Filter interviews by
I applied via Naukri.com and was interviewed in Dec 2018. There were 5 interview rounds.
The process of computing coordinates from a drawing, particularly circles.
Identify the center point of the circle on the drawing.
Measure the radius of the circle accurately.
Use mathematical formulas to calculate the coordinates of points on the circle.
Consider any scaling or transformation factors applied to the drawing.
Verify the computed coordinates by comparing them with known reference points.
Calculation of earth work involves determining the volume of earth to be excavated or filled in a construction project.
Earth work calculation is based on the principle of cross-sections.
The area of each cross-section is multiplied by the distance between them to get the volume.
Different methods like average end area, prismoidal formula, or grid method can be used for calculation.
Survey data, including elevations and co...
Top trending discussions
posted on 4 Aug 2024
Structure complete at the time taken as built coordinate
Laying out a survey for a site involves determining property boundaries and marking them with stakes or flags.
Start by reviewing property deeds and legal documents to understand boundaries
Use surveying equipment like total stations or GPS to measure and mark boundaries accurately
Consider any existing structures or obstacles on the site that may affect the survey layout
Setting out coordinate involves establishing points on the ground based on a specific coordinate system.
Use surveying equipment like total stations or GPS to accurately measure and mark points
Ensure the coordinate system used is consistent and accurate
Verify the points set out match the design or plan specifications
I applied via Approached by Company and was interviewed in Aug 2022. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Oct 2022. There were 3 interview rounds.
posted on 31 Jul 2021
I applied via Naukri.com and was interviewed in Feb 2021. There were 5 interview rounds.
The unit weight of reinforcement bar can be found by calculating the weight per unit length.
The unit weight of reinforcement bar is calculated by dividing the weight of the bar by its length.
The weight of the bar can be determined by multiplying the cross-sectional area of the bar by the density of the material.
The length of the bar is measured in meters or feet, depending on the unit system used.
The density of the mat...
Unit weights of building materials are important for quantity surveying.
Unit weight of concrete is around 2400 kg/m³
Unit weight of brick is around 1920 kg/m³
Unit weight of steel is around 7850 kg/m³
Unit weight of timber is around 500 kg/m³
Unit weight of glass is around 2500 kg/m³
Manpower productivity refers to the efficiency of workers in completing tasks within a given timeframe.
It is important to measure and track productivity to identify areas for improvement.
Factors that can affect productivity include training, equipment, and work environment.
Productivity can be improved through better planning, organization, and communication.
Examples of productivity measures include output per worker, t...
The procedure for billing involves preparing an invoice based on the work completed and submitting it to the client for payment.
Review the contract to ensure all work completed is billable
Prepare an invoice detailing the work completed and the corresponding costs
Submit the invoice to the client for payment within the agreed upon timeframe
Follow up with the client to ensure payment is received on time
Yes, bar bending schedule is calculated by determining the number, length, and shape of bars required for a reinforced concrete structure.
Calculate the total length of bars required for each size and type
Determine the number of bars required for each size and type
Calculate the shape and bending details of each bar
Prepare a detailed schedule of all the bars required for the structure
Ensure compliance with design and con
Piping Engineer
131
salaries
| ₹2.2 L/yr - ₹10 L/yr |
QA QC Engineer
61
salaries
| ₹3 L/yr - ₹8.1 L/yr |
Planning Engineer
56
salaries
| ₹2.5 L/yr - ₹11.4 L/yr |
Safety Officer
50
salaries
| ₹2.8 L/yr - ₹5.3 L/yr |
Mechanical Engineer
34
salaries
| ₹7.3 L/yr - ₹14.5 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Punj Lloyd