Q1. How to erection of transformer .explain ...
Erection of transformer involves several steps including site preparation, foundation construction, assembly of transformer components, and testing.
Site preparation involves clearing the area and ensuring proper drainage
Foundation construction involves excavation, pouring concrete, and curing
Assembly of transformer components includes positioning the core, winding the coils, and connecting the bushings
Testing involves checking the insulation resistance, oil level, and other p...read more
Q2. How much phase to phase clearance in 33kv line ?
The phase to phase clearance in a 33kV line is typically around 1 meter.
Phase to phase clearance in a 33kV line is usually around 1 meter to ensure safety and prevent electrical arcing.
The clearance distance may vary based on specific regulations and standards in different regions.
Proper clearance is important to prevent short circuits and ensure reliable power transmission.
Clearance distances are determined based on factors such as voltage level, environmental conditions, an...read more
Q3. How much phase to phase clearance in 11kv line ?
The phase to phase clearance in an 11kV line is typically around 1 meter.
Phase to phase clearance in 11kV line is usually around 1 meter to ensure safety and prevent electrical arcing.
The clearance distance may vary based on specific regulations and standards in different regions.
Proper clearance is essential to prevent short circuits and ensure the safety of personnel working near the line.
Q4. How to erection of LV and HV panel
LV and HV panel erection involves proper planning, installation, and testing.
Plan the layout and location of the panels
Install the panels according to manufacturer's instructions
Ensure proper grounding and wiring
Test the panels for functionality and safety
Follow all safety protocols and regulations
Examples: Schneider Electric LV Panel, ABB HV Panel
Q5. Method of earthing? And type of tray And testing of equipment of panel etc.
Earthing method involves connecting electrical equipment to the earth to prevent electric shock and damage to equipment.
Earthing can be done through a rod, plate, or strip depending on the soil resistivity
Tray types include ladder, perforated, solid-bottom, and wire mesh
Testing of equipment involves checking insulation resistance, continuity, and polarity
Panel testing includes checking for loose connections, proper labeling, and correct breaker sizing
Q6. What is your electrical work?
I design, develop, and test electrical systems for various applications.
Designing electrical systems for buildings or machinery
Developing new electrical components or products
Testing electrical systems for safety and efficiency
Troubleshooting and repairing electrical issues
Collaborating with other engineers and technicians
Q7. can you cable laying
Yes, I have experience in cable laying.
I have experience in laying power and communication cables
I am familiar with cable routing and cable tray installation
I have worked on projects involving underground cable laying
I am knowledgeable in cable termination and splicing techniques
Q8. What is process of cabling .etc
Cabling process involves planning, routing, pulling, terminating and testing of cables.
Plan the cable routing based on the requirements and specifications
Pull the cables through the conduits or trays
Terminate the cables at both ends using connectors or terminals
Test the cables for continuity, insulation resistance and other parameters
Label the cables for easy identification and maintenance
Ensure compliance with safety regulations and standards
Q9. Tell me the process of kiln?
The kiln process involves heating materials to high temperatures in a controlled environment to achieve specific physical or chemical changes.
Materials are loaded into the kiln, such as ceramics, cement, or metals.
The kiln is heated to the desired temperature using burners or electric elements.
The materials undergo physical and chemical changes, such as drying, sintering, or calcination.
The kiln is cooled down gradually to prevent thermal shock to the materials.
The processed ...read more
Q10. What is work at height?
Work at height refers to any work that is performed above ground level where a person could fall and injure themselves.
Work at height includes tasks such as working on roofs, scaffolding, ladders, or elevated platforms.
Employers must assess the risks and implement safety measures to prevent falls, such as providing fall protection equipment.
Workers should be trained on how to work safely at height and use appropriate safety equipment.
Regular inspections of equipment and work ...read more
Q11. Can you do multiple task
Yes, I am able to handle multiple tasks efficiently and prioritize effectively.
I have experience juggling multiple projects simultaneously
I am skilled at time management and can prioritize tasks based on deadlines and importance
I am able to adapt quickly to changing priorities and work well under pressure
Q12. how many Type of scaffold
There are several types of scaffolds used in construction.
Supported scaffold
Suspended scaffold
Rolling scaffold
Aerial lift scaffold
Mobile scaffold
Cantilever scaffold
Single pole scaffold
Double pole scaffold
Trestle scaffold
Patented scaffold
Q13. What is ELCB ?
ELCB stands for Earth Leakage Circuit Breaker. It is a safety device used to prevent electric shock and fire hazards.
ELCB detects earth faults and disconnects the power supply to prevent electric shock.
It works by measuring the imbalance of current between the live and neutral wires.
There are two types of ELCBs - voltage-operated ELCB and current-operated ELCB.
ELCBs are commonly used in residential and commercial buildings to ensure electrical safety.
Q14. Process of NDT Clearance
NDT clearance process involves inspection and testing of materials and equipment to ensure compliance with standards.
NDT methods include visual inspection, radiography, ultrasonic testing, magnetic particle testing, and dye penetrant testing.
Inspection and testing is carried out by certified NDT personnel.
Clearance is given based on the results of the inspection and testing.
Documentation of the NDT clearance process is important for quality control and assurance.
Q15. EXPLAIN THE OSHA 29CFR 1926,SUB PART -L
OSHA 29CFR 1926, Sub Part -L outlines the requirements for scaffolding in construction work.
Subpart L covers all aspects of scaffolding, including design, construction, and use.
It requires that scaffolds be able to support their own weight and at least four times the maximum intended load.
It also mandates that scaffolds be inspected by a competent person before each use.
Training is required for all employees who work on or around scaffolds.
Examples of scaffolds include suspen...read more
Q16. Type of crane ?
There are various types of cranes used in construction such as tower cranes, mobile cranes, crawler cranes, and overhead cranes.
Tower cranes are commonly used for tall buildings and construction sites with limited space.
Mobile cranes are versatile and can be easily transported to different locations.
Crawler cranes are used for heavy lifting and can move on tracks.
Overhead cranes are typically used in industrial settings for lifting and moving heavy materials.