Filter interviews by
I was interviewed in Dec 2024.
I have a Bachelor's degree in Electrical Engineering and relevant certifications in testing and commissioning.
Bachelor's degree in Electrical Engineering
Certifications in testing and commissioning
Experience in testing and commissioning of electrical systems
Electrical engineering deals with the generation, transmission, and distribution of electrical power, while electronics engineering focuses on electronic devices and circuits.
Electrical engineering primarily deals with large-scale power generation, transmission, and distribution systems.
Electronics engineering focuses on small-scale electronic devices, circuits, and systems.
Electrical engineering involves working with ...
More tech is really frustrated
I applied via Referral and was interviewed in Jul 2022. There were 2 interview rounds.
Top trending discussions
posted on 13 May 2018
I was interviewed before May 2017.
posted on 4 Apr 2021
Piles are used in construction to transfer loads from a structure to a stronger layer of soil or rock below the surface.
Types of piles include driven piles, bored piles, and screw piles.
Piles are provided to support structures on weak or compressible soil, to resist uplift forces, or to provide lateral support.
The diameter of a pile is determined based on the load it needs to support and the soil conditions.
LVUP (Large...
The percentage of steel in a pile varies depending on the type and design of the pile.
The percentage of steel in a pile can range from 0% to over 90%.
The type of pile (e.g. steel, concrete, timber) and its design (e.g. diameter, length, wall thickness) determine the percentage of steel.
Steel piles typically have a higher percentage of steel than other types of piles.
The percentage of steel in a pile can also affect its
Pile built-up above cut off level as per IS code
IS code specifies the maximum allowable pile length above cut off level
Pile length above cut off level should not exceed 3 times the pile diameter
Built-up pile above cut off level can cause structural instability and failure
Vertical tolerance for piles as per IS code
As per IS 2911-1:2010, the vertical tolerance for piles is +/- 25mm
This tolerance is applicable for both driven and cast-in-situ piles
The tolerance is measured at the top of the pile and at intervals of 3m along the length
If the deviation exceeds the tolerance limit, the pile may need to be rejected or remedial measures taken
Pile concrete consumption tolerance depends on various factors.
Pile diameter and length
Concrete mix design
Placement method
Quality control measures
Environmental conditions
Tolerance typically ranges from 5-10% of estimated consumption
Regular monitoring and adjustment of concrete consumption is necessary
Unit weight of steel is 7850 kg/m³
The unit weight of steel is the weight of a specific volume of steel
It is measured in kilograms per cubic meter (kg/m³)
The unit weight of steel is 7850 kg/m³
This value may vary slightly depending on the composition and manufacturing process of the steel
I applied via Recruitment Consultant and was interviewed in Oct 2020. There were 4 interview rounds.
posted on 4 Aug 2020
based on 3 interviews
Interview experience
based on 17 reviews
Rating in categories
Electrical Engineer
7
salaries
| ₹1.8 L/yr - ₹3 L/yr |
Mechanical Engineer
6
salaries
| ₹1.8 L/yr - ₹2.5 L/yr |
Operation & Maintenance Engineer
6
salaries
| ₹1.7 L/yr - ₹2.3 L/yr |
Testing & Commissioning Engineer
6
salaries
| ₹1.4 L/yr - ₹3 L/yr |
Senior Engineer
4
salaries
| ₹3.1 L/yr - ₹3.6 L/yr |
TCE
Mecon
L&T Technology Services
AECOM