i
Persistent Systems
Filter interviews by
To enable data factory, you need to create a data factory resource in Azure and configure it with linked services, datasets, and pipelines.
Create a data factory resource in Azure portal
Configure linked services to connect to data sources and destinations
Define datasets to represent the data you want to process
Create pipelines to orchestrate the movement and transformation of data
Monitor and manage the data factory usin
To disable data factory, you can stop or delete the data factory resources.
Stop or delete the data factory pipelines and triggers
Deallocate or delete the data factory linked services
Disable or delete the data factory datasets and data flows
What people are saying about Persistent Systems
posted on 30 Nov 2024
Basics aptitude likes time speed distance
posted on 27 Jan 2024
I was interviewed before Jan 2023.
Deliverables are the tangible or intangible outputs of a project that are provided to the stakeholders.
Deliverables can be physical products, such as a building or a software application.
Deliverables can also be documents, such as project plans, reports, or specifications.
Deliverables can include completed tasks, milestones, or objectives.
Deliverables should meet the agreed-upon requirements and be delivered within the...
Model reviews are conducted to ensure accuracy and quality of the project's design.
Model reviews are conducted at various stages of the project to identify and resolve any design issues.
The purpose of model reviews is to ensure that the project's design meets the required standards and specifications.
Different types of model reviews include concept reviews, design reviews, and final reviews.
Concept reviews are conducte...
Capacity can be calculated by determining the maximum amount of work that can be completed in a given time period.
Calculate the total number of hours available for work in a specific time period
Determine the average amount of work that can be completed in one hour
Multiply the total hours available by the average amount of work per hour to get the capacity
Capacity = Total hours available * Average work completed per hou
Psychometric test. It was filled with confusing questions.
To complete the task in one week, prioritize tasks, allocate resources efficiently, set clear milestones, and communicate effectively with the client.
Prioritize tasks based on importance and urgency
Allocate resources effectively to ensure timely completion
Set clear milestones and deadlines to track progress
Communicate regularly with the client to provide updates and address any issues
Consider using project management t
I applied via Referral and was interviewed in Apr 2024. There were 2 interview rounds.
It was a standard Aptitude for logical Reasoning.
Case study was given to create a project plan live
I applied via Naukri.com
I applied via Naukri.com
The release plan is a subset of the project plan that outlines the specific features or deliverables to be released at each stage of the project.
The release plan is developed based on the overall project plan, taking into account the project timeline, resources, and dependencies.
It includes details such as the scope of each release, the timeline for each release, and the resources required for each release.
The release ...
I applied via Recruitment Consulltant and was interviewed in Oct 2023. There were 4 interview rounds.
based on 1 interview
Interview experience
based on 9 reviews
Rating in categories
Software Engineer
4.4k
salaries
| ₹2.5 L/yr - ₹9.5 L/yr |
Senior Software Engineer
3.9k
salaries
| ₹5 L/yr - ₹15.4 L/yr |
Lead Engineer
3.1k
salaries
| ₹10 L/yr - ₹30 L/yr |
Lead Software Engineer
3k
salaries
| ₹7.2 L/yr - ₹18.4 L/yr |
Project Lead
1.9k
salaries
| ₹13.2 L/yr - ₹38.8 L/yr |
Cognizant
TCS
IBM
Wipro