Upload Button Icon Add office photos

Filter interviews by

Pete Hammond Power Solutions Interview Questions and Answers

Updated 13 Mar 2024

Pete Hammond Power Solutions Interview Experiences

2 interviews found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - HR 

(6 Questions)

  • Q1. Asked all questions in my experience related
  • Q2. And I hope all going good and well all answers as per my experience and knowledge in Procurement and supply chain
  • Q3. I have work hard and given good performance.
  • Q4. If I have selected best performance in organisation.
  • Q5. I have strong knowledge of transformer Manufacturing company. And all knowledge of transformer B & C class Materials
  • Q6. Every years I have improved new vendor and strong knowledge of negotiations in materials related of material.

Senior Purchase Officer Interview Questions asked at other Companies

Q1. What is the difference between Z series & M series T codes in SAP?
View answer (2)
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Nov 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. HR Department... asked Only my experience in Purchase Department and related on my resume
  • Q2. As a in my 15 years experience in procurement Department
Round 3 - Technical 

(1 Question)

  • Q1. In technical of transformer of Power Transformer, Cast Resine (Dry Type) Transformers, VPI transformers.

Senior Purchase Officer Interview Questions asked at other Companies

Q1. What is the difference between Z series & M series T codes in SAP?
View answer (2)

Interview questions from similar companies

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Knowledge about composite blade manufacturing
  • Q2. Knowledge about cost saving initiatives

Interview Preparation Tips

Interview preparation tips for other job seekers - Soft skills are more important
Focus on safety,quality cost aspects
Round 1 - Technical 

(1 Question)

  • Q1. Power bi, sap, automation, dashboard development
Round 2 - HR 

(1 Question)

  • Q1. Hr questions...general information related to project. Tools and skills etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't go for this company... they changes the role after joining.. this happened with me as well as with somw other people.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Negotiated the salary
Round 3 - One-on-one 

(1 Question)

  • Q1. I was interviewd by my reporting manager, the CEO himself
Interview experience
3
Average
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed in Apr 2024.

Round 1 - HR 

(2 Questions)

  • Q1. About work culture
  • Q2. About technical
Round 2 - Technical 

(1 Question)

  • Q1. Related to Transformer
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Not Selected

I was interviewed in Jul 2024.

Round 1 - Technical 

(10 Questions)

  • Q1. Can you tell me about yourself?
  • Q2. What are your responsibilities in the plant?
  • Ans. 

    As a Senior Engineer in the plant, my responsibilities include overseeing operations, managing projects, ensuring compliance with regulations, and leading a team of engineers.

    • Overseeing day-to-day operations in the plant

    • Managing projects related to plant upgrades or expansions

    • Ensuring compliance with safety and environmental regulations

    • Leading and mentoring a team of engineers

    • Troubleshooting technical issues and implem

  • Answered by AI
  • Q3. Why is tan delta testing conducted in power transformers?
  • Ans. 

    Tan delta testing is conducted in power transformers to assess the insulation condition and detect any potential faults.

    • Tan delta testing helps in evaluating the insulation quality of power transformers.

    • It can detect any potential issues such as moisture, contamination, or aging of insulation materials.

    • By measuring the tan delta value, engineers can assess the dielectric losses in the transformer.

    • Regular tan delta test...

  • Answered by AI
  • Q4. What is a vector group?
  • Ans. 

    A vector group is a method used to represent the phase relationship between the primary and secondary windings of a transformer.

    • Vector group indicates the connection of transformer windings and the phase shift between them.

    • It is represented by a combination of letters and numbers, such as Yd1, Dyn11, etc.

    • Different vector groups have different phase relationships, affecting the transformer's performance and operation.

    • Ve...

  • Answered by AI
  • Q5. What should be considered when erecting an IDT (Inverter duty Transformer)?
  • Ans. 

    Considerations when erecting an IDT (Inverter duty Transformer)

    • Ensure the transformer is designed for inverter duty applications

    • Properly size the transformer based on the inverter's output power

    • Consider the harmonic content of the inverter's output when selecting the transformer

    • Provide adequate ventilation and cooling for the transformer to handle the increased heat generated by the inverter

    • Ensure proper grounding and ...

  • Answered by AI
  • Q6. What is the star-delta connection in power transformers?
  • Ans. 

    Star-delta connection is a method used in power transformers to reduce starting current and improve efficiency.

    • Star-delta connection involves connecting the primary windings of the transformer in a star configuration during starting, and then switching to a delta configuration during normal operation.

    • This method helps in reducing the starting current drawn by the transformer, which is beneficial for the power system.

    • It...

  • Answered by AI
  • Q7. What types of conductors are used in high-tension (HT) lines, and what are their current capacities?
  • Ans. 

    High-tension (HT) lines use different types of conductors with varying current capacities.

    • Types of conductors used in HT lines include aluminum, steel, and composite materials

    • Aluminum conductors are commonly used due to their lightweight and high conductivity

    • Steel conductors are used for their strength and durability

    • Composite conductors are a newer technology that offer a balance of strength and conductivity

    • Current cap...

  • Answered by AI
  • Q8. What is the distance between poles in 33KV high tension lines?
  • Ans. 

    The distance between poles in 33KV high tension lines is typically around 50-60 meters.

    • The distance between poles in high tension lines is determined by factors such as terrain, voltage level, and local regulations.

    • In general, the distance can range from 50 to 60 meters for 33KV high tension lines.

    • This distance is important to ensure proper support and insulation of the conductors between poles.

  • Answered by AI
  • Q9. What is the process of laying LT cables?
  • Ans. 

    The process of laying LT cables involves planning, trenching, laying the cables, jointing, testing, and backfilling.

    • Plan the route and depth of the trench for laying the cables.

    • Excavate the trench to the required depth and width.

    • Lay the cables in the trench, ensuring proper alignment and support.

    • Joint the cables together using appropriate connectors.

    • Test the cables for continuity and insulation resistance.

    • Backfill the ...

  • Answered by AI
  • Q10. What is the process for attaching modules?
  • Ans. 

    The process for attaching modules involves identifying connection points, aligning the modules, securing them in place, and testing for functionality.

    • Identify connection points on both modules

    • Align the modules properly to ensure a secure fit

    • Secure the modules in place using appropriate fasteners or connectors

    • Test the functionality of the attached modules to ensure proper connection

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Why do you want to change jobs?
  • Ans. 

    Seeking new challenges and opportunities for growth in a more innovative environment.

    • Desire for new challenges and opportunities

    • Seeking growth and advancement

    • Looking for a more innovative work environment

  • Answered by AI
  • Q2. What can you share about your family?
  • Ans. 

    I come from a close-knit family of four, including my parents and younger sister.

    • My parents have always been supportive of my career choices and encouraged me to pursue my passion for engineering.

    • I have a younger sister who is currently studying computer science at university, following in my footsteps.

    • We enjoy spending quality time together, whether it's going on family vacations or simply having dinner at home.

  • Answered by AI

I applied via LinkedIn and was interviewed before Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Your professional years ,field in which I had experience?
  • Q2. Are you ready to take the challenge
  • Q3. Core expertise & challenges faced till date ?

Interview Preparation Tips

Interview preparation tips for other job seekers - It was good ,need to garner more knowledge so that core expectance are met
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jul 2023. There were 3 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Personal details and reasons for change
Round 2 - Technical 

(1 Question)

  • Q1. About my job profile, renewal sector and technical questions about my past experience.
Round 3 - Technical 

(1 Question)

  • Q1. With HoD and again technical questions were asked.

Interview Preparation Tips

Topics to prepare for JUNIPER GREEN ENERGY Senior Engineer interview:
  • Contract Management
  • Defect liability
  • Warranty Management
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Newspaper Ad and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. Wind turbines commissioning process and PLC software knowledge,wind turbines termination work
  • Q2. Converter test and DFIG working
  • Ans. 

    Converter test involves testing the performance and efficiency of a converter, while DFIG (Doubly Fed Induction Generator) is a type of generator used in wind turbines.

    • Converter test evaluates the performance of a power converter by analyzing its efficiency, power factor, and voltage regulation.

    • DFIG is a type of generator commonly used in wind turbines to convert mechanical energy into electrical energy.

    • Testing DFIG in...

  • Answered by AI
  • Q3. PLC and other wind software
  • Q4. Power cable termination
  • Q5. Grid charging process

Interview Preparation Tips

Interview preparation tips for other job seekers - You can apply on senvion official portal all details available in Google

Pete Hammond Power Solutions Interview FAQs

How many rounds are there in Pete Hammond Power Solutions interview?
Pete Hammond Power Solutions interview process usually has 2 rounds. The most common rounds in the Pete Hammond Power Solutions interview process are HR, Resume Shortlist and Technical.
What are the top questions asked in Pete Hammond Power Solutions interview?

Some of the top questions asked at the Pete Hammond Power Solutions interview -

  1. And I hope all going good and well all answers as per my experience and knowled...read more
  2. I have strong knowledge of transformer Manufacturing company. And all knowledge...read more
  3. Every years I have improved new vendor and strong knowledge of negotiations in ...read more

Tell us how to improve this page.

Pete Hammond Power Solutions Interview Process

based on 2 interviews

Interview experience

4.5
  
Good
View more

Interview Questions from Similar Companies

UTL Solar Interview Questions
3.5
 • 43 Interviews
Senvion Interview Questions
4.0
 • 19 Interviews
Gautam Solar Interview Questions
4.0
 • 16 Interviews
LM Wind Power Interview Questions
4.0
 • 13 Interviews
View all

Pete Hammond Power Solutions Reviews and Ratings

based on 11 reviews

4.7/5

Rating in categories

3.7

Skill development

4.5

Work-life balance

4.5

Salary

4.7

Job security

4.5

Company culture

4.5

Promotions

4.7

Work satisfaction

Explore 11 Reviews and Ratings
Compare Pete Hammond Power Solutions with

UTL Solar

3.5
Compare

Danfoss Power Solutions

4.1
Compare

LM Wind Power

4.0
Compare

Senvion

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview