Onshore Construction Land Surveyor Interview Questions and Answers

Updated 15 Sep 2023

Onshore Construction Land Surveyor Interview Experiences

1 interview found

Land Surveyor Interview Questions & Answers

user image Anonymous

posted on 15 Sep 2023

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I was interviewed before Sep 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(5 Questions)

  • Q1. How many years of experience
  • Q2. Before which company are you working
  • Q3. Do you know mechanical survey work
  • Ans. 

    Yes, I am familiar with mechanical survey work including the use of equipment such as total stations and GPS devices.

    • I have experience using total stations to measure angles and distances on construction sites.

    • I am proficient in using GPS devices to accurately determine positions and elevations.

    • I am knowledgeable about the principles of mechanical survey work and how to apply them in the field.

  • Answered by AI
  • Q4. Which type of instruments used
  • Ans. 

    Various instruments such as total stations, GPS receivers, levels, and theodolites are used in land surveying.

    • Total stations are electronic devices used for measuring angles and distances.

    • GPS receivers use satellite signals to determine precise locations on the Earth's surface.

    • Levels are used to determine height differences between points on the ground.

    • Theodolites are optical instruments used for measuring angles in th

  • Answered by AI
  • Q5. How to check centre line of foundation
  • Ans. 

    To check the center line of a foundation, use a measuring tape or string to mark the center point and ensure it aligns with the planned layout.

    • Measure the width of the foundation and mark the center point using a measuring tape.

    • Use a string or chalk line to create a straight line from one end of the foundation to the other, passing through the center point.

    • Check the alignment of the center line with the planned layout ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good quality work at site

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Drawing as built
  • Ans. 

    Structure complete at the time taken as built coordinate

  • Answered by Mohammad Jaleel Ahmed
  • Q2. Site position moment
  • Q3. Topography survey
  • Q4. Lay out survey for site
  • Ans. 

    Laying out a survey for a site involves determining property boundaries and marking them with stakes or flags.

    • Start by reviewing property deeds and legal documents to understand boundaries

    • Use surveying equipment like total stations or GPS to measure and mark boundaries accurately

    • Consider any existing structures or obstacles on the site that may affect the survey layout

  • Answered by AI
  • Q5. Setting out coordinate
  • Ans. 

    Setting out coordinate involves establishing points on the ground based on a specific coordinate system.

    • Use surveying equipment like total stations or GPS to accurately measure and mark points

    • Ensure the coordinate system used is consistent and accurate

    • Verify the points set out match the design or plan specifications

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Land surveyor
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Drawing as built
  • Ans. 

    Structure complete at the time taken as built coordinate

  • Answered by Mohammad Jaleel Ahmed
  • Q2. Site position moment
  • Q3. Topography survey
  • Q4. Lay out survey for site
  • Ans. 

    Laying out a survey for a site involves determining property boundaries and marking them with stakes or flags.

    • Start by reviewing property deeds and legal documents to understand boundaries

    • Use surveying equipment like total stations or GPS to measure and mark boundaries accurately

    • Consider any existing structures or obstacles on the site that may affect the survey layout

  • Answered by AI
  • Q5. Setting out coordinate
  • Ans. 

    Setting out coordinate involves establishing points on the ground based on a specific coordinate system.

    • Use surveying equipment like total stations or GPS to accurately measure and mark points

    • Ensure the coordinate system used is consistent and accurate

    • Verify the points set out match the design or plan specifications

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Land surveyor

I applied via Approached by Company and was interviewed in Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(6 Questions)

  • Q1. How was your goals for your work in future
  • Q2. How would you like your profession in your working process
  • Q3. If we will selected you then what can you do
  • Q4. If I'll give u target daily you will do at the time
  • Q5. How we will selected you in other persons
  • Q6. What's your target in daily for your work

Interview Preparation Tips

Topics to prepare for Patel Infrastructure Surveyor interview:
  • Communication Skills
  • Proffesion
Interview preparation tips for other job seekers - Prepare on you and your profession don't lie anything and missbehave on your works keep it properly and work hard for your goals and dreams

I applied via Approached by Company and was interviewed in Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. They are asking general details about your experience and background
Round 3 - Technical 

(1 Question)

  • Q1. They will give one task for us to justify our experience and skills whether it was suitable for their needs.

Interview Preparation Tips

Interview preparation tips for other job seekers - Give positive and straight forward reply to all their questions
Complete the task as per the interviewer requirement
Don't feel shy or nervous
Friendly environment for the job seekers

I applied via Naukri.com and was interviewed in Feb 2021. There were 5 interview rounds.

Interview Questionnaire 

11 Questions

  • Q1. How can we find unit weight of reinforcement bar?
  • Ans. 

    The unit weight of reinforcement bar can be found by calculating the weight per unit length.

    • The unit weight of reinforcement bar is calculated by dividing the weight of the bar by its length.

    • The weight of the bar can be determined by multiplying the cross-sectional area of the bar by the density of the material.

    • The length of the bar is measured in meters or feet, depending on the unit system used.

    • The density of the mat...

  • Answered by AI
  • Q2. Unit weights of various building materials?
  • Ans. 

    Unit weights of building materials are important for quantity surveying.

    • Unit weight of concrete is around 2400 kg/m³

    • Unit weight of brick is around 1920 kg/m³

    • Unit weight of steel is around 7850 kg/m³

    • Unit weight of timber is around 500 kg/m³

    • Unit weight of glass is around 2500 kg/m³

  • Answered by AI
  • Q3. Manpower productivity?
  • Ans. 

    Manpower productivity refers to the efficiency of workers in completing tasks within a given timeframe.

    • It is important to measure and track productivity to identify areas for improvement.

    • Factors that can affect productivity include training, equipment, and work environment.

    • Productivity can be improved through better planning, organization, and communication.

    • Examples of productivity measures include output per worker, t...

  • Answered by AI
  • Q4. What is procedure for billing?
  • Ans. 

    The procedure for billing involves preparing an invoice based on the work completed and submitting it to the client for payment.

    • Review the contract to ensure all work completed is billable

    • Prepare an invoice detailing the work completed and the corresponding costs

    • Submit the invoice to the client for payment within the agreed upon timeframe

    • Follow up with the client to ensure payment is received on time

  • Answered by AI
  • Q5. Do you know how to calculate bar bending schedule?
  • Ans. 

    Yes, bar bending schedule is calculated by determining the number, length, and shape of bars required for a reinforced concrete structure.

    • Calculate the total length of bars required for each size and type

    • Determine the number of bars required for each size and type

    • Calculate the shape and bending details of each bar

    • Prepare a detailed schedule of all the bars required for the structure

    • Ensure compliance with design and con

  • Answered by AI
  • Q6. Why did you left last company?
  • Q7. What is your eligibility to select for this position of job to this company?
  • Q8. What do you know about this company?
  • Q9. Which location do you want to do job?
  • Q10. Please tell me about your self?
  • Q11. Asked about measurements of various items,etc.......

Interview Preparation Tips

Interview preparation tips for other job seekers - First believe your self and be confident to answer all questions. Speak freely without any tension.

Onshore Construction Interview FAQs

How many rounds are there in Onshore Construction Land Surveyor interview?
Onshore Construction interview process usually has 2 rounds. The most common rounds in the Onshore Construction interview process are Resume Shortlist and One-on-one Round.
What are the top questions asked in Onshore Construction Land Surveyor interview?

Some of the top questions asked at the Onshore Construction Land Surveyor interview -

  1. Do you know mechanical survey w...read more
  2. How to check centre line of foundati...read more
  3. Which type of instruments us...read more

Tell us how to improve this page.

Onshore Construction Land Surveyor Salary
based on 4 salaries
₹5.2 L/yr - ₹14 L/yr
101% more than the average Land Surveyor Salary in India
View more details

Onshore Construction Land Surveyor Reviews and Ratings

based on 1 review

3.0/5

Rating in categories

3.0

Skill development

3.0

Work-Life balance

3.0

Salary & Benefits

3.0

Job Security

3.0

Company culture

3.0

Promotions/Appraisal

3.0

Work Satisfaction

Explore 1 Review and Rating
Piping Engineer
131 salaries
unlock blur

₹2.2 L/yr - ₹10 L/yr

QA QC Engineer
61 salaries
unlock blur

₹3 L/yr - ₹8.1 L/yr

Planning Engineer
56 salaries
unlock blur

₹2.5 L/yr - ₹11.4 L/yr

Safety Officer
50 salaries
unlock blur

₹2.8 L/yr - ₹5.3 L/yr

Mechanical Engineer
34 salaries
unlock blur

₹7.3 L/yr - ₹14.5 L/yr

Explore more salaries
Compare Onshore Construction with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.3
Compare

Shapoorji Pallonji Group

4.2
Compare

Punj Lloyd

4.4
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview