Filter interviews by
I applied via Referral and was interviewed before Oct 2021. There were 3 interview rounds.
Basic surveying
Basic Bbs knowledge
Basic BOQ model billing
S o r
Laran quantity survey site on site practical
Basic drawing reading
MS Excel basic
PWD norms and CPWD Is 1200
Thermal rules
The unit of weight for construction materials is typically measured in pounds or tons.
Common units of weight for construction materials include pounds (lb) and tons (t).
For example, a bag of cement may weigh 50 lb, while a truckload of gravel may weigh 20 t.
It is important for civil engineers to accurately calculate the weight of materials in order to ensure structural integrity and safety.
I applied via Walk-in and was interviewed in Jun 2021. There was 1 interview round.
Execution of work on site involves planning, coordination, and management of resources to ensure timely completion of the project.
Develop a detailed project plan and schedule
Allocate resources effectively and efficiently
Ensure safety measures are in place
Regularly monitor and report progress
Address any issues or challenges that arise
Maintain good communication with stakeholders
Ensure quality control and adherence to sp...
I applied via Walk-in and was interviewed in Mar 2023. There were 2 interview rounds.
The quantity of cement in M25 grade concrete is 350 kg/m³.
M25 grade concrete has a mix proportion of 1:1:2 (cement:sand:aggregate).
The total volume of concrete is taken as 1 m³.
Therefore, the quantity of cement required for 1 m³ of M25 grade concrete is 350 kg.
This is calculated by multiplying the volume of concrete by the proportion of cement in the mix.
The weight of steel varies with its diameter.
The weight of steel can be calculated using the formula: weight = volume x density
The density of steel is approximately 7850 kg/m³
The volume of steel can be calculated using the formula: volume = pi x (diameter/2)² x length
For example, a 10mm diameter steel rod with a length of 1 meter would weigh approximately 0.393 kg
Waterproofing is the process of making a structure or object resistant to water penetration.
Identify the areas that need waterproofing such as roofs, walls, and foundations.
Clean and prepare the surface to be waterproofed.
Apply a waterproofing membrane or coating such as bituminous, acrylic, or polyurethane.
Ensure proper drainage and slope to prevent water accumulation.
Test the waterproofing system for leaks and make n...
Conversion of brass to Cum
Brass is an alloy of copper and zinc, while Cum is not a known substance
It is not possible to convert brass to Cum
Perhaps the question is referring to a different substance or material
I applied via Approached by Company and was interviewed before Aug 2022. There were 4 interview rounds.
posted on 6 Feb 2024
I applied via Naukri.com and was interviewed in Jan 2024. There were 3 interview rounds.
Written paper as per site and codes
It’s about Quality and execution with VP and audit team
I applied via Walk-in and was interviewed before Aug 2021. There were 2 interview rounds.
The instruments code in use in the lab refers to the unique identification numbers assigned to the equipment used for testing and analysis.
Instruments code helps in tracking and identifying specific equipment.
It ensures traceability and accountability in the lab.
Examples of instruments code include serial numbers, barcodes, or RFID tags.
I applied via Referral and was interviewed before Dec 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed in Mar 2023. There were 4 interview rounds.
QA QC related questions
I applied via Company Website and was interviewed in Jan 2023. There were 2 interview rounds.
Interior change in drawing refers to modifying the internal elements of a design or blueprint.
Identify the specific elements that need to be changed
Consider the impact of the changes on the overall design
Update the drawing with the new interior layout
Ensure that the changes align with the project requirements
based on 3 reviews
Rating in categories
Civil Site Engineer
10
salaries
| ₹2 L/yr - ₹4.2 L/yr |
Safety Officer
8
salaries
| ₹2.2 L/yr - ₹4.8 L/yr |
Civil Engineer
7
salaries
| ₹2.4 L/yr - ₹6 L/yr |
Project Manager
6
salaries
| ₹7.5 L/yr - ₹14 L/yr |
Planning & Billing Engineer
6
salaries
| ₹4.6 L/yr - ₹7.6 L/yr |
Signature Global
Pittie Group
Maxinfra
Vensa Infrastructure