Filter interviews by
I applied via Company Website and was interviewed in Feb 2022. There were 2 interview rounds.
A drawing is a visual representation of an object or system, while loop checking is a process of verifying the functionality of control loops.
A drawing is a graphical representation of an object, system, or process, often created using computer-aided design (CAD) software.
Drawings provide detailed information about the dimensions, components, and connections of the object or system.
Loop checking is a procedure performe...
Pulling cable requires proper planning, equipment, and safety measures.
Ensure the cable is properly labeled and identified before pulling.
Use appropriate equipment such as cable pullers, lubricants, and pulling grips.
Plan the route and ensure there are no obstacles or sharp bends that could damage the cable.
Ensure proper safety measures are in place, such as wearing personal protective equipment and securing the area.
C...
Top trending discussions
In case of an emergency, I would remain calm, assess the situation, and take appropriate action to ensure the safety of all individuals involved.
Remain calm and assess the situation quickly
Follow emergency protocols and procedures
Ensure the safety of all individuals involved
Contact emergency services if necessary
Provide first aid or medical assistance if trained to do so
I applied via Recruitment Consulltant and was interviewed before Oct 2022. There were 2 interview rounds.
Piping material details include pipe code which specifies the type, size, and material of the pipe.
Pipe code is a standardized system used to identify the type, size, and material of a pipe.
Examples of pipe codes include ASTM A106 for carbon steel pipes and ASTM A312 for stainless steel pipes.
Understanding pipe codes is essential for selecting the right materials for piping projects.
CS and SS pipe codes refer to the material specifications for carbon steel and stainless steel pipes used in piping systems.
CS pipe code typically refers to ASTM A106 for seamless carbon steel pipes or ASTM A53 for welded carbon steel pipes.
SS pipe code typically refers to ASTM A312 for seamless stainless steel pipes or ASTM A358 for welded stainless steel pipes.
CS pipes are commonly used in industrial applications, wh...
posted on 28 Apr 2022
I applied via Walk-in and was interviewed in Oct 2021. There were 8 interview rounds.
My behaviour, and responsibility
Speech and knowlege
Shereing of the obverse
My prossnal job
Work permit and equipment details with jobsop
To develop quality and production, focus on training, process improvement, and effective communication.
Invest in training programs to enhance the skills of the welding team.
Implement process improvement initiatives to streamline operations and reduce errors.
Establish clear quality standards and regularly monitor and evaluate performance.
Encourage open communication between team members to address issues and share ideas...
Senior Engineer
65
salaries
| ₹7.8 L/yr - ₹30 L/yr |
Principal Engineer
60
salaries
| ₹12 L/yr - ₹36 L/yr |
Senior Design Engineer
47
salaries
| ₹8 L/yr - ₹21.5 L/yr |
Instrument Engineer
35
salaries
| ₹10.3 L/yr - ₹25 L/yr |
Process Engineer
34
salaries
| ₹7 L/yr - ₹22 L/yr |
L&T Energy Hydrocarbon
TechnipFMC
McDermott International
Saipem