Change of Scope in a road project refers to any modifications or alterations made to the original project plan.
Change of scope can include changes in project objectives, deliverables, timelines, or budget.
It may involve adding or removing features, adjusting the project scope, or redefining project requirements.
For example, if a road project initially planned to construct a two-lane road but later decides to expan...
Preparing a R0 budget for a road project involves several steps and considerations.
Identify the scope and objectives of the road project
Estimate the quantities of materials and resources required
Determine the unit costs of materials, labor, and equipment
Calculate the total cost for each item and activity
Consider any contingencies or unforeseen expenses
Sum up the costs to create the overall budget
Review and refine ...
The S-Curve is a graphical representation of the growth or progress of a project or business over time.
The S-Curve is named after its shape, which resembles the letter 'S'.
It is commonly used in project management to track and visualize the progress of tasks or activities.
The curve typically shows slow progress at the beginning, followed by a rapid growth phase, and then a tapering off towards the end.
The S-Curve ...
Preliminary drawing, as-built drawing, drawing schedule, and proof checking are all important aspects of the design and construction process.
Preliminary drawing: Initial sketches or plans that outline the basic design concept.
As-built drawing: Final drawings that reflect any changes made during construction.
Drawing schedule: A timeline or list that outlines when each drawing is expected to be completed.
Proof check...
Shuttering material refers to temporary structures used in construction projects to support concrete during the curing process.
Shuttering material is required to provide formwork support for concrete structures.
It helps in creating the desired shape and structure of the concrete element.
Common types of shuttering materials include plywood, steel, aluminum, and plastic.
The choice of material depends on factors like...
The sources and quantity of materials in projects are determined based on the tender requirements.
The sources of materials in projects are determined through a procurement process.
The quantity of materials required is specified in the tender documents.
The tender documents may include a bill of quantities or a detailed scope of work.
The procurement team evaluates potential suppliers and selects the most suitable on...
Yes
Yes, I am able to formulate claim raising and defending strategies based on contractual provisions.
I have extensive experience in contract management and have successfully raised and defended claims in my previous roles.
I am well-versed in analyzing contractual provisions and identifying the relevant clauses for formulating effective strategies.
I have a strong understanding of contract law and can leverage it t...
Experienced in various automated systems and software for project management and engineering applications.
Proficient in MS Project for scheduling and resource management, ensuring timely project delivery.
Utilized Primavera for complex project planning, tracking progress, and managing multiple projects simultaneously.
Experienced with SAP for enterprise resource planning, streamlining operations and improving data a...
Price adjustment is a mechanism to account for changes in project costs. It helps in maintaining project profitability.
Price adjustment is a provision in a contract that allows for changes in project costs due to various factors such as inflation, currency fluctuations, or changes in material prices.
Its role in project cost is to ensure that the project remains financially viable and profitable despite cost fluctu...
Rate analysis of earthwork for road project involves calculating the cost of excavation, transportation, and compaction of soil.
Rate analysis helps in estimating the cost of earthwork for road construction.
It involves determining the quantity of earthwork required and the rates for excavation, transportation, and compaction.
The rates are based on factors like the type of soil, distance of transportation, and equip...
Shuttering material refers to temporary structures used in construction projects to support concrete during the curing process.
Shuttering material is required to provide formwork support for concrete structures.
It helps in creating the desired shape and structure of the concrete element.
Common types of shuttering materials include plywood, steel, aluminum, and plastic.
The choice of material depends on factors like proj...
Yes
Yes, I am able to formulate claim raising and defending strategies based on contractual provisions.
I have extensive experience in contract management and have successfully raised and defended claims in my previous roles.
I am well-versed in analyzing contractual provisions and identifying the relevant clauses for formulating effective strategies.
I have a strong understanding of contract law and can leverage it to dev...
Preliminary drawing, as-built drawing, drawing schedule, and proof checking are all important aspects of the design and construction process.
Preliminary drawing: Initial sketches or plans that outline the basic design concept.
As-built drawing: Final drawings that reflect any changes made during construction.
Drawing schedule: A timeline or list that outlines when each drawing is expected to be completed.
Proof checking: ...
The sources and quantity of materials in projects are determined based on the tender requirements.
The sources of materials in projects are determined through a procurement process.
The quantity of materials required is specified in the tender documents.
The tender documents may include a bill of quantities or a detailed scope of work.
The procurement team evaluates potential suppliers and selects the most suitable ones.
Th...
Experienced in various automated systems and software for project management and engineering applications.
Proficient in MS Project for scheduling and resource management, ensuring timely project delivery.
Utilized Primavera for complex project planning, tracking progress, and managing multiple projects simultaneously.
Experienced with SAP for enterprise resource planning, streamlining operations and improving data accura...
Rate analysis of earthwork for road project involves calculating the cost of excavation, transportation, and compaction of soil.
Rate analysis helps in estimating the cost of earthwork for road construction.
It involves determining the quantity of earthwork required and the rates for excavation, transportation, and compaction.
The rates are based on factors like the type of soil, distance of transportation, and equipment ...
The S-Curve is a graphical representation of the growth or progress of a project or business over time.
The S-Curve is named after its shape, which resembles the letter 'S'.
It is commonly used in project management to track and visualize the progress of tasks or activities.
The curve typically shows slow progress at the beginning, followed by a rapid growth phase, and then a tapering off towards the end.
The S-Curve helps...
Preparing a R0 budget for a road project involves several steps and considerations.
Identify the scope and objectives of the road project
Estimate the quantities of materials and resources required
Determine the unit costs of materials, labor, and equipment
Calculate the total cost for each item and activity
Consider any contingencies or unforeseen expenses
Sum up the costs to create the overall budget
Review and refine the b...
Change of Scope in a road project refers to any modifications or alterations made to the original project plan.
Change of scope can include changes in project objectives, deliverables, timelines, or budget.
It may involve adding or removing features, adjusting the project scope, or redefining project requirements.
For example, if a road project initially planned to construct a two-lane road but later decides to expand it ...
Price adjustment is a mechanism to account for changes in project costs. It helps in maintaining project profitability.
Price adjustment is a provision in a contract that allows for changes in project costs due to various factors such as inflation, currency fluctuations, or changes in material prices.
Its role in project cost is to ensure that the project remains financially viable and profitable despite cost fluctuation...
Top trending discussions
I applied via Company Website and was interviewed in Feb 2020. There was 1 interview round.
I appeared for an interview before May 2020.
To fix the rate of 1 cum metre RCC for M10 and M20, factors like material cost, labor cost, equipment cost, and overheads need to be considered.
Determine the cost of materials required for 1 cum metre RCC for M10 and M20
Calculate the labor cost involved in the construction process
Consider the cost of equipment required for the construction process
Include overheads like transportation, insurance, and taxes
Compare the ra...
I applied via Naukri.com and was interviewed before Sep 2020. There were 4 interview rounds.
When faced with a shortage of material received, we take immediate action to address the issue and minimize any negative impact.
Contact the supplier to inform them about the shortage and request immediate resolution
Check inventory records and cross-verify with the supplier's delivery documentation
Investigate the cause of the shortage, such as shipping errors or miscommunication
Implement measures to prevent future short...
Various SAP T codes for Issues
MB21 - Create Reservation
MB1A - Goods Withdrawal
MB1B - Transfer Posting
MB1C - Other Goods Receipts
MB1E - Create Stock Transport Order
MB1F - Goods Issue
MB1H - Maintain Reservation
MB1T - Transfer Posting
MB1A - Goods Withdrawal
MB1B - Transfer Posting
MB1C - Other Goods Receipts
MB1E - Create Stock Transport Order
MB1F - Goods Issue
MB1H - Maintain Reservation
I applied via Approached by Company and was interviewed before Apr 2021. There were 2 interview rounds.
I applied via Company Website and was interviewed in Dec 2020. There were 3 interview rounds.
posted on 24 Mar 2020
I applied via Naukri.com and was interviewed in Feb 2020. There were 3 interview rounds.
I have 5 years of experience in the Oil & Gas sector, specifically in the Operations department.
I have worked in the Operations department of an oil and gas company for 5 years.
During my time in the sector, I have gained extensive knowledge of the operational processes and procedures involved in oil and gas production.
I have successfully managed various projects related to drilling, production optimization, and cost re...
I have over five years of experience in planning, focusing on project management and resource allocation.
Led a team in developing a strategic plan that improved project delivery timelines by 20%.
Implemented a new scheduling system that reduced resource conflicts and increased efficiency.
Collaborated with cross-functional teams to align project goals with organizational objectives.
Conducted regular reviews and adjustmen...
Preparation of RA bill involves gathering all relevant information and creating a detailed invoice for goods or services provided.
Gather all necessary information such as product or service details, quantity, and pricing
Create a detailed invoice with clear descriptions and itemized costs
Include any applicable taxes or discounts
Ensure accuracy and completeness of the bill before submitting to the client
Follow up with th...
posted on 22 Jun 2021
I applied via Campus Placement and was interviewed in May 2021. There were 3 interview rounds.
posted on 14 Nov 2021
I applied via Campus Placement and was interviewed in May 2021. There was 1 interview round.
posted on 12 Jan 2023
I applied via Walk-in and was interviewed before Jan 2022. There were 2 interview rounds.
Some of the top questions asked at the PNC Infratech Senior Manager interview -
based on 3 reviews
Rating in categories
Assistant Engineer
174
salaries
| ₹2 L/yr - ₹6 L/yr |
Junior Engineer
121
salaries
| ₹1.8 L/yr - ₹4.2 L/yr |
Assistant Manager
92
salaries
| ₹4.8 L/yr - ₹12 L/yr |
Senior Engineer
56
salaries
| ₹4.2 L/yr - ₹8.5 L/yr |
Accounts Officer
53
salaries
| ₹3.2 L/yr - ₹7.5 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Kalpataru Projects International