I applied via Newspaper Ad and was interviewed before Mar 2023. There was 1 interview round.
Converter test involves testing the performance and efficiency of a converter, while DFIG (Doubly Fed Induction Generator) is a type of generator used in wind turbines.
Converter test evaluates the performance of a power converter by analyzing its efficiency, power factor, and voltage regulation.
DFIG is a type of generator commonly used in wind turbines to convert mechanical energy into electrical energy.
Testing DFIG in...
Top trending discussions
I applied via Recruitment Consulltant and was interviewed in Jun 2023. There were 4 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Aug 2021. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Jun 2023. There were 4 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Aug 2021. There was 1 interview round.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Senior Engineer
43
salaries
| ₹5 L/yr - ₹12 L/yr |
Engineer
39
salaries
| ₹3.5 L/yr - ₹6.2 L/yr |
Deputy Manager
28
salaries
| ₹7.2 L/yr - ₹17.3 L/yr |
Assistant Manager
27
salaries
| ₹7 L/yr - ₹16 L/yr |
Technician
27
salaries
| ₹2 L/yr - ₹4.3 L/yr |
Suzlon Group
Vestas
Siemens Gamesa Renewable Power Private Limited
Inox Wind