Upload Button Icon Add office photos

Filter interviews by

N G Gadhiya Infrastructure Civil Engineer Interview Questions and Answers

Updated 30 Oct 2022

N G Gadhiya Infrastructure Civil Engineer Interview Experiences

1 interview found

I applied via Referral and was interviewed before Oct 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Basic surveying
Basic Bbs knowledge
Basic BOQ model billing
S o r
Laran quantity survey site on site practical
Basic drawing reading
MS Excel basic
PWD norms and CPWD Is 1200
Thermal rules

Round 3 - Technical 

(2 Questions)

  • Q1. Theoretical unit ,material
  • Q2. Unit of weight construction materials
  • Ans. 

    The unit of weight for construction materials is typically measured in pounds or tons.

    • Common units of weight for construction materials include pounds (lb) and tons (t).

    • For example, a bag of cement may weigh 50 lb, while a truckload of gravel may weigh 20 t.

    • It is important for civil engineers to accurately calculate the weight of materials in order to ensure structural integrity and safety.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good morning sir my name is luv balniya
Finally student civil 2022
Sar meri padhaai abhi complete hui hai aur main ab field mein jana chahta hun aur mujhe practical knowledge leni hai
Aur sar maine abhi kam Kiya hai JDA office mein Jahan per mujhe roll Diya gaya hai tha supervisor aur project bhi diya gaya tha building planning ke upar teen manth ka duration tha aur Maine unko complete Kiya work project
Ab sar mujhe field mein jana hai
To respect Li ki sar aap mujhe field side ki knowledge dena ki kripya Karen thank you sir ji 🙏🙏🙏

Interview questions from similar companies

I applied via Walk-in and was interviewed in Jun 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About your self
  • Q2. My experience as an engineer
  • Q3. How to execute work on site
  • Ans. 

    Execution of work on site involves planning, coordination, and management of resources to ensure timely completion of the project.

    • Develop a detailed project plan and schedule

    • Allocate resources effectively and efficiently

    • Ensure safety measures are in place

    • Regularly monitor and report progress

    • Address any issues or challenges that arise

    • Maintain good communication with stakeholders

    • Ensure quality control and adherence to sp...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - BE polite. And humble and be in confidence
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
-

I applied via Walk-in and was interviewed in Mar 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Qty of cement in M25 grade concrete
  • Ans. 

    The quantity of cement in M25 grade concrete is 350 kg/m³.

    • M25 grade concrete has a mix proportion of 1:1:2 (cement:sand:aggregate).

    • The total volume of concrete is taken as 1 m³.

    • Therefore, the quantity of cement required for 1 m³ of M25 grade concrete is 350 kg.

    • This is calculated by multiplying the volume of concrete by the proportion of cement in the mix.

  • Answered by AI
  • Q2. Exact weight of different dia of steel
  • Ans. 

    The weight of steel varies with its diameter.

    • The weight of steel can be calculated using the formula: weight = volume x density

    • The density of steel is approximately 7850 kg/m³

    • The volume of steel can be calculated using the formula: volume = pi x (diameter/2)² x length

    • For example, a 10mm diameter steel rod with a length of 1 meter would weigh approximately 0.393 kg

  • Answered by AI
  • Q3. Process of waterproofing
  • Ans. 

    Waterproofing is the process of making a structure or object resistant to water penetration.

    • Identify the areas that need waterproofing such as roofs, walls, and foundations.

    • Clean and prepare the surface to be waterproofed.

    • Apply a waterproofing membrane or coating such as bituminous, acrylic, or polyurethane.

    • Ensure proper drainage and slope to prevent water accumulation.

    • Test the waterproofing system for leaks and make n...

  • Answered by AI
  • Q4. Conversion of brass to Cum
  • Ans. 

    Conversion of brass to Cum

    • Brass is an alloy of copper and zinc, while Cum is not a known substance

    • It is not possible to convert brass to Cum

    • Perhaps the question is referring to a different substance or material

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Worst management. My interview was scheduled on Friday but on Wednesday they email me to come on Thursday. When I reached the mentioned location in email , i was given another location which was 2-3 km away. However when I reached the venue, interview time was 11 Am but it started at 1. Pm . After interview Hr called and told me that you are selected for so and so position but there will be no hike on your current salary, and you have to come for second round . After 15 days they replied me that you are not selected.

Interview Questionnaire 

1 Question

  • Q1. Technical Civil Execution engineering with finishing RCC experience
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Aug 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Technical questions
Round 3 - Technical 

(1 Question)

  • Q1. Technical questions
Round 4 - HR 

(1 Question)

  • Q1. Salary discussion
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

Written paper as per site and codes

Round 2 - Group Discussion 

It’s about Quality and execution with VP and audit team

Round 3 - HR 

(2 Questions)

  • Q1. Salary discussion
  • Q2. Joining procedures and company policy

I applied via Walk-in and was interviewed before Aug 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Instruments code in use lab
  • Ans. 

    The instruments code in use in the lab refers to the unique identification numbers assigned to the equipment used for testing and analysis.

    • Instruments code helps in tracking and identifying specific equipment.

    • It ensures traceability and accountability in the lab.

    • Examples of instruments code include serial numbers, barcodes, or RFID tags.

  • Answered by AI
  • Q2. Testing and specifications codes

Interview Preparation Tips

Interview preparation tips for other job seekers - Good experience in life jobs interview in civil construction
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Dec 2023. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. Discussion about College time studies
  • Q2. Hobbies and Managing

Interview Preparation Tips

Topics to prepare for Maxinfra QA QC Engineer interview:
  • Construction knowledge
  • Concrete technology
  • IS CODES
Interview experience
1
Bad
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Mar 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Aptitude Test 

QA QC related questions

Round 3 - HR 

(1 Question)

  • Q1. 1.Tell me about your self. 2.why join Ashar 3.current roles and responsibilities 4.current CTC 5.expected CTC 6.why r u leaving your current organisation 7.How to judge your expected CTC amount can u brief
Round 4 - Technical 

(1 Question)

  • Q1. Starts with basic technical concepts with deep and deep (How and why) then discussion with current work experience in detail with difficulty faced on (How and Why)...last que Why we should select you
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Company Website and was interviewed in Jan 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - HR 

(6 Questions)

  • Q1. Mivan setting and drawing
  • Q2. Slab checking slab cycle
  • Q3. Interior change in drawing
  • Ans. 

    Interior change in drawing refers to modifying the internal elements of a design or blueprint.

    • Identify the specific elements that need to be changed

    • Consider the impact of the changes on the overall design

    • Update the drawing with the new interior layout

    • Ensure that the changes align with the project requirements

  • Answered by AI
  • Q4. Bathroom waterproofing and plumbing
  • Q5. Estimation and costing
  • Q6. Bar bending schedule

Interview Preparation Tips

Interview preparation tips for other job seekers - Not view YouTube video for interview because HR also known freshers are preparing YouTube video

Prepare basics information

N G Gadhiya Infrastructure Interview FAQs

How many rounds are there in N G Gadhiya Infrastructure Civil Engineer interview?
N G Gadhiya Infrastructure interview process usually has 3 rounds. The most common rounds in the N G Gadhiya Infrastructure interview process are Resume Shortlist, Aptitude Test and Technical.
What are the top questions asked in N G Gadhiya Infrastructure Civil Engineer interview?

Some of the top questions asked at the N G Gadhiya Infrastructure Civil Engineer interview -

  1. Unit of weight construction materi...read more
  2. Theoretical unit ,mater...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Pittie Group Interview Questions
2.6
 • 17 Interviews
Ambience Group Interview Questions
3.4
 • 16 Interviews
91springboard Interview Questions
3.7
 • 11 Interviews
Maxinfra Interview Questions
4.2
 • 11 Interviews
Reliable Spaces Interview Questions
2.8
 • 10 Interviews
Ashar group Interview Questions
3.5
 • 9 Interviews
View all
N G Gadhiya Infrastructure Civil Engineer Salary
based on 7 salaries
₹2.4 L/yr - ₹6 L/yr
31% less than the average Civil Engineer Salary in India
View more details

N G Gadhiya Infrastructure Civil Engineer Reviews and Ratings

based on 3 reviews

2.7/5

Rating in categories

2.5

Skill development

2.3

Work-life balance

2.3

Salary

2.3

Job security

2.5

Company culture

2.1

Promotions

2.3

Work satisfaction

Explore 3 Reviews and Ratings
Civil Site Engineer
10 salaries
unlock blur

₹2 L/yr - ₹4.2 L/yr

Safety Officer
8 salaries
unlock blur

₹2.2 L/yr - ₹4.8 L/yr

Civil Engineer
7 salaries
unlock blur

₹2.4 L/yr - ₹6 L/yr

Project Manager
6 salaries
unlock blur

₹7.5 L/yr - ₹14 L/yr

Planning & Billing Engineer
6 salaries
unlock blur

₹4.6 L/yr - ₹7.6 L/yr

Explore more salaries
Compare N G Gadhiya Infrastructure with

Signature Global

4.0
Compare

Pittie Group

2.6
Compare

Maxinfra

4.2
Compare

Vensa Infrastructure

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview