The approximate cost per square foot for MEPF works varies depending on the type of project (residential or commercial) and location.
Cost per square foot for MEPF works in residential projects typically range from $3 to $8.
Cost per square foot for MEPF works in commercial projects can range from $5 to $12.
Factors such as project complexity, location, and quality of materials can also impact the cost.
For example, a high...
Top trending discussions
posted on 4 Feb 2022
I applied via Naukri.com and was interviewed in Jan 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Apr 2024. There were 4 interview rounds.
posted on 18 Jun 2023
I applied via Company Website and was interviewed in Oct 2023. There were 6 interview rounds.
posted on 14 Mar 2024
I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.
Discuss about experience
I applied via Naukri.com and was interviewed in Dec 2022. There were 3 interview rounds.
About high rise buildings and construction
posted on 25 Mar 2023
I applied via Naukri.com and was interviewed before Mar 2022. There were 2 interview rounds.
The area of projects and types of projects I have worked on vary greatly.
I have worked on projects in various industries including construction, healthcare, and technology.
Types of projects I have worked on include software development, building construction, and medical equipment installation.
I am adaptable and able to quickly learn about new industries and project types.
I have experience working on both small and lar
posted on 4 Feb 2022
I applied via Naukri.com and was interviewed in Jan 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Jun 2021. There were 3 interview rounds.
The height of a washbasin should be between 800mm to 850mm from the finished floor level.
The height of the washbasin should be comfortable for the user to use.
It should be installed at a height that allows for easy access to the faucet and drain.
The height should also be appropriate for the type of users, such as children or wheelchair users.
The height can vary depending on the type of washbasin and the location of ins...
Conductor load carrying capacity refers to the maximum amount of electrical current that a conductor can safely carry without overheating or causing damage.
The load carrying capacity of a conductor depends on its size, material, and insulation.
The National Electrical Code (NEC) provides tables and formulas to calculate the maximum current a conductor can carry.
Factors such as ambient temperature, installation method, a...
Transformers are of two types - Step-up and Step-down. Step-up transformers increase voltage while Step-down transformers decrease voltage.
Step-up transformers are used in power plants to increase voltage for transmission over long distances.
Step-down transformers are used in households to decrease voltage for safe use.
Other types of transformers include isolation transformers, autotransformers, and instrument transfor...
Safety devices on transformers protect against overloading and overheating.
Safety devices include fuses, circuit breakers, and thermal protectors.
Fuses are designed to melt and break the circuit when the current exceeds a certain level.
Circuit breakers trip and open the circuit when the current exceeds a certain level.
Thermal protectors sense the temperature and disconnect the transformer when it exceeds a certain leve...
The procedure for lift installation involves several steps including site preparation, equipment delivery, installation of guide rails and car frame, electrical and mechanical connections, and testing.
Site preparation including excavation and foundation work
Delivery of equipment including guide rails, car frame, and lift machinery
Installation of guide rails and car frame
Electrical and mechanical connections including w...
Verify contractor bill by checking quantities, rates, and work done.
Check quantities of materials used
Verify rates charged for each item
Ensure work done matches the bill
Compare bill with contract terms
Check for any discrepancies or errors
Request supporting documents if necessary
FDD field dry density test is a method to determine the density of soil in the field.
FDD stands for Field Dry Density.
It is a test conducted on soil to measure its density.
The test involves extracting a soil sample from the field and determining its dry weight and volume.
The dry density is calculated by dividing the dry weight of the soil sample by its volume.
This test helps in assessing the compaction and quality of s
The slump in column concreting should be between 150-175 mm.
The slump should be measured before pouring the concrete.
The slump should be consistent throughout the column.
The slump should not exceed 175 mm to avoid segregation.
The slump should not be less than 150 mm to ensure proper compaction.
The slump can be adjusted by adding water or admixtures.
The slump test should be performed according to ASTM standards.
Slump in column concreting 90 to 100 mm
Slump refers to the consistency of the concrete mix
A slump of 90 to 100 mm indicates a very wet and unstable mix
This can lead to issues with the structural integrity of the column
Possible causes include incorrect water-cement ratio or improper mixing
Solutions may include adjusting the mix proportions or using additives to improve stability
Assistant Manager
25
salaries
| ₹4.4 L/yr - ₹11.5 L/yr |
Manager
12
salaries
| ₹9 L/yr - ₹17.5 L/yr |
Deputy Manager
12
salaries
| ₹6.2 L/yr - ₹12.5 L/yr |
Sales Manager
10
salaries
| ₹8.5 L/yr - ₹11 L/yr |
General Manager
10
salaries
| ₹22 L/yr - ₹28.7 L/yr |
Prestige Group
Brigade Group
Sobha
Godrej Properties