Filter interviews by
I design, develop, and test electrical systems for various applications.
Designing electrical systems for buildings or machinery
Developing new electrical components or products
Testing electrical systems for safety and efficiency
Troubleshooting and repairing electrical issues
Collaborating with other engineers and technicians
I was interviewed before Feb 2024.
Work at height refers to any work that is performed above ground level where a person could fall and injure themselves.
Work at height includes tasks such as working on roofs, scaffolding, ladders, or elevated platforms.
Employers must assess the risks and implement safety measures to prevent falls, such as providing fall protection equipment.
Workers should be trained on how to work safely at height and use appropriate s...
ELCB stands for Earth Leakage Circuit Breaker. It is a safety device used to prevent electric shock and fire hazards.
ELCB detects earth faults and disconnects the power supply to prevent electric shock.
It works by measuring the imbalance of current between the live and neutral wires.
There are two types of ELCBs - voltage-operated ELCB and current-operated ELCB.
ELCBs are commonly used in residential and commercial build
There are various types of cranes used in construction such as tower cranes, mobile cranes, crawler cranes, and overhead cranes.
Tower cranes are commonly used for tall buildings and construction sites with limited space.
Mobile cranes are versatile and can be easily transported to different locations.
Crawler cranes are used for heavy lifting and can move on tracks.
Overhead cranes are typically used in industrial setting
Offshore Infrastructures interview questions for popular designations
I applied via Referral and was interviewed in Oct 2023. There were 2 interview rounds.
Get interview-ready with Top Offshore Infrastructures Interview Questions
I applied via AmbitionBox and was interviewed in May 2024. There was 1 interview round.
The phase to phase clearance in a 33kV line is typically around 1 meter.
Phase to phase clearance in a 33kV line is usually around 1 meter to ensure safety and prevent electrical arcing.
The clearance distance may vary based on specific regulations and standards in different regions.
Proper clearance is important to prevent short circuits and ensure reliable power transmission.
Clearance distances are determined based on f...
The phase to phase clearance in an 11kV line is typically around 1 meter.
Phase to phase clearance in 11kV line is usually around 1 meter to ensure safety and prevent electrical arcing.
The clearance distance may vary based on specific regulations and standards in different regions.
Proper clearance is essential to prevent short circuits and ensure the safety of personnel working near the line.
I applied via Approached by Company and was interviewed in May 2023. There were 4 interview rounds.
The kiln process involves heating materials to high temperatures in a controlled environment to achieve specific physical or chemical changes.
Materials are loaded into the kiln, such as ceramics, cement, or metals.
The kiln is heated to the desired temperature using burners or electric elements.
The materials undergo physical and chemical changes, such as drying, sintering, or calcination.
The kiln is cooled down graduall...
I applied via Referral and was interviewed in Feb 2023. There were 2 interview rounds.
I applied via Referral and was interviewed before Aug 2022. There was 1 interview round.
I applied via Walk-in and was interviewed in Sep 2022. There were 2 interview rounds.
Top trending discussions
The duration of Offshore Infrastructures interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 35 interviews
Interview experience
based on 442 reviews
Rating in categories
Mechanical Engineer
124
salaries
| ₹1.9 L/yr - ₹7.2 L/yr |
Safety Officer
71
salaries
| ₹2.3 L/yr - ₹7.1 L/yr |
Piping Engineer
64
salaries
| ₹2 L/yr - ₹7 L/yr |
Senior Engineer
55
salaries
| ₹3 L/yr - ₹10 L/yr |
QA QC Engineer
55
salaries
| ₹2 L/yr - ₹8.3 L/yr |
Larsen & Toubro Limited
Essar Group
Adani Group
GMR Group