I applied via Company Website and was interviewed in Mar 2023. There were 2 interview rounds.
I applied via Job Fair
Petrofac interview questions for popular designations
I applied via Naukri.com and was interviewed in Mar 2023. There were 3 interview rounds.
I&C concepts refer to instrumentation and control systems used in various industries to monitor and control processes.
I&C systems involve sensors, transmitters, controllers, and final control elements.
They are used to measure variables such as temperature, pressure, flow, and level.
Control systems use feedback loops to adjust process variables and maintain desired setpoints.
Examples include PLCs, DCS, SCADA systems, an...
Instrumentation is the science and art of measurement and control of process variables within a production or manufacturing setting.
Instrumentation involves the use of sensors, transmitters, controllers, and final control elements to monitor and regulate process variables such as temperature, pressure, flow, and level.
It plays a crucial role in ensuring the efficiency, safety, and quality of industrial processes.
Exampl...
Get interview-ready with Top Petrofac Interview Questions
I applied via LinkedIn and was interviewed in Oct 2022. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Dec 2022. There were 4 interview rounds.
I was interviewed before Dec 2022.
To rule a project effectively, a construction manager must establish clear goals, communicate effectively, manage resources efficiently, and adapt to changes.
Establish clear project goals and objectives
Communicate effectively with team members, stakeholders, and clients
Manage resources efficiently to stay within budget and timeline
Adapt to changes and challenges that may arise during the project
Delegate tasks appropria...
I applied via Company Website and was interviewed in Feb 2022. There were 2 interview rounds.
A drawing is a visual representation of an object or system, while loop checking is a process of verifying the functionality of control loops.
A drawing is a graphical representation of an object, system, or process, often created using computer-aided design (CAD) software.
Drawings provide detailed information about the dimensions, components, and connections of the object or system.
Loop checking is a procedure performe...
Pulling cable requires proper planning, equipment, and safety measures.
Ensure the cable is properly labeled and identified before pulling.
Use appropriate equipment such as cable pullers, lubricants, and pulling grips.
Plan the route and ensure there are no obstacles or sharp bends that could damage the cable.
Ensure proper safety measures are in place, such as wearing personal protective equipment and securing the area.
C...
Top trending discussions
Some of the top questions asked at the Petrofac interview -
The duration of Petrofac interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 28 interviews
Interview experience
based on 882 reviews
Rating in categories
Senior Engineer
65
salaries
| ₹0 L/yr - ₹0 L/yr |
Principal Engineer
61
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Design Engineer
49
salaries
| ₹0 L/yr - ₹0 L/yr |
Instrument Engineer
35
salaries
| ₹0 L/yr - ₹0 L/yr |
Process Engineer
33
salaries
| ₹0 L/yr - ₹0 L/yr |
L&T Energy Hydrocarbon
TechnipFMC
McDermott International
Saipem