Deliverables are the tangible or intangible outputs of a project that are provided to the stakeholders.
Deliverables can be physical products, such as a building or a software application.
Deliverables can also be documents, such as project plans, reports, or specifications.
Deliverables can include completed tasks, milestones, or objectives.
Deliverables should meet the agreed-upon requirements and be delivered within the...
Model reviews are conducted to ensure accuracy and quality of the project's design.
Model reviews are conducted at various stages of the project to identify and resolve any design issues.
The purpose of model reviews is to ensure that the project's design meets the required standards and specifications.
Different types of model reviews include concept reviews, design reviews, and final reviews.
Concept reviews are conducte...
Discipline wise deliverables are interdependent and require coordination for successful project completion.
Each discipline has its own set of deliverables that are interdependent on each other.
Coordination is required to ensure timely delivery of each discipline's deliverables.
Examples of discipline wise deliverables include civil engineering drawings, electrical schematics, and mechanical designs.
Codes and standards are crucial for ensuring safety and efficiency in process industries.
ASME B31.3 for piping systems
NFPA 70 for electrical systems
API 650 for storage tanks
OSHA for workplace safety
ISO 9001 for quality management
ANSI/ISA-88 for batch control systems
Top trending discussions
To enable data factory, you need to create a data factory resource in Azure and configure it with linked services, datasets, and pipelines.
Create a data factory resource in Azure portal
Configure linked services to connect to data sources and destinations
Define datasets to represent the data you want to process
Create pipelines to orchestrate the movement and transformation of data
Monitor and manage the data factory usin
To disable data factory, you can stop or delete the data factory resources.
Stop or delete the data factory pipelines and triggers
Deallocate or delete the data factory linked services
Disable or delete the data factory datasets and data flows
posted on 30 Nov 2024
Basics aptitude likes time speed distance
I applied via Naukri.com and was interviewed in Jul 2024. There was 1 interview round.
As a Project Manager, my day to day activities include overseeing project timelines, communicating with team members and stakeholders, tracking progress, resolving issues, and ensuring project goals are met.
Overseeing project timelines and milestones
Communicating with team members and stakeholders
Tracking project progress and updating project documentation
Resolving issues and conflicts that arise during the project
Ensu...
I manage sharing resources by prioritizing tasks, communicating effectively, and utilizing resource management tools.
Prioritize tasks based on importance and urgency
Communicate with team members to ensure everyone is aware of resource allocation
Utilize resource management tools to track and allocate resources efficiently
I manage change requests by evaluating impact, prioritizing based on project goals, obtaining approval, and implementing changes.
Evaluate the impact of the change request on project scope, schedule, and budget.
Prioritize change requests based on project goals and objectives.
Obtain approval from stakeholders before implementing any changes.
Implement approved changes while ensuring minimal disruption to project progress.
...
I accept changes by first understanding the reasons behind them, communicating with stakeholders, creating a plan, and implementing the changes effectively.
Understand the reasons behind the changes
Communicate with stakeholders to gather feedback and address concerns
Create a detailed plan outlining the steps needed to implement the changes
Implement the changes effectively while monitoring progress and making adjustments
Risk management involves identifying, assessing, and mitigating potential risks to a project.
Identify potential risks by brainstorming with team members and stakeholders
Assess the likelihood and impact of each risk using a risk matrix
Develop a risk response plan for high-priority risks
Monitor and review risks throughout the project lifecycle
Communicate risks and mitigation strategies to stakeholders regularly
Project Governance refers to the framework, policies, procedures, and decision-making processes that guide project management.
Project Governance ensures that projects are aligned with organizational goals and objectives.
It involves defining roles and responsibilities, establishing communication channels, and setting up project controls.
Examples of Project Governance mechanisms include steering committees, project chart
Capacity can be calculated by determining the maximum amount of work that can be completed in a given time period.
Calculate the total number of hours available for work in a specific time period
Determine the average amount of work that can be completed in one hour
Multiply the total hours available by the average amount of work per hour to get the capacity
Capacity = Total hours available * Average work completed per hou
Psychometric test. It was filled with confusing questions.
To complete the task in one week, prioritize tasks, allocate resources efficiently, set clear milestones, and communicate effectively with the client.
Prioritize tasks based on importance and urgency
Allocate resources effectively to ensure timely completion
Set clear milestones and deadlines to track progress
Communicate regularly with the client to provide updates and address any issues
Consider using project management t
I applied via Recruitment Consulltant and was interviewed in Aug 2024. There was 1 interview round.
Utilized microservices architecture with containerization for deployment. Components interacted through REST APIs with database.
Implemented microservices architecture for modularity and scalability
Utilized containerization (e.g. Docker) for easy deployment and management
Components communicated through REST APIs for decoupling and flexibility
Database interactions handled through ORM (Object-Relational Mapping) for data ...
Estimations are performed by breaking down the project into smaller tasks, estimating the time and resources required for each task, and then summing up the estimates.
Break down the project into smaller tasks
Estimate the time and resources required for each task
Sum up the estimates to get an overall project estimation
I applied via Referral and was interviewed in Apr 2024. There were 2 interview rounds.
It was a standard Aptitude for logical Reasoning.
based on 9 reviews
Rating in categories
Senior Engineer
5.3k
salaries
| ₹5 L/yr - ₹17 L/yr |
Engineer
4.7k
salaries
| ₹1.5 L/yr - ₹8.5 L/yr |
Technical Lead
2k
salaries
| ₹8.5 L/yr - ₹30 L/yr |
Project Lead
1.6k
salaries
| ₹6 L/yr - ₹23 L/yr |
Senior Software Engineer
1.4k
salaries
| ₹4.8 L/yr - ₹18.2 L/yr |
TCS
Infosys
Wipro
Tech Mahindra