I applied via Approached by Company and was interviewed in Apr 2018. There was 1 interview round.
The required depth for laying a pipe for water supply from the top of the pipe depends on various factors.
The depth of the pipe should be sufficient to prevent freezing in cold climates.
The depth should also consider the terrain and any potential obstacles.
Local regulations and codes may specify minimum depth requirements.
The depth may vary based on the pipe material and diameter.
Consideration should be given to future...
kg/cm2 is a unit of pressure commonly used in engineering and construction.
kg/cm2 stands for kilogram per square centimeter.
It is a unit of pressure that measures the force exerted on a surface area.
It is commonly used in civil engineering and construction to measure the strength and stability of materials.
For example, the compressive strength of concrete is often measured in kg/cm2.
1 kg/cm2 is equal to 98,066.5 pascal
To take a proportion on site, I would use a measuring tape or a measuring instrument to determine the required ratio of materials or dimensions.
Measure the dimensions of the objects or areas that need to be proportioned
Calculate the required ratio based on the project specifications
Communicate the ratio to the laborers or workers on site
Provide clear instructions on how to mix or apply the materials in the correct prop...
The basic requirement for execution of a site is proper planning and coordination.
Proper planning and coordination are essential for the successful execution of a site.
Clear understanding of project requirements and objectives.
Availability of necessary resources such as materials, equipment, and manpower.
Effective communication and collaboration among the project team.
Adherence to safety regulations and standards.
Regul...
I have learned effective project management, problem-solving skills, and the importance of clear communication.
Developed strong project management skills by overseeing multiple construction projects simultaneously
Enhanced problem-solving abilities by resolving complex technical issues on site
Improved communication skills through regular coordination with clients, contractors, and team members
The water required for 1 cu.m in M20 proportion is approximately 186 liters.
The water-cement ratio for M20 concrete is generally 0.55.
The water content is calculated based on the weight of cement used.
For 1 cu.m of M20 concrete, the water required is around 186 liters.
The water content may vary slightly depending on factors like aggregate moisture content.
1 inch is equal to 0.0833 feet.
1 inch is equal to 0.0833 feet.
To convert inches to feet, divide the number of inches by 12.
For example, 24 inches is equal to 2 feet (24/12 = 2).
I applied via Campus Placement and was interviewed before Apr 2020. There were 3 interview rounds.
Checking points in beam and column are critical for ensuring structural integrity.
Checking for cracks or deformations
Ensuring proper alignment and levelness
Verifying adequate reinforcement
Checking for proper bearing and connection details
Using non-destructive testing methods
Following applicable codes and standards
I applied via Naukri.com and was interviewed in Apr 2021. There were 3 interview rounds.
Interview questions for Senior Engineer position on data structures and memory management.
Write C programs to insert and delete nodes at the beginning, end, and middle of a linked list.
Understand the differences between singly and doubly linked lists.
Explain what segmentation fault is and how it occurs.
Differentiate between malloc and calloc functions.
Define memory leak and how it can be prevented.
Understand the XOR lo...
Some of the top questions asked at the P. L. Adke Civil Site Engineer interview -
TCS
Accenture
Wipro
Cognizant