Upload Button Icon Add office photos

Filter interviews by

PIVOT Engineering & General Contracting Company Interview Questions and Answers

Updated 29 Aug 2022

PIVOT Engineering & General Contracting Company Interview Experiences

Popular Designations

2 interviews found

Duct Man Interview Questions & Answers

user image Anonymous

posted on 29 Aug 2022

I applied via Walk-in and was interviewed before Aug 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Duct man Jobs any questions will answered that.i am must answer duct?

Interview Preparation Tips

Topics to prepare for PIVOT Engineering & General Contracting Company Duct Man interview:
  • Production Planning
  • poroduct
Interview preparation tips for other job seekers - 8 hours duty with mind full jobs.
sallery gave under 5th of month.
over time will do 2 hours .
good working possible it's fact.

I applied via Naukri.com and was interviewed before Jan 2018. There were 4 interview rounds.

Interview Preparation Tips

General Tips: Electrician charghent
Skills: Communication, Body Language, Problem Solving, Analytical Skills, Presentation Skills
Duration: 1-4 weeks

Electrician.I.T.I Interview Questions asked at other Companies

Q1. Types of current. (Ans-2 types of current , Alternative and direct. AC generally use in everywhere like domestic, industrial and manymore.this current flows in frequently. Indian frequency is 50 Htz. Direct current uses for equipments and e... read more
View answer (1)

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
-
Result
Not Selected
Round 1 - One-on-one 

(2 Questions)

  • Q1. Type of work Permit.
  • Ans. 

    Work permits are documents that authorize specific work to be done in a controlled manner to ensure safety.

    • Work permits are used to control hazardous work activities.

    • They outline the precautions to be taken before, during, and after the work.

    • Examples include hot work permits, confined space entry permits, and electrical work permits.

  • Answered by AI
  • Q2. Safe hours of Manpower furmula.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
No response
Round 1 - One-on-one 

(3 Questions)

  • Q1. Raman Deep Singh
  • Q2. Online interview
  • Q3. Yes online interview morning
Round 2 - One-on-one 

(2 Questions)

  • Q1. Raman Deep Singh hbk veery nice copny hbk
  • Q2. Hbk interview verry nice copny hbk
Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before May 2018. There were 2 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. What is Your Current Sallary.
  • Ans. 

    I am currently earning $60,000 per year.

    • My current salary is $60,000 per year.

    • I am satisfied with my current salary.

    • I believe my salary reflects my experience and qualifications.

  • Answered by AI
  • Q2. Expected salary
  • Q3. Negotiable sallary how much you negotiate.
  • Q4. Yourself Introduction.
  • Q5. About Your projects, experience and some technical question . I.e. procedure of work , productivity of workman and how to start your activities etc.

Interview Preparation Tips

You should be confident don't be nervous and Give your best.

Fever Clinic Operator Interview Questions & Answers

RPG Group user image Prajakta Nikhar

posted on 26 Dec 2023

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Nov 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(5 Questions)

  • Q1. Online interview
  • Q2. No, no, no, no, no, no, no
  • Q3. No..............
  • Q4. No.......... ..
  • Q5. No............ ....... .

Interview Preparation Tips

Interview preparation tips for other job seekers - Fever clinic exchange Oder dijiye ye
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Electrical tray work related cable laying glanding and termination JB install and dB installation with glanding and termination

Interview Preparation Tips

Interview preparation tips for other job seekers - I have good experience Electrical filed with the team.i have a loat of knowledge in electrical power systems, panels, switchgear installation continuity testing breaker test and follow up to Drowning as per client requirements.etc

I applied via Approached by Company and was interviewed in Mar 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Tendering clause are mostly used for Client Billing
  • Q2. Cost control, Budgeting
Round 3 - One-on-one 

(2 Questions)

  • Q1. What is rate analysis
  • Ans. 

    Rate analysis is the process of determining the rates of various items of work involved in a construction project.

    • It involves analyzing the cost of materials, labor, and equipment required for a particular task

    • It helps in estimating the total cost of a project

    • It is used to prepare a detailed bill of quantities for a project

    • It is important for accurate budgeting and cost control

    • Example: Rate analysis for the constructio...

  • Answered by AI
  • Q2. What is document required for estimation
  • Ans. 

    Documents required for estimation include drawings, specifications, bills of quantities, and site survey reports.

    • Drawings: architectural, structural, mechanical, electrical, plumbing, etc.

    • Specifications: detailed descriptions of materials, finishes, and workmanship

    • Bills of quantities: detailed list of all materials and quantities required for the project

    • Site survey reports: information about site conditions, soil type,

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Arabian Construction Company Billing Quantity Surveyor and Engineer interview:
  • Tender clause
  • IS code
Interview preparation tips for other job seekers - IS & CPWD and tender clause is most important for billing engineer

I applied via Referral

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. What are your salary expectations?
  • Q2. Share details of your previous job.
  • Q3. Tell me about yourself.
Round 3 - Accounts & finance head 

(2 Questions)

  • Q1. Accouting related questions
  • Q2. What I know I can explain

Interview Preparation Tips

Interview preparation tips for other job seekers - No woorry enjoined work.good Team and great support to us
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

Interview Questionnaire 

2 Questions

  • Q1. Type of pile , why we provide pile,pile dia , lvup vup svup type questions
  • Ans. 

    Piles are used in construction to transfer loads from a structure to a stronger layer of soil or rock below the surface.

    • Types of piles include driven piles, bored piles, and screw piles.

    • Piles are provided to support structures on weak or compressible soil, to resist uplift forces, or to provide lateral support.

    • The diameter of a pile is determined based on the load it needs to support and the soil conditions.

    • LVUP (Large...

  • Answered by AI
  • Q2. Mostly we use two types of pile (1) friction pile (2)end bearing pile

Interview Preparation Tips

Interview preparation tips for other job seekers - Please read MORTH AN

PIVOT Engineering & General Contracting Company Interview FAQs

How many rounds are there in PIVOT Engineering & General Contracting Company interview?
PIVOT Engineering & General Contracting Company interview process usually has 2 rounds. The most common rounds in the PIVOT Engineering & General Contracting Company interview process are Resume Shortlist and Technical.

Tell us how to improve this page.

PIVOT Engineering & General Contracting Company Interview Process

based on 2 interviews

Interview experience

5
  
Excellent
View more

PIVOT Engineering & General Contracting Company Reviews and Ratings

based on 24 reviews

3.9/5

Rating in categories

4.1

Skill development

3.5

Work-life balance

3.3

Salary

4.7

Job security

3.8

Company culture

3.2

Promotions

3.5

Work satisfaction

Explore 24 Reviews and Ratings
Electrician
4 salaries
unlock blur

₹3.5 L/yr - ₹5.5 L/yr

Electrical Project Engineer
4 salaries
unlock blur

₹12 L/yr - ₹21.4 L/yr

Civil Quality Engineer
3 salaries
unlock blur

₹14.5 L/yr - ₹14.5 L/yr

Explore more salaries
Compare PIVOT Engineering & General Contracting Company with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

GAMMON INDIA

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview