i
Innovel Energy Services
Filter interviews by
Top trending discussions
I applied via Newspaper Ad and was interviewed before Mar 2023. There was 1 interview round.
Converter test involves testing the performance and efficiency of a converter, while DFIG (Doubly Fed Induction Generator) is a type of generator used in wind turbines.
Converter test evaluates the performance of a power converter by analyzing its efficiency, power factor, and voltage regulation.
DFIG is a type of generator commonly used in wind turbines to convert mechanical energy into electrical energy.
Testing DFIG in...
I applied via Naukri.com and was interviewed in Sep 2021. There was 1 interview round.
Line balancing is the process of evenly distributing work among different workstations in a production line.
It involves analyzing the production process to identify bottlenecks and inefficiencies
The goal is to optimize the use of resources and minimize idle time
It can be achieved through techniques like workload smoothing, task interleaving, and job rotation
Example: In an assembly line, line balancing can ensure that e...
Manufacturing Execution System (MES) is a software system that manages and monitors production processes on the factory floor.
MES provides real-time data on production processes, inventory levels, and quality control.
MES integrates with other systems such as Enterprise Resource Planning (ERP) and Product Lifecycle Management (PLM).
MES helps to optimize production processes, reduce waste, and improve efficiency.
Examples...
I applied via Naukri.com and was interviewed before Jan 2021. There were 2 interview rounds.
I applied via Newspaper Ad and was interviewed before Mar 2023. There was 1 interview round.
Converter test involves testing the performance and efficiency of a converter, while DFIG (Doubly Fed Induction Generator) is a type of generator used in wind turbines.
Converter test evaluates the performance of a power converter by analyzing its efficiency, power factor, and voltage regulation.
DFIG is a type of generator commonly used in wind turbines to convert mechanical energy into electrical energy.
Testing DFIG in...
I applied via Naukri.com and was interviewed in Sep 2021. There was 1 interview round.
Line balancing is the process of evenly distributing work among different workstations in a production line.
It involves analyzing the production process to identify bottlenecks and inefficiencies
The goal is to optimize the use of resources and minimize idle time
It can be achieved through techniques like workload smoothing, task interleaving, and job rotation
Example: In an assembly line, line balancing can ensure that e...
Manufacturing Execution System (MES) is a software system that manages and monitors production processes on the factory floor.
MES provides real-time data on production processes, inventory levels, and quality control.
MES integrates with other systems such as Enterprise Resource Planning (ERP) and Product Lifecycle Management (PLM).
MES helps to optimize production processes, reduce waste, and improve efficiency.
Examples...
I applied via Naukri.com and was interviewed before Jan 2021. There were 2 interview rounds.
Interview experience
based on 8 reviews
Rating in categories
Assistant Manager
12
salaries
| ₹4.5 L/yr - ₹7.2 L/yr |
Electrical Technician
10
salaries
| ₹1.3 L/yr - ₹2.2 L/yr |
Site Engineer
10
salaries
| ₹1.5 L/yr - ₹4 L/yr |
Technician
9
salaries
| ₹1.4 L/yr - ₹1.8 L/yr |
Station Technician
7
salaries
| ₹1.5 L/yr - ₹1.7 L/yr |
Suzlon Group
Greenko Group
ReNew
Tata Power Renewable Energy