Persistent Systems Project Engineer Interview Questions and Answers

Updated 19 Jul 2024

Persistent Systems Project Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. How to enable data factory
  • Ans. 

    To enable data factory, you need to create a data factory resource in Azure and configure it with linked services, datasets, and pipelines.

    • Create a data factory resource in Azure portal

    • Configure linked services to connect to data sources and destinations

    • Define datasets to represent the data you want to process

    • Create pipelines to orchestrate the movement and transformation of data

    • Monitor and manage the data factory usin

  • Answered by AI
  • Q2. How to disable data factory
  • Ans. 

    To disable data factory, you can stop or delete the data factory resources.

    • Stop or delete the data factory pipelines and triggers

    • Deallocate or delete the data factory linked services

    • Disable or delete the data factory datasets and data flows

  • Answered by AI
Round 2 - One-on-one 

(2 Questions)

  • Q1. Ggtgvhlkhgyubjojghhjj
  • Q2. Hgfgjkingyhyujiokknjjjj
Round 3 - HR 

(2 Questions)

  • Q1. Salary discussand discussion
  • Q2. How much your expecting

Skills evaluated in this interview

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Basics aptitude likes time speed distance

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed before Jan 2023.

Round 1 - Technical 

(4 Questions)

  • Q1. Interview will be around concept of project management.
  • Q2. Change management
  • Q3. What are different deliverables?
  • Ans. 

    Deliverables are the tangible or intangible outputs of a project that are provided to the stakeholders.

    • Deliverables can be physical products, such as a building or a software application.

    • Deliverables can also be documents, such as project plans, reports, or specifications.

    • Deliverables can include completed tasks, milestones, or objectives.

    • Deliverables should meet the agreed-upon requirements and be delivered within the...

  • Answered by AI
  • Q4. Type of model review and it's purpose
  • Ans. 

    Model reviews are conducted to ensure accuracy and quality of the project's design.

    • Model reviews are conducted at various stages of the project to identify and resolve any design issues.

    • The purpose of model reviews is to ensure that the project's design meets the required standards and specifications.

    • Different types of model reviews include concept reviews, design reviews, and final reviews.

    • Concept reviews are conducte...

  • Answered by AI

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Naukri.com and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - One-on-one 

(6 Questions)

  • Q1. What is your day to day activities?
  • Ans. 

    As a Project Manager, my day to day activities include overseeing project timelines, communicating with team members and stakeholders, tracking progress, resolving issues, and ensuring project goals are met.

    • Overseeing project timelines and milestones

    • Communicating with team members and stakeholders

    • Tracking project progress and updating project documentation

    • Resolving issues and conflicts that arise during the project

    • Ensu...

  • Answered by AI
  • Q2. How do you manage sharing resources?
  • Ans. 

    I manage sharing resources by prioritizing tasks, communicating effectively, and utilizing resource management tools.

    • Prioritize tasks based on importance and urgency

    • Communicate with team members to ensure everyone is aware of resource allocation

    • Utilize resource management tools to track and allocate resources efficiently

  • Answered by AI
  • Q3. How do manage change requests?
  • Ans. 

    I manage change requests by evaluating impact, prioritizing based on project goals, obtaining approval, and implementing changes.

    • Evaluate the impact of the change request on project scope, schedule, and budget.

    • Prioritize change requests based on project goals and objectives.

    • Obtain approval from stakeholders before implementing any changes.

    • Implement approved changes while ensuring minimal disruption to project progress.

    • ...

  • Answered by AI
  • Q4. How do you accept changes, what are the steps you follow?
  • Ans. 

    I accept changes by first understanding the reasons behind them, communicating with stakeholders, creating a plan, and implementing the changes effectively.

    • Understand the reasons behind the changes

    • Communicate with stakeholders to gather feedback and address concerns

    • Create a detailed plan outlining the steps needed to implement the changes

    • Implement the changes effectively while monitoring progress and making adjustments

  • Answered by AI
  • Q5. How do you do risk management? Steps
  • Ans. 

    Risk management involves identifying, assessing, and mitigating potential risks to a project.

    • Identify potential risks by brainstorming with team members and stakeholders

    • Assess the likelihood and impact of each risk using a risk matrix

    • Develop a risk response plan for high-priority risks

    • Monitor and review risks throughout the project lifecycle

    • Communicate risks and mitigation strategies to stakeholders regularly

  • Answered by AI
  • Q6. Do you know Project Goverance?
  • Ans. 

    Project Governance refers to the framework, policies, procedures, and decision-making processes that guide project management.

    • Project Governance ensures that projects are aligned with organizational goals and objectives.

    • It involves defining roles and responsibilities, establishing communication channels, and setting up project controls.

    • Examples of Project Governance mechanisms include steering committees, project chart

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - After 1st round, I never heard back from HR, neither selected nor not-selected feedback. HR did not respond to emails or calls either.
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. One of your clients is pulling project from you . what would you do in this scenario
Round 2 - One-on-one 

(1 Question)

  • Q1. How do you calculate capacity
  • Ans. 

    Capacity can be calculated by determining the maximum amount of work that can be completed in a given time period.

    • Calculate the total number of hours available for work in a specific time period

    • Determine the average amount of work that can be completed in one hour

    • Multiply the total hours available by the average amount of work per hour to get the capacity

    • Capacity = Total hours available * Average work completed per hou

  • Answered by AI
Round 3 - Aptitude Test 

Psychometric test. It was filled with confusing questions.

Round 4 - HR 

(1 Question)

  • Q1. Team member is working on two projects. His performance is not good. how do you improve this performance
Round 5 - One-on-one 

(1 Question)

  • Q1. Client wants to complete a task in one week. what is approach
  • Ans. 

    To complete the task in one week, prioritize tasks, allocate resources efficiently, set clear milestones, and communicate effectively with the client.

    • Prioritize tasks based on importance and urgency

    • Allocate resources effectively to ensure timely completion

    • Set clear milestones and deadlines to track progress

    • Communicate regularly with the client to provide updates and address any issues

    • Consider using project management t

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - recently, march and april 2024, i had interview for project management role. Interview process took almost 2 months. Total five rounds were there including managerial round, psychometric, HRBP, etc. First and second rounds were related to PM role and third round was psychometric round. Fourth round was managerial round. I passed all round successfully by answering to all of them. Fifth round was HRBP round. Finally they released offer after submitting all relevant documents.
HR (POOXXXXX GXXXXX) told to need to visit bangalore office. purpose of meet was only discussion or greet and meet.
After i going to office that Manager, VinXXXX SomXXX, asked interview questions on programming, DB , phython and Project manager.
Later i realized why that FXXK person is asking questions on programming when position is for PM. They took for 1 hour and 30minutes.

After that no reply from HR(POOXXX). Even I sent email requesting for feedback and no reply from them.

I request dont waste waste your time and efforts.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Recruitment Consulltant and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Architecture of previous assignments . Explain deployment pattern as well as interaction between components and Database
  • Ans. 

    Utilized microservices architecture with containerization for deployment. Components interacted through REST APIs with database.

    • Implemented microservices architecture for modularity and scalability

    • Utilized containerization (e.g. Docker) for easy deployment and management

    • Components communicated through REST APIs for decoupling and flexibility

    • Database interactions handled through ORM (Object-Relational Mapping) for data ...

  • Answered by AI
  • Q2. Project Management basics

Interview Preparation Tips

Interview preparation tips for other job seekers - Have your basics ready for a Tech PM
Interview experience
3
Average
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. Embedded c, pointers and others
  • Q2. Sw process, documentation etc
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Tell me how you handled your project?
  • Q2. How do perforom estimations?
  • Ans. 

    Estimations are performed by breaking down the project into smaller tasks, estimating the time and resources required for each task, and then summing up the estimates.

    • Break down the project into smaller tasks

    • Estimate the time and resources required for each task

    • Sum up the estimates to get an overall project estimation

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be thorought with what you mention in your resume
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Referral and was interviewed in Apr 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

It was a standard Aptitude for logical Reasoning.

Round 2 - One-on-one 

(1 Question)

  • Q1. The interviewer was kind of rushed with the questions. Didn't care about any introductions. The interview was scheduled for 45 minutes, however, he wrapped it up within 20 mins. Of course, the next day's r...
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Assignment 

Case study was given to create a project plan live

Round 2 - One-on-one 

(1 Question)

  • Q1. Questions were asked on project plan
Round 3 - Technical 

(1 Question)

  • Q1. Scenario based questions

Persistent Systems Interview FAQs

How many rounds are there in Persistent Systems Project Engineer interview?
Persistent Systems interview process usually has 3 rounds. The most common rounds in the Persistent Systems interview process are HR and One-on-one Round.
What are the top questions asked in Persistent Systems Project Engineer interview?

Some of the top questions asked at the Persistent Systems Project Engineer interview -

  1. How to enable data fact...read more
  2. How to disable data fact...read more
  3. Ggtgvhlkhgyubjojgh...read more

Tell us how to improve this page.

Persistent Systems Project Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more
Join Persistent Systems See Beyond, Rise Above
Persistent Systems Project Engineer Salary
based on 145 salaries
₹3 L/yr - ₹10 L/yr
5% more than the average Project Engineer Salary in India
View more details

Persistent Systems Project Engineer Reviews and Ratings

based on 9 reviews

1.8/5

Rating in categories

1.9

Skill development

1.7

Work-life balance

1.5

Salary

1.8

Job security

1.7

Company culture

1.8

Promotions

1.7

Work satisfaction

Explore 9 Reviews and Ratings
Software Engineer
4.4k salaries
unlock blur

₹2.5 L/yr - ₹9.6 L/yr

Senior Software Engineer
3.8k salaries
unlock blur

₹5 L/yr - ₹15.4 L/yr

Lead Engineer
3.1k salaries
unlock blur

₹9.9 L/yr - ₹30 L/yr

Lead Software Engineer
3k salaries
unlock blur

₹7.2 L/yr - ₹18.4 L/yr

Project Lead
1.9k salaries
unlock blur

₹13.2 L/yr - ₹38.8 L/yr

Explore more salaries
Compare Persistent Systems with

Cognizant

3.8
Compare

TCS

3.7
Compare

IBM

4.0
Compare

Wipro

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview