Filter interviews by
I applied via Campus Placement
Topic was Women in power sectors
A thermal plant is a power station that generates electricity by converting heat energy into electrical energy.
Thermal plants use fuel such as coal, natural gas, or oil to heat water and produce steam.
The steam then drives a turbine connected to a generator, which produces electricity.
Examples of thermal plants include coal-fired power plants and gas-fired power plants.
Top trending discussions
I applied via Campus Placement and was interviewed before Mar 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Oct 2020. There were 3 interview rounds.
Overview of S&T system in Railways, differences between PI & EI, types and reasons for failures, RCA analysis
S&T system in Railways includes signaling, telecommunication, and train control systems
PI (Permanent Instrumentation) is used for continuous monitoring of track circuits, while EI (Event Instrumentation) is used for monitoring specific events
Types of failures in S&T gears include broken wires, damaged insulation...
SMART goals are specific, measurable, achievable, relevant, and time-bound.
Specific: Goals should be clear and well-defined.
Measurable: Goals should have a way to track progress and measure success.
Achievable: Goals should be realistic and attainable.
Relevant: Goals should be aligned with overall objectives and relevant to the individual or team.
Time-bound: Goals should have a deadline or timeframe for completion.
Examp...
I applied via Approached by Company and was interviewed before Nov 2022. There were 3 interview rounds.
I have extensive experience in global procurement process, supplier relationship management, end to end procurement, and cross functional collaboration.
Successfully managed global procurement process by identifying cost-saving opportunities and negotiating contracts with suppliers.
Faced challenges in supplier relationship management due to communication barriers, but resolved them by establishing regular meetings and c...
To tackle problems in procurement, it is important to identify root causes, establish clear communication channels, implement efficient processes, and continuously monitor performance.
Identify root causes of procurement problems such as supplier issues, inventory management issues, or process inefficiencies.
Establish clear communication channels with suppliers, stakeholders, and internal teams to ensure transparency an...
Understanding of sourcing goods and services from global markets.
Knowledge of international trade regulations and tariffs
Ability to identify and evaluate global suppliers
Experience in negotiating contracts with overseas vendors
Awareness of currency exchange rates and their impact on procurement costs
We work with a variety of suppliers globally to ensure a diverse and reliable supply chain.
We have partnerships with suppliers in Asia, Europe, and North America.
Our suppliers range from small local businesses to large multinational corporations.
We prioritize suppliers who share our commitment to sustainability and ethical practices.
I applied via Recruitment Consulltant and was interviewed in Sep 2023. There was 1 interview round.
I applied via Job Portal and was interviewed before Nov 2023. There were 2 interview rounds.
I appeared for an interview in Mar 2025, where I was asked the following questions.
Managing manpower shortages requires strategic planning, prioritization, and effective communication to maintain productivity.
Prioritize Tasks: Focus on critical tasks that directly impact production. For example, if a line is short-staffed, prioritize high-demand products.
Cross-Training Employees: Train team members to handle multiple roles, ensuring flexibility. For instance, a machine operator can also assist in qua...
In case of a power cut and DG issues, I would prioritize safety, assess the situation, and communicate effectively with the team.
Ensure safety: Check for any immediate hazards caused by the power cut.
Assess the situation: Determine the extent of the power cut and DG issues.
Communicate: Inform the team about the situation and any necessary actions.
Implement backup plans: Activate any pre-established contingency plans fo...
In case of a fire alarm failure, immediate action is crucial to ensure safety and minimize damage.
Assess the situation: Quickly determine the source and severity of the fire.
Alert others: Use verbal communication or a whistle to warn colleagues in the vicinity.
Activate manual alarms: If available, use manual fire alarms to alert the fire department.
Evacuate: Initiate a safe evacuation of the building, guiding people to...
I appeared for an interview in Sep 2024, where I was asked the following questions.
Ensuring safety at work sites involves identifying hazards, implementing protocols, and promoting a culture of safety among employees.
Conduct regular safety audits to identify potential hazards, such as slippery floors or exposed wiring.
Implement personal protective equipment (PPE) requirements, like hard hats and safety goggles, especially in construction zones.
Provide safety training sessions for employees to educate...
I appeared for an interview before Apr 2024, where I was asked the following questions.
Trip time calculations involve understanding the dynamics of vehicle movement on different road curves.
Centripetal acceleration is crucial for curves: a = v^2/r, where 'v' is velocity and 'r' is radius.
For circular curves, the formula for trip time can be derived from distance = speed × time.
Example: For a vehicle traveling at 60 km/h on a curve with a radius of 100 m, calculate the time to traverse the curve.
Use the f...
Relay coordination software helps ensure the proper functioning of protective relays in electrical systems.
ETAP: Offers advanced relay coordination and system modeling capabilities.
SKM PowerTools: Provides tools for protective device coordination and analysis.
EasyPower: Features relay coordination and fault analysis tools.
PSS®SINCAL: Used for relay coordination in power system analysis.
CDEGS: Focuses on grounding and e...
based on 2 interview experiences
Difficulty level
Duration
based on 8 reviews
Rating in categories
Senior Manager
141
salaries
| ₹17.3 L/yr - ₹56 L/yr |
Deputy General Manager
93
salaries
| ₹19 L/yr - ₹70 L/yr |
Engineer
77
salaries
| ₹3.5 L/yr - ₹8.9 L/yr |
Executive
72
salaries
| ₹7.2 L/yr - ₹15 L/yr |
Manager
70
salaries
| ₹17.9 L/yr - ₹44.5 L/yr |
Adani Group
Tata Power
GE Vernova
Eaton