you can get access from here

Polycab Wires Verified Tick

Compare button icon Compare button icon Compare
4.1

based on 1.3k Reviews

Filter interviews by

Polycab Wires Assistant Product Design and Development Manager Interview Questions and Answers

Updated 19 Nov 2022

Polycab Wires Assistant Product Design and Development Manager Interview Experiences

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Basic personal interview
  • Q2. Self introduction
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via campus placement at University of Petroleum and Energy Studies (UPES), Dehradun and was interviewed in Aug 2023. There were 3 interview rounds.

Round 1 - Aptitude Test 

It was nearly 3 test for 3 hrs.

Round 2 - Group Discussion 

My topic was ott vs theatre.

Round 3 - Technical 

(5 Questions)

  • Q1. Read about the company on LinkedIn and revise all your core subjects.
  • Q2. Different types of cables produced by kei industries?
  • Ans. 

    KEI Industries produces a variety of cables including power cables, control cables, instrumentation cables, and specialty cables.

    • Power cables

    • Control cables

    • Instrumentation cables

    • Specialty cables

  • Answered by AI
  • Q3. What are high voltage cables?
  • Ans. 

    High voltage cables are cables designed to carry high levels of electrical energy safely.

    • High voltage cables are insulated to prevent electrical leakage and ensure safety.

    • They are used to transmit electricity over long distances with minimal power loss.

    • Examples include power lines used for transmitting electricity from power plants to homes and businesses.

  • Answered by AI
  • Q4. What is ohm meter?
  • Ans. 

    An ohm meter is a device used to measure electrical resistance in a circuit.

    • Measures the resistance of a circuit in ohms

    • Helps in troubleshooting electrical issues

    • Can be used to test the continuity of a circuit

    • Commonly used in electronics and electrical engineering

  • Answered by AI
  • Q5. Maximum Voltage of cables produced by kei industries?
  • Ans. 

    The maximum voltage of cables produced by KEI Industries is 1100V.

    • KEI Industries produces cables with a maximum voltage of 1100V.

    • The cables are designed to handle high voltage applications.

    • These cables are commonly used in industrial and commercial settings.

    • KEI Industries ensures quality and safety standards in their cable production.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Sep 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Education related Questions Asked

Round 3 - One-on-one 

(4 Questions)

  • Q1. How many types of gates? ,And its truth tables
  • Ans. 

    There are seven basic types of logic gates: AND, OR, NOT, NAND, NOR, XOR, and XNOR.

    • AND gate: output is high only if all inputs are high

    • OR gate: output is high if any input is high

    • NOT gate: output is the inverse of the input

    • NAND gate: output is low only if all inputs are high

    • NOR gate: output is low if any input is high

    • XOR gate: output is high if inputs are different

    • XNOR gate: output is high if inputs are the same

  • Answered by AI
  • Q2. Electronic and Electrical related types questions
  • Q3. About to himself?
  • Q4. Questions paper

Interview Preparation Tips

Interview preparation tips for other job seekers - Very hard interview
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(1 Question)

  • Q1. Material treatment before powder coating
  • Ans. 

    Material treatment before powder coating involves cleaning, degreasing, and surface preparation to ensure adhesion and durability.

    • Cleaning the surface to remove any dirt, oil, or contaminants

    • Degreasing to eliminate any oils or grease that could interfere with adhesion

    • Surface preparation such as sanding or blasting to create a rough surface for better adhesion

    • Applying a conversion coating to improve corrosion resistance

    • ...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Tell me about yourself
Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Your expereince
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Aptitude Test 
Round 3 - Technical 

(4 Questions)

  • Q1. Production and shop floor management
  • Q2. Sap pp module and semi goods (sfg) and fined goods fg moments and work orders create to refress of master BOM
  • Q3. Ask to production relenting in sap pp module
  • Q4. Fg and sfg goods moments one location to another location
  • Ans. 

    Moving FG and SFG goods from one location to another

    • FG and SFG goods refer to Finished Goods and Semi-Finished Goods respectively

    • Transportation of goods can be done through various modes like road, rail, air or sea

    • Proper packaging and labeling of goods is necessary to ensure safe transportation

    • Logistics companies can be hired to handle the transportation process

    • Tracking and monitoring of goods during transit is importa

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Sap pp module material posting another location
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Feb 2023. There were 2 interview rounds.

Round 1 - One-on-one 

(4 Questions)

  • Q1. Production process
  • Ans. Planning team order post to store office, store team order issued then handover material production
  • Answered Anonymously
  • Q2. Store process so
  • Ans. Purchase to wender for any material received to gate team gate team information to store team
  • Answered Anonymously
  • Q3. Second process by Store
  • Q4. Gate entry chek & Invoice check GRN process Qc department material check Qc okay so system clear Store team received to location
Round 2 - Group Discussion 

Store & production Process

Interview Preparation Tips

Interview preparation tips for other job seekers - Sellery

I applied via Recruitment Consulltant and was interviewed in May 2022. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Your current living details current work salary current ctc and expected ctc
Round 2 - Aptitude Test 

Basic questions related to your previous work and basic electronics.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be loyal think positive and do not tell lie. Answer the all questions confidently.

I applied via Campus Placement and was interviewed in Dec 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What is FSH and where is this used
  • Ans. In cable for fire resistance.
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Good go ahead nice company with all ethics.

Tell us how to improve this page.

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 425 Interviews
Havells Interview Questions
4.0
 • 200 Interviews
Bajaj Electricals Interview Questions
4.0
 • 118 Interviews
KEI Industries Interview Questions
4.2
 • 52 Interviews
C&S Electric Interview Questions
4.1
 • 44 Interviews
View all

Polycab Wires Assistant Product Design and Development Manager Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

4.0

Skill development

4.0

Work-Life balance

3.0

Salary & Benefits

3.0

Job Security

4.0

Company culture

4.0

Promotions/Appraisal

4.0

Work Satisfaction

Explore 1 Review and Rating
Assistant Manager
338 salaries
unlock blur

₹2.2 L/yr - ₹10.4 L/yr

Deputy Manager
334 salaries
unlock blur

₹3.5 L/yr - ₹14 L/yr

Manager
181 salaries
unlock blur

₹5.4 L/yr - ₹17.3 L/yr

Sales Executive
170 salaries
unlock blur

₹2.2 L/yr - ₹5.2 L/yr

Executive Engineer
168 salaries
unlock blur

₹3.1 L/yr - ₹6.6 L/yr

Explore more salaries
Compare Polycab Wires with

Finolex Cables

3.8
Compare

KEI Industries

4.2
Compare

Havells

4.0
Compare

Bajaj Electricals

4.0
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview