Filter interviews by
My routine work in the purchasing department involves sourcing suppliers, negotiating contracts, and managing inventory.
Sourcing suppliers for goods and services needed by the company
Negotiating contracts with suppliers to ensure favorable terms and pricing
Managing inventory levels to prevent stockouts and minimize excess inventory
Processing purchase orders and invoices
Collaborating with other departments to understand
I applied via Naukri.com and was interviewed in Feb 2023. There were 3 interview rounds.
I appeared for an interview before Feb 2024.
Seeking new challenges and opportunities for growth
Desire for career advancement
Looking for a more challenging role
Seeking opportunities to learn new skills
Company culture or values not aligned with personal values
Relocation for personal reasons
I applied via Naukri.com and was interviewed in Feb 2022. There were 4 interview rounds.
Kohler Power interview questions for popular designations
I applied via Naukri.com and was interviewed before May 2023. There was 1 interview round.
Calliper test was undertaken which was quit good I think
I applied via Naukri.com and was interviewed in Mar 2022. There was 1 interview round.
I applied via Naukri.com and was interviewed in Sep 2021. There was 1 interview round.
Line balancing is the process of evenly distributing work among different workstations in a production line.
It involves analyzing the production process to identify bottlenecks and inefficiencies
The goal is to optimize the use of resources and minimize idle time
It can be achieved through techniques like workload smoothing, task interleaving, and job rotation
Example: In an assembly line, line balancing can ensure that e...
Manufacturing Execution System (MES) is a software system that manages and monitors production processes on the factory floor.
MES provides real-time data on production processes, inventory levels, and quality control.
MES integrates with other systems such as Enterprise Resource Planning (ERP) and Product Lifecycle Management (PLM).
MES helps to optimize production processes, reduce waste, and improve efficiency.
Examples...
I applied via Recruitment Consultant and was interviewed in Apr 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Apr 2020. There were 3 interview rounds.
I appeared for an interview before Mar 2021.
Round duration - 60 Minutes
Round difficulty - Medium
This round started with some questions from Programmable Logic Controllers or PLC followed by some basic questions from Intel 8051 Microcontroller.
PLCs are used to control machinery and automate processes in industrial settings.
Monitoring inputs from sensors
Executing control algorithms
Communicating with other devices
Logging data for analysis
Implementing safety functions
Examples: controlling a conveyor belt, regulating temperature in a furnace
Ladder logic programming is a graphical programming language used for PLCs, with basic elements like contacts, coils, timers, and counters.
Ladder logic consists of rungs, which are made up of inputs (contacts) and outputs (coils).
Contacts represent conditions that must be met for the output to be energized.
Coils are outputs that are energized when the conditions of the contacts are met.
Timers and counters are used to c...
PLC inputs and outputs include digital inputs, digital outputs, analog inputs, and analog outputs.
Digital inputs: used for receiving binary signals (on/off, high/low). Examples: push buttons, limit switches.
Digital outputs: used for sending binary signals. Examples: relays, solenoids.
Analog inputs: used for receiving continuous signals. Examples: temperature sensors, pressure transducers.
Analog outputs: used for sendin...
The S7 controller offers high performance and flexibility but can be complex to program and expensive.
Advantages: high performance, flexibility, scalability
Disadvantages: complexity in programming, expensive
Example: S7-1200 offers fast processing speeds and can be easily expanded with additional modules
Example: Programming for S7 controllers may require specialized training and expertise
The time stamp in S7-200 PLC is used to record the time when a specific event occurs.
Time stamp is a feature in S7-200 PLC that records the time when a specific event happens.
It helps in tracking the sequence of events and troubleshooting issues.
Time stamp can be used to monitor the performance of the PLC system.
Example: A time stamp can be recorded when a sensor detects a change in temperature.
Example: Time stamp can ...
Jnc stands for Jump and Call in the context of microcontrollers.
Jnc is an instruction used in microcontrollers to jump to a specified address if the carry flag is not set.
It is commonly used in conditional branching operations in microcontroller programming.
For example, in 8051 microcontroller assembly language, the instruction JNC label will jump to the specified label if the carry flag is not set.
The types of interrupts in the Intel 8051 microcontroller include external hardware interrupts, timer interrupts, and serial communication interrupts.
External hardware interrupts are triggered by external devices connected to the microcontroller.
Timer interrupts are generated by the internal timers of the microcontroller.
Serial communication interrupts occur when data is received or transmitted through the serial port.
...
Round duration - 50 Minutes
Round difficulty - Medium
This round was heavily inclined towards Operating System and Computer Networks and the interviewer asked questions revolving around the fundamentals of the subject.
A bootstrap program is a small program that initializes the operating system on a computer.
Bootstrap program is stored in ROM or EEPROM and is executed when the computer is powered on.
It loads the operating system kernel into memory and starts its execution.
Bootstrap program is responsible for setting up the initial state of the operating system.
Examples include BIOS (Basic Input/Output System) in PCs and UEFI (Unified
Demand paging is a memory management scheme where pages are only brought into memory when they are demanded by the program.
Pages are loaded into memory only when needed
Helps in reducing the amount of physical memory required
Improves overall system performance by allowing more processes to run simultaneously
Commonly used in virtual memory systems
Five essential UNIX commands are ls, cd, pwd, mkdir, and rm.
ls - list directory contents
cd - change directory
pwd - print working directory
mkdir - make directory
rm - remove files or directories
Different types of VPN include remote access VPN, site-to-site VPN, and client-to-site VPN.
Remote access VPN allows individual users to connect to a private network from a remote location.
Site-to-site VPN connects entire networks together over the internet.
Client-to-site VPN allows individual devices to connect to a private network.
Examples include OpenVPN, IPsec, and SSL VPN.
The OSI Reference Model is a conceptual framework that standardizes the functions of a telecommunication or computing system into seven layers.
The OSI Reference Model stands for Open Systems Interconnection Reference Model.
It consists of seven layers: Physical, Data Link, Network, Transport, Session, Presentation, and Application.
Each layer has specific functions and communicates with the adjacent layers for data trans...
TCP is a connection-oriented protocol that ensures reliable data delivery, while UDP is a connectionless protocol that focuses on speed.
TCP stands for Transmission Control Protocol and is used for reliable data transmission.
TCP establishes a connection between sender and receiver before data transfer.
TCP uses sequencing and acknowledgment to ensure data integrity.
UDP stands for User Datagram Protocol and is used for fa...
Round duration - 30 Minutes
Round difficulty - Easy
This is a cultural fitment testing round .HR was very frank and asked standard questions. Then we discussed about my
role.
Tip 1 : Must do Previously asked Interview as well as Online Test Questions.
Tip 2 : Go through all the previous interview experiences from Codestudio and Leetcode.
Tip 1 : Have at-least 2 good projects explained in short with all important points covered.
Tip 2 : Every skill must be mentioned.
Tip 3 : Focus on skills, projects and experiences more.
based on 7 interviews
Interview experience
based on 168 reviews
Rating in categories
Design Engineer
71
salaries
| ₹3 L/yr - ₹8 L/yr |
Assistant Manager
35
salaries
| ₹8.5 L/yr - ₹18.6 L/yr |
Senior Engineer
29
salaries
| ₹5.1 L/yr - ₹15.3 L/yr |
Deputy Manager
26
salaries
| ₹11 L/yr - ₹27.8 L/yr |
Senior Design Engineer
23
salaries
| ₹6 L/yr - ₹16.9 L/yr |
Cummins
Kirloskar Electric Company
Greaves Cotton
Ashok Leyland