50 question 60 minutes on os virtualization computer networking Linux shell scripting
I am a system reliability engineer with expertise in virtualization, which is the process of creating a virtual version of a device or resource.
Virtualization allows multiple operating systems to run on a single physical machine.
It helps in optimizing resources, improving scalability, and enhancing security.
Examples include VMware, Hyper-V, and VirtualBox.
Types of virtualization include server virtualization, desktop v
I would start by checking the wifi settings, restarting the router, and testing the connection on other devices.
Check wifi settings on the device to ensure it is connected to the correct network
Restart the router to see if that resolves the issue
Test the wifi connection on other devices to determine if the problem is with the device or the network
Yes, I have experience with virtualization.
I have worked with virtual machines using VMware and VirtualBox.
I have experience with containerization technologies like Docker and Kubernetes.
I have set up virtual networks for testing and development purposes.
I have used virtualization to create isolated environments for different projects.
I am a system reliability engineer with a passion for ensuring the stability and performance of complex systems.
I have a strong background in system architecture and design
I am skilled in identifying potential points of failure and implementing solutions to prevent downtime
I have experience in monitoring system performance and conducting root cause analysis
I am proficient in scripting and automation to streamline proce...
The OSI model is a conceptual framework that standardizes the functions of a telecommunication or computing system into seven layers.
The OSI model stands for Open Systems Interconnection model.
It helps in understanding how different networking protocols work together.
The seven layers are: Physical, Data Link, Network, Transport, Session, Presentation, and Application.
Each layer has specific functions and communicates w...
I applied via Walk-in and was interviewed before Aug 2022. There were 4 interview rounds.
Top trending discussions
I applied via Naukri.com and was interviewed in Sep 2021. There was 1 interview round.
Line balancing is the process of evenly distributing work among different workstations in a production line.
It involves analyzing the production process to identify bottlenecks and inefficiencies
The goal is to optimize the use of resources and minimize idle time
It can be achieved through techniques like workload smoothing, task interleaving, and job rotation
Example: In an assembly line, line balancing can ensure that e...
Manufacturing Execution System (MES) is a software system that manages and monitors production processes on the factory floor.
MES provides real-time data on production processes, inventory levels, and quality control.
MES integrates with other systems such as Enterprise Resource Planning (ERP) and Product Lifecycle Management (PLM).
MES helps to optimize production processes, reduce waste, and improve efficiency.
Examples...
I was interviewed before Feb 2024.
Seeking new challenges and opportunities for growth
Desire for career advancement
Looking for a more challenging role
Seeking opportunities to learn new skills
Company culture or values not aligned with personal values
Relocation for personal reasons
posted on 21 Jul 2024
posted on 10 Sep 2023
I was interviewed in Apr 2024.
I was interviewed in Jul 2024.
As a Senior Engineer in the plant, my responsibilities include overseeing operations, managing projects, ensuring compliance with regulations, and leading a team of engineers.
Overseeing day-to-day operations in the plant
Managing projects related to plant upgrades or expansions
Ensuring compliance with safety and environmental regulations
Leading and mentoring a team of engineers
Troubleshooting technical issues and implem
Tan delta testing is conducted in power transformers to assess the insulation condition and detect any potential faults.
Tan delta testing helps in evaluating the insulation quality of power transformers.
It can detect any potential issues such as moisture, contamination, or aging of insulation materials.
By measuring the tan delta value, engineers can assess the dielectric losses in the transformer.
Regular tan delta test...
A vector group is a method used to represent the phase relationship between the primary and secondary windings of a transformer.
Vector group indicates the connection of transformer windings and the phase shift between them.
It is represented by a combination of letters and numbers, such as Yd1, Dyn11, etc.
Different vector groups have different phase relationships, affecting the transformer's performance and operation.
Ve...
Considerations when erecting an IDT (Inverter duty Transformer)
Ensure the transformer is designed for inverter duty applications
Properly size the transformer based on the inverter's output power
Consider the harmonic content of the inverter's output when selecting the transformer
Provide adequate ventilation and cooling for the transformer to handle the increased heat generated by the inverter
Ensure proper grounding and ...
Star-delta connection is a method used in power transformers to reduce starting current and improve efficiency.
Star-delta connection involves connecting the primary windings of the transformer in a star configuration during starting, and then switching to a delta configuration during normal operation.
This method helps in reducing the starting current drawn by the transformer, which is beneficial for the power system.
It...
High-tension (HT) lines use different types of conductors with varying current capacities.
Types of conductors used in HT lines include aluminum, steel, and composite materials
Aluminum conductors are commonly used due to their lightweight and high conductivity
Steel conductors are used for their strength and durability
Composite conductors are a newer technology that offer a balance of strength and conductivity
Current cap...
The distance between poles in 33KV high tension lines is typically around 50-60 meters.
The distance between poles in high tension lines is determined by factors such as terrain, voltage level, and local regulations.
In general, the distance can range from 50 to 60 meters for 33KV high tension lines.
This distance is important to ensure proper support and insulation of the conductors between poles.
The process of laying LT cables involves planning, trenching, laying the cables, jointing, testing, and backfilling.
Plan the route and depth of the trench for laying the cables.
Excavate the trench to the required depth and width.
Lay the cables in the trench, ensuring proper alignment and support.
Joint the cables together using appropriate connectors.
Test the cables for continuity and insulation resistance.
Backfill the ...
The process for attaching modules involves identifying connection points, aligning the modules, securing them in place, and testing for functionality.
Identify connection points on both modules
Align the modules properly to ensure a secure fit
Secure the modules in place using appropriate fasteners or connectors
Test the functionality of the attached modules to ensure proper connection
Seeking new challenges and opportunities for growth in a more innovative environment.
Desire for new challenges and opportunities
Seeking growth and advancement
Looking for a more innovative work environment
I come from a close-knit family of four, including my parents and younger sister.
My parents have always been supportive of my career choices and encouraged me to pursue my passion for engineering.
I have a younger sister who is currently studying computer science at university, following in my footsteps.
We enjoy spending quality time together, whether it's going on family vacations or simply having dinner at home.
based on 3 interviews
Interview experience
based on 20 reviews
Rating in categories
Senior Engineer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Electrical Engineer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Shift Incharge
4
salaries
| ₹0 L/yr - ₹0 L/yr |
GM HR Administrator
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager - HR & Admin
4
salaries
| ₹0 L/yr - ₹0 L/yr |
UTL Solar
Danfoss Power Solutions
LM Wind Power
Senvion