Upload Button Icon Add office photos

Filter interviews by

PIVOT Engineering & General Contracting Company Duct Man Interview Questions and Answers

Updated 29 Aug 2022

PIVOT Engineering & General Contracting Company Duct Man Interview Experiences

1 interview found

Duct Man Interview Questions & Answers

user image Anonymous

posted on 29 Aug 2022

I applied via Walk-in and was interviewed before Aug 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Duct man Jobs any questions will answered that.i am must answer duct?

Interview Preparation Tips

Topics to prepare for PIVOT Engineering & General Contracting Company Duct Man interview:
  • Production Planning
  • poroduct
Interview preparation tips for other job seekers - 8 hours duty with mind full jobs.
sallery gave under 5th of month.
over time will do 2 hours .
good working possible it's fact.

Interview questions from similar companies

I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Be clear on salary negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Say confidently what ever it is..

I applied via Company Website and was interviewed in Aug 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Nodejs basics,AWS S3,script file run command,how to catch db timeout
  • Q2. Connect db options,
  • Ans. 

    Connecting to a database has multiple options depending on the type of database and programming language used.

    • For SQL databases, options include using JDBC for Java, ODBC for C++, and ADO.NET for C#.

    • For NoSQL databases, options include using MongoDB's driver for Python or Node.js.

    • ORMs like Hibernate and Entity Framework can also be used to abstract away the database connection details.

    • Connection strings are used to spe...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Db connection attributes need to prepare well

I applied via Naukri.com and was interviewed before Mar 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Based on your previous jobs

Interview Preparation Tips

Interview preparation tips for other job seekers - It's totally your luck in interview

Interview Questionnaire 

1 Question

  • Q1. If your Experience person , mostly they ask your past experience work related question , If Fresher they ask theoretical question

I applied via Approached by Company and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Piping code and welder qualifications test
  • Ans. 

    Piping code and welder qualifications test

    • Piping code refers to the set of standards and regulations that govern the design, fabrication, and inspection of piping systems.

    • Welder qualifications test is a process of testing and certifying welders to ensure that they have the necessary skills and knowledge to perform welding tasks safely and effectively.

    • Both piping code and welder qualifications test are important in ensu...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. What is your current ctc

Interview Preparation Tips

Interview preparation tips for other job seekers - Just specific to your answer.
WQT/wps required in detail

I applied via Campus Placement and was interviewed before Feb 2021. There were 2 interview rounds.

Round 1 - Aptitude Test 

Quant, verbal, lrdi

Round 2 - Technical 

(2 Questions)

  • Q1. Machine Design concepts
  • Q2. Thermodynamics and RAC Concepts

Interview Preparation Tips

Interview preparation tips for other job seekers - Crisp and to the point answers

I applied via Naukri.com and was interviewed in Apr 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Interviewer asked me about last activity process , material quality, more technical questions, and cost analysis of last projects.

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical one but was majority a stress test.it lasted about 1hr 45 minutes.i tried to answer every question with example.

I applied via Referral and was interviewed before Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Basics of fabrication and Erection methods
  • Q2. Regarding Safety
  • Q3. Resources management
  • Q4. Project planning

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Cool and prepared for all technical

I applied via Approached by Company and was interviewed before Mar 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. It asks your old experience based questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview Basicaly depends on your Luck. What he asked, if you answere, then you are selected, and not answering then you are rejected.

PIVOT Engineering & General Contracting Company Interview FAQs

How many rounds are there in PIVOT Engineering & General Contracting Company Duct Man interview?
PIVOT Engineering & General Contracting Company interview process usually has 2 rounds. The most common rounds in the PIVOT Engineering & General Contracting Company interview process are Resume Shortlist and Technical.

Tell us how to improve this page.

Compare PIVOT Engineering & General Contracting Company with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview