Filter interviews by
I applied via Company Website and was interviewed in Nov 2024. There was 1 interview round.
To grow your career and transition to another company, focus on networking, gaining new skills, updating your resume, and preparing for interviews.
Network with professionals in your industry to learn about job opportunities
Attend industry events, conferences, and workshops to expand your knowledge and skills
Update your resume with your latest projects, achievements, and certifications
Practice for interviews by research...
I applied via Recruitment Consulltant and was interviewed in Nov 2024. There was 1 interview round.
I applied via Company Website and was interviewed in Apr 2024. There was 1 interview round.
Navayuga Engineering Company interview questions for popular designations
The procedure for PSC girders casting involves preparing formwork, placing reinforcement, pouring concrete, curing, and demolding.
Prepare formwork according to design specifications
Place reinforcement bars as per structural drawings
Pour concrete mix into the formwork
Ensure proper vibration to remove air bubbles
Cure the concrete for specified duration
Demold the PSC girder after sufficient strength is achieved
Piling is a procedure used in construction to create a deep foundation by driving or drilling piles into the ground.
Piling is used to transfer the load of a structure to deeper, more stable soil or rock layers.
The procedure for piling involves several steps such as site investigation, pile design, installation, and testing.
Site investigation includes soil testing to determine the type and properties of the soil.
Pile de...
Piling is a construction technique used to strengthen the foundation of a structure by driving piles into the ground.
Piling is a method of deep foundation used to transfer the load of a structure to deeper, more stable soil or rock layers.
Piles are long, slender columns made of materials like concrete, steel, or timber.
They are driven into the ground using specialized equipment such as pile drivers or hydraulic hammers...
PSC girders are pre-stressed concrete girders used in construction projects.
PSC stands for Pre-Stressed Concrete.
PSC girders are structural elements used to support loads in bridges, buildings, and other infrastructure projects.
They are made by placing high-strength steel strands or bars under tension before pouring concrete around them.
The pre-stressing of the steel helps to counteract the tensile forces that the gird...
posted on 21 Nov 2023
I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Sep 2023. There was 1 interview round.
I was interviewed before Jan 2024.
Managing a site involves coordinating resources, ensuring safety, monitoring progress, and communicating effectively.
Coordinate with project team and subcontractors
Ensure compliance with safety regulations
Monitor progress and adjust schedule as needed
Communicate effectively with stakeholders
Maintain accurate records and documentation
Top trending discussions
Some of the top questions asked at the Navayuga Engineering Company interview for experienced candidates -
The duration of Navayuga Engineering Company interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 13 interviews
Interview experience
based on 658 reviews
Rating in categories
Kavali
6-10 Yrs
Not Disclosed
Site Engineer
129
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
112
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
95
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
59
salaries
| ₹0 L/yr - ₹0 L/yr |
Mechanical Engineer
45
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
Hindustan Construction Company
GAMMON INDIA