Q1. How will you take a proportion on site ? Or how will you tell labour ?
To take a proportion on site, I would use a measuring tape or a measuring instrument to determine the required ratio of materials or dimensions.
Measure the dimensions of the objects or areas that need to be proportioned
Calculate the required ratio based on the project specifications
Communicate the ratio to the laborers or workers on site
Provide clear instructions on how to mix or apply the materials in the correct proportion
Supervise the laborers to ensure they follow the ins...read more
Q2. How much water required for 1 cu.m in M20 proportion?
The water required for 1 cu.m in M20 proportion is approximately 186 liters.
The water-cement ratio for M20 concrete is generally 0.55.
The water content is calculated based on the weight of cement used.
For 1 cu.m of M20 concrete, the water required is around 186 liters.
The water content may vary slightly depending on factors like aggregate moisture content.
Q3. What will be the Required depth for laying of pipe for water supply from top of the pipe ?
The required depth for laying a pipe for water supply from the top of the pipe depends on various factors.
The depth of the pipe should be sufficient to prevent freezing in cold climates.
The depth should also consider the terrain and any potential obstacles.
Local regulations and codes may specify minimum depth requirements.
The depth may vary based on the pipe material and diameter.
Consideration should be given to future maintenance and accessibility.
For example, in a residenti...read more
Q4. What is the basic requirment for execution of site ?
The basic requirement for execution of a site is proper planning and coordination.
Proper planning and coordination are essential for the successful execution of a site.
Clear understanding of project requirements and objectives.
Availability of necessary resources such as materials, equipment, and manpower.
Effective communication and collaboration among the project team.
Adherence to safety regulations and standards.
Regular monitoring and supervision of the construction activiti...read more
Q5. How much feet comes in 1 inch ?
1 inch is equal to 0.0833 feet.
1 inch is equal to 0.0833 feet.
To convert inches to feet, divide the number of inches by 12.
For example, 24 inches is equal to 2 feet (24/12 = 2).
Q6. What is the exactly meaning of kg/cm2 ?
kg/cm2 is a unit of pressure commonly used in engineering and construction.
kg/cm2 stands for kilogram per square centimeter.
It is a unit of pressure that measures the force exerted on a surface area.
It is commonly used in civil engineering and construction to measure the strength and stability of materials.
For example, the compressive strength of concrete is often measured in kg/cm2.
1 kg/cm2 is equal to 98,066.5 pascals or 0.981 bar.