Filter interviews by
Mechanical engine ATS system is a system that automatically starts and stops the engine based on certain conditions.
ATS stands for Automatic Transfer Switch
It is commonly used in backup power systems to ensure seamless transition between utility power and generator power
The system monitors the power supply and starts the engine when utility power fails, and stops it when power is restored
I can join on August 1st, 2022.
Earliest date available is August 1st, 2022.
Currently serving notice period until end of July 2022.
Flexible to discuss start date if needed.
Engine Control Units (ECUs) are electronic control units that manage various aspects of an engine's operation.
ECUs are responsible for controlling fuel injection, ignition timing, emissions, and other engine functions.
They receive input from various sensors and make adjustments to optimize engine performance.
Examples of ECUs include the Engine Control Module (ECM), Transmission Control Module (TCM), and Body Control Mo
I am a detail-oriented and organized individual with experience in back office operations.
I have worked as a Back Office Executive for XYZ Company for 3 years.
I am proficient in handling administrative tasks such as data entry, documentation, and record keeping.
I have strong analytical skills and can effectively identify and resolve issues or discrepancies.
I am familiar with various software and tools used in back offi...
My short term goal is to gain experience and develop my skills in the back office operations. My long term goal is to take on a leadership role and contribute to the growth and success of the organization.
Short term goal: Gain experience and develop skills in back office operations
Long term goal: Take on a leadership role and contribute to organizational growth
Examples: Learning different software systems, improving ef...
I applied via Campus Placement and was interviewed before Sep 2020. There was 1 interview round.
Mahindra Powerol interview questions for popular designations
posted on 1 Nov 2017
I was interviewed in Apr 2017.
My dream is to become a successful sales executive or purchase executive, leading a team to achieve targets and drive business growth.
To lead a high-performing team in achieving sales targets
To develop and implement effective sales strategies
To build strong relationships with clients and suppliers
To continuously learn and grow in the field of sales and purchasing
To contribute to the overall success and growth of the co
I am a highly motivated and results-driven professional with a proven track record in sales and purchasing.
Over 5 years of experience in sales and purchasing roles
Strong negotiation and communication skills
Proven ability to meet and exceed sales targets
Experience in building and maintaining client relationships
Proficient in CRM software and Microsoft Office suite
Top trending discussions
posted on 18 Jan 2025
I applied via Recruitment Consulltant and was interviewed in Dec 2024. There was 1 interview round.
posted on 28 Oct 2022
I applied via Approached by Company and was interviewed before Oct 2021. There was 1 interview round.
I applied via Company Website and was interviewed in Jul 2024. There was 1 interview round.
CPK is a statistical measure used to assess the capability of a process to produce output within specification limits.
CPK is calculated using the formula: CPK = (USL - LSL) / (6 * standard deviation)
A CPK value greater than 1 indicates that the process is capable of producing within specification limits
A CPK value less than 1 indicates that the process may not be capable of consistently producing within specification l
Ra in roughness tester is the average roughness value of the surface profile within a specified sampling length.
Ra is a parameter used to quantify the roughness of a surface.
It is calculated as the arithmetic average of the absolute values of the profile heights over the evaluation length.
Ra provides a measure of the deviation of the surface profile from the mean line.
It is commonly used in industries such as manufactu...
7QC tools are a set of quality control tools used for process improvement and problem-solving in quality management.
Check sheets: Used to collect and analyze data in a systematic way.
Histograms: Used to show frequency distribution of a process.
Pareto charts: Helps identify the most significant factors contributing to a problem.
Cause-and-effect diagrams: Used to identify and analyze potential causes of a problem.
Scatter...
The 8D methodology is a problem-solving approach used in quality management to identify, correct, and prevent recurring problems.
The 8D methodology consists of 8 steps: D0 - Plan, D1 - Team Formation, D2 - Problem Description, D3 - Interim Containment Action, D4 - Root Cause Analysis, D5 - Permanent Corrective Action, D6 - Prevent Recurrence, D7 - Recognize Team Effort, D8 - Closure and Team Disbandment
It is commonly u...
I applied via Company Website and was interviewed in Nov 2024. There was 1 interview round.
Work hard, it would be worth it
It is impossible to accurately estimate the number of trees in the campus without more information.
The number of trees can vary greatly depending on the size of the campus
Factors such as the type of trees, density of trees, and layout of the campus will all affect the estimate
One possible approach could be to estimate the number of trees in a small area and then extrapolate that number to the entire campus
based on 3 interviews
Interview experience
based on 88 reviews
Rating in categories
Deputy Manager
15
salaries
| ₹10.5 L/yr - ₹13.5 L/yr |
Commercial Executive
11
salaries
| ₹2.4 L/yr - ₹4.1 L/yr |
Assistant Manager
8
salaries
| ₹6.4 L/yr - ₹11.5 L/yr |
Service Engineer
8
salaries
| ₹1 L/yr - ₹4.5 L/yr |
Design Engineer
7
salaries
| ₹3.4 L/yr - ₹5 L/yr |
Kirloskar Electric Company
Greaves Cotton
Cummins
Ashok Leyland