Upload Button Icon Add office photos

Filter interviews by

Navayuga Engineering Company Deputy Structure Project Manager Interview Questions, Process, and Tips

Updated 14 Nov 2023

Navayuga Engineering Company Deputy Structure Project Manager Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is the procedure for PSC girders cating?
  • Ans. 

    The procedure for PSC girders casting involves preparing formwork, placing reinforcement, pouring concrete, curing, and demolding.

    • Prepare formwork according to design specifications

    • Place reinforcement bars as per structural drawings

    • Pour concrete mix into the formwork

    • Ensure proper vibration to remove air bubbles

    • Cure the concrete for specified duration

    • Demold the PSC girder after sufficient strength is achieved

  • Answered by AI
  • Q2. What is the procedure for piling?
  • Ans. 

    Piling is a procedure used in construction to create a deep foundation by driving or drilling piles into the ground.

    • Piling is used to transfer the load of a structure to deeper, more stable soil or rock layers.

    • The procedure for piling involves several steps such as site investigation, pile design, installation, and testing.

    • Site investigation includes soil testing to determine the type and properties of the soil.

    • Pile de...

  • Answered by AI
Round 3 - Technical 

(2 Questions)

  • Q1. What is the Piling
  • Ans. 

    Piling is a construction technique used to strengthen the foundation of a structure by driving piles into the ground.

    • Piling is a method of deep foundation used to transfer the load of a structure to deeper, more stable soil or rock layers.

    • Piles are long, slender columns made of materials like concrete, steel, or timber.

    • They are driven into the ground using specialized equipment such as pile drivers or hydraulic hammers...

  • Answered by AI
  • Q2. What is psc girders
  • Ans. 

    PSC girders are pre-stressed concrete girders used in construction projects.

    • PSC stands for Pre-Stressed Concrete.

    • PSC girders are structural elements used to support loads in bridges, buildings, and other infrastructure projects.

    • They are made by placing high-strength steel strands or bars under tension before pouring concrete around them.

    • The pre-stressing of the steel helps to counteract the tensile forces that the gird...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good management

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Types of lod and its stages
  • Ans. 

    Types of LOD (Level of Development) include LOD 100, LOD 200, LOD 300, LOD 400, and LOD 500.

    • LOD 100: Conceptual design with basic geometric shapes.

    • LOD 200: Design development with more detailed elements and approximate quantities.

    • LOD 300: Fully coordinated model with accurate quantities and sizes.

    • LOD 400: Fabrication and assembly details included.

    • LOD 500: As-built model with exact details for maintenance and operations

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good for fresher
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Sep 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Past working experience
  • Ans. 

    I have over 10 years of experience working as a structural engineer in various industries.

    • Worked on designing and analyzing structural components for commercial buildings

    • Managed a team of engineers to ensure projects were completed on time and within budget

    • Collaborated with architects and contractors to address design challenges and modifications

    • Performed site visits and inspections to ensure structural integrity and s

  • Answered by AI
  • Q2. Work related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Where ever you work, work honestly
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Dec 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Probably HR ask about your Job Profile, ask to relocate the place, if you match with all the terms and conditions....they arrange the Virtual interview
Round 3 - Technical 

(2 Questions)

  • Q1. All basic conceptual topic of steel structure design....Base plate design fixed base..... American code study Questions...
  • Q2. Mostly ask about Earthquake load and wind load calculation as per American code.......What is sway non-sway frame....ask about Lateral Torsional buckling.

Interview Preparation Tips

Interview preparation tips for other job seekers - Study about American codes.....wind load and earthquake load calculation.... should have an Idea about structural member alignment it's orientation so to minimise instability of structure

I applied via Walk-in and was interviewed in May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Regarding your project
  • Q2. Explaining the work you have done so far

Interview Preparation Tips

Interview preparation tips for other job seekers - Know your project very well. Work in American code is added benefit.
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. 1. Which parts have maximum bending moment 2. Vertical of open web girder is tension members or compression member 3. What is camber design
  • Ans. 

    The maximum bending moment occurs at the points of maximum deflection in a structural element.

    • Bending moment is the internal moment that causes a structural element to bend.

    • The maximum bending moment typically occurs at the points of maximum deflection in a beam or girder.

    • These points are usually located at the supports or at concentrated loads.

    • The bending moment can be calculated using structural analysis methods such...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident abouts every question

I applied via Naukri.com and was interviewed before Jun 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Ask everything about Codes. Good codal knowledge required

Interview Preparation Tips

Interview preparation tips for other job seekers - Read all important codes before interview.

Navayuga Engineering Company Interview FAQs

How many rounds are there in Navayuga Engineering Company Deputy Structure Project Manager interview?
Navayuga Engineering Company interview process usually has 3 rounds. The most common rounds in the Navayuga Engineering Company interview process are Technical and Resume Shortlist.
What are the top questions asked in Navayuga Engineering Company Deputy Structure Project Manager interview?

Some of the top questions asked at the Navayuga Engineering Company Deputy Structure Project Manager interview -

  1. What is the procedure for PSC girders cati...read more
  2. What is the procedure for pili...read more
  3. What is the Pil...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.3
 • 399 Interviews
GMR Group Interview Questions
4.1
 • 75 Interviews
Tractebel Interview Questions
4.0
 • 40 Interviews
View all
Site Engineer
135 salaries
unlock blur

₹2.2 L/yr - ₹7.2 L/yr

Senior Engineer
115 salaries
unlock blur

₹3.6 L/yr - ₹11 L/yr

Civil Site Engineer
91 salaries
unlock blur

₹2.2 L/yr - ₹6.5 L/yr

Assistant Manager
55 salaries
unlock blur

₹4.7 L/yr - ₹12 L/yr

Mechanical Engineer
43 salaries
unlock blur

₹2 L/yr - ₹7.2 L/yr

Explore more salaries
Compare Navayuga Engineering Company with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.3
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.9
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview