Filter interviews by
Be the first one to contribute and help others!
I applied via Walk-in and was interviewed before Aug 2020. There was 1 interview round.
I applied via unstop and was interviewed before Oct 2023. There were 3 interview rounds.
It was medium to difficult level test
Bus bar schemes are different ways of connecting bus bars in power systems.
Single bus bar scheme
Double bus bar scheme
Main and transfer bus bar scheme
Ring bus bar scheme
Breaker and a half scheme
Mesh bus bar scheme
The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.
The circuit breaker is the first equipment in the sequence.
Next comes the isolator switch.
After that, the earth switch is operated.
Then the line disconnector is opened.
Finally, the transformer is disconnected from the line.
The sequence is reversed when the line bay is put back into service.
I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.
About ai
today generation
I applied via Job Portal
I applied via Approached by Company and was interviewed in Apr 2024. There was 1 interview round.
Types of process include batch process, continuous process, and hybrid process.
Batch process involves processing a set amount of materials at one time
Continuous process involves ongoing production without interruption
Hybrid process combines elements of both batch and continuous processes
Financial Analyst
138
salaries
| ₹3.2 L/yr - ₹11.1 L/yr |
Finance Executive
135
salaries
| ₹2.5 L/yr - ₹7.5 L/yr |
Assistant Manager
93
salaries
| ₹7.9 L/yr - ₹16.5 L/yr |
Design Engineer
78
salaries
| ₹3 L/yr - ₹8 L/yr |
Senior Financial Analyst
76
salaries
| ₹6.2 L/yr - ₹11.6 L/yr |
OPPO
LG Electronics
Cargill
AECOM