Round 1 - Technical 

(3 Questions)

  • Q1. Technical quections and overall logic
  • Q2. Questions about planning profile
  • Q3. Questions about overall construction process
Round 2 - HR 

(1 Question)

  • Q1. Overall personality and attitude

Interview Preparation Tips

Interview preparation tips for other job seekers - Relax and share your technical knowledge

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Discraib and draw slab section
  • Q2. Draw scetion and elevation bath room
  • Ans. 

    Section and elevation drawings of a bathroom

    • Include dimensions for all fixtures and fittings

    • Show the placement of plumbing lines and electrical outlets

    • Label materials and finishes for walls, floors, and fixtures

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Tell mi about us
  • Ans. 

    A leading engineering company specializing in innovative solutions for various industries.

    • Provides cutting-edge engineering solutions

    • Works with a wide range of industries such as automotive, aerospace, and technology

    • Focuses on research and development to stay ahead of the competition

  • Answered by AI
  • Q2. Last company review
  • Ans. 

    Received positive feedback on technical skills and leadership abilities.

    • Received commendation for successfully leading a team in completing a major project ahead of schedule

    • Recognized for consistently providing innovative solutions to complex technical challenges

    • Received high ratings for communication skills and ability to collaborate effectively with cross-functional teams

  • Answered by AI

I applied via Walk-in and was interviewed in Mar 2022. There were 3 interview rounds.

Round 1 - Assignment 

Listing WBS in MSP
Making MSP model

Round 2 - Technical 

(1 Question)

  • Q1. Questions on your experience
Round 3 - HR 

(1 Question)

  • Q1. Payment Discussion Joining date

Interview Preparation Tips

Topics to prepare for Mantra Properties Planning Engineer interview:
  • MSP
  • Excel
  • AutoCAD
Interview preparation tips for other job seekers - Early joiner is best, learn MSP, learn Excel, must have bike for traveling
Interview experience
4
Good
Difficulty level
-
Process Duration
Less than 2 weeks
Result
No response

I appeared for an interview in Sep 2023.

Round 1 - One-on-one 

(1 Question)

  • Q1. Basic question about previous company and work responsibilities

Interview Questionnaire 

3 Questions

  • Q1. What is hooks law ?
  • Ans. 

    Hook's law states that the force needed to extend or compress a spring is directly proportional to the distance it is stretched or compressed.

    • Hook's law is a principle in physics that describes the behavior of springs and elastic materials.

    • It states that the force exerted by a spring is directly proportional to the displacement or change in length of the spring.

    • The law can be mathematically represented as F = kx, where...

  • Answered by AI
  • Q2. What is homeslaw ?
  • Ans. 

    Homeslaw is a law that states that the rate of cooling of an object is proportional to the temperature difference between the object and its surroundings.

    • Homeslaw is also known as Newton's law of cooling.

    • It is commonly used in thermodynamics and heat transfer.

    • The law can be expressed mathematically as dQ/dt = -hA(T - Ts), where dQ/dt is the rate of heat transfer, h is the heat transfer coefficient, A is the surface are...

  • Answered by AI
  • Q3. Have you worked in civil side

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident

Interview Questionnaire 

1 Question

  • Q1. Technical

I applied via Referral and was interviewed in Jan 2021. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Civil structural, finishing and mep. These subjects have to be known.

Interview Preparation Tips

Interview preparation tips for other job seekers - Not only civil any specialization, you have to know civil structural, finishing in details, electrical, plumbing, land scaping all things. Have Knowledge everything.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(4 Questions)

  • Q1. Just Try to answer honestly
  • Q2. Stay Confident Happy
  • Q3. Draw RCC Structure
  • Ans. 

    RCC structure is a reinforced concrete structure commonly used in construction.

    • RCC structures consist of concrete reinforced with steel bars for added strength

    • Common types of RCC structures include beams, columns, slabs, and walls

    • RCC structures are designed to withstand heavy loads and provide durability

    • Proper reinforcement detailing is crucial for the structural integrity of RCC structures

  • Answered by AI
  • Q4. Tell About MEP drawing
  • Ans. 

    MEP drawings are detailed plans that show the mechanical, electrical, and plumbing systems of a building.

    • MEP drawings include layouts for HVAC systems, electrical wiring, plumbing fixtures, and fire protection systems.

    • They are essential for coordinating the installation of these systems during construction.

    • MEP drawings also indicate the location of equipment, materials, and connections needed for the systems to functio...

  • Answered by AI
Round 3 - One-on-one 

(1 Question)

  • Q1. Draw a section of Plumbing
  • Ans. 

    A section of plumbing typically includes pipes, fittings, and fixtures for water supply and drainage systems.

    • Include pipes for both water supply and drainage systems

    • Show fittings such as elbows, tees, and couplings

    • Include fixtures like sinks, toilets, and showers

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Improving your basic knowledge
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
-
Result
Selected Selected

I applied via Walk-in

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Maivan work know waterproofing work check, brick work, plastering, painting, putty, primary , gypsum work know, falceling, tile marvel, granite, wooden work know, upvc mep railing scating work check,
  • Ans. Interview time I'm speak
  • Answered by lalatsahoo
  • Q2. Any question & answer i can speak

Interview Preparation Tips

Interview preparation tips for other job seekers - I can speak English, hindi, odia, finishing work total know, stacher
My present company my home group
My pvc company aparna construction
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2024. There were 2 interview rounds.

Round 1 - Technical 

(5 Questions)

  • Q1. What is Total Float and Free Float?
  • Ans. 

    Total Float is the amount of time an activity can be delayed without delaying the project completion date, while Free Float is the amount of time an activity can be delayed without delaying the early start of any successor activity.

    • Total Float is the amount of time an activity can be delayed without delaying the project completion date.

    • Free Float is the amount of time an activity can be delayed without delaying the ear...

  • Answered by AI
  • Q2. How do you plan procurement of construction materials?
  • Ans. 

    I plan procurement of construction materials by analyzing project requirements, creating a detailed material list, obtaining quotes from suppliers, negotiating prices, and ensuring timely delivery.

    • Analyze project requirements to determine the quantity and type of materials needed

    • Create a detailed material list specifying the required quantities, specifications, and quality standards

    • Obtain quotes from multiple suppliers...

  • Answered by AI
  • Q3. Activity wise Standard labour productivity
  • Q4. What was Modular floor cycle in your last project?
  • Ans. 

    Modular floor cycle is a construction method where floors are built in sections off-site and then assembled on-site.

    • Modular floor cycle involves prefabricating floor sections off-site

    • These sections are then transported to the construction site for assembly

    • This method can help speed up construction timelines and improve quality control

  • Answered by AI
  • Q5. What challenges had you experienced in achieving the desired slab cycle and how did you overcome?
  • Ans. 

    I faced challenges in achieving the desired slab cycle due to material delays and manpower shortages.

    • Material delays caused disruptions in the construction schedule.

    • Manpower shortages led to inefficiencies in the work progress.

    • Implemented better coordination with suppliers to ensure timely delivery of materials.

    • Hired additional workers to address the manpower shortage.

    • Adjusted the project timeline to accommodate unexpe

  • Answered by AI
Round 2 - HR 

(4 Questions)

  • Q1. Educational qualification background
  • Q2. Details of previous organizations and job tenure
  • Ans. 

    I have worked at two organizations in the past with an average job tenure of 3 years.

    • Worked at ABC Company for 4 years as a Planning Engineer

    • Joined XYZ Corporation as a Senior Planning Engineer and worked for 2 years

    • Experience includes project scheduling, resource allocation, and budget management

  • Answered by AI
  • Q3. Why do I need to change my present job?
  • Ans. 

    Seeking new challenges, growth opportunities, and a better work-life balance.

    • Desire for career advancement and professional development

    • Seeking a more challenging and rewarding role

    • Looking for a better work-life balance

    • Want to work in a more innovative or dynamic environment

    • Seeking better compensation or benefits

    • Company restructuring or changes in management

  • Answered by AI
  • Q4. Expected Salary?
  • Ans. 

    Negotiable based on experience and benefits package

    • Salary expectations are flexible and dependent on the overall compensation package

    • Open to discussing salary range during the interview process

    • Seeking competitive compensation aligned with industry standards

  • Answered by AI

Interview Preparation Tips

Topics to prepare for DTC Projects Senior Planning Engineer interview:
  • MSP
  • P6
  • IS456
  • IS1200
  • Reinforcement rolling margin
  • Labour Productivity
  • MS Excel
Interview preparation tips for other job seekers - Very friendly job interview session, cool interviewers!

Panchshil Realty Interview FAQs

How many rounds are there in Panchshil Realty Planning Engineer interview?
Panchshil Realty interview process usually has 2 rounds. The most common rounds in the Panchshil Realty interview process are Technical and HR.
What are the top questions asked in Panchshil Realty Planning Engineer interview?

Some of the top questions asked at the Panchshil Realty Planning Engineer interview -

  1. Questions about overall construction proc...read more
  2. Technical quections and overall lo...read more
  3. Questions about planning prof...read more

Tell us how to improve this page.

Panchshil Realty Planning Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

DRA Homes Interview Questions
4.5
 • 23 Interviews
N.K. Realtors Interview Questions
4.2
 • 20 Interviews
JP Infra Interview Questions
3.7
 • 19 Interviews
DTC Projects Interview Questions
4.0
 • 17 Interviews
PS Group Interview Questions
3.8
 • 16 Interviews
Bullmen Realty Interview Questions
3.0
 • 14 Interviews
View all
Panchshil Realty Planning Engineer Salary
based on 8 salaries
₹3.5 L/yr - ₹6.3 L/yr
29% less than the average Planning Engineer Salary in India
View more details

Panchshil Realty Planning Engineer Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

3.0

Salary

5.0

Job security

4.0

Company culture

3.0

Promotions

4.0

Work satisfaction

Explore 1 Review and Rating
Assistant Manager
59 salaries
unlock blur

₹4 L/yr - ₹9 L/yr

Manager
27 salaries
unlock blur

₹7 L/yr - ₹15.1 L/yr

Deputy Manager
26 salaries
unlock blur

₹7.2 L/yr - ₹16.9 L/yr

Senior Manager
24 salaries
unlock blur

₹10.5 L/yr - ₹18 L/yr

Senior Officer
18 salaries
unlock blur

₹3.3 L/yr - ₹6.6 L/yr

Explore more salaries
Compare Panchshil Realty with

Realty Assistant

3.9
Compare

Kunal Structure

3.7
Compare

Omkar Realtors and Developers Group

3.8
Compare

HM Group

4.4
Compare
Did you find this page helpful?
Yes No
write
Share an Interview