Time to remove formwork varies for different types of structural members.
Time to remove formwork for columns is typically 1-2 days
Time to remove formwork for beams is usually 7 days
Time to remove formwork for slabs can range from 7-28 days depending on the type of concrete used
Time to remove formwork for walls is generally around 24 hours
Different grades of cement refer to the varying strengths and compositions of cement used in construction.
Different grades of cement are classified based on their compressive strength, such as 33 grade, 43 grade, and 53 grade.
The higher the grade number, the higher the compressive strength of the cement.
Each grade of cement is suitable for different types of construction projects, with 53 grade cement being commonly us
I applied via Referral and was interviewed in Jul 2023. There were 2 interview rounds.
I would analyze the reasons for not reaching the targets, adjust my strategies, seek feedback from colleagues, and work harder to meet the goals.
Analyze the reasons for not reaching the targets
Adjust sales strategies based on the analysis
Seek feedback from colleagues or supervisors for insights
Work harder and smarter to meet the sales targets
Set smaller achievable goals to track progress
N.C.L. Industries interview questions for popular designations
I applied via Walk-in and was interviewed in Jul 2023. There were 3 interview rounds.
Get interview-ready with Top N.C.L. Industries Interview Questions
Plant production capacity refers to the maximum output that a plant can produce within a given time frame.
Plant production capacity is measured in terms of units produced per hour, day, or month.
Factors that affect plant production capacity include equipment efficiency, labor availability, and raw material availability.
Increasing plant production capacity often involves optimizing processes, improving equipment, and st...
I applied via Walk-in and was interviewed in Aug 2021. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Apr 2021. There were 4 interview rounds.
Segregation is the separation of coarse and fine particles in concrete, while bleeding is the upward movement of water in concrete.
Segregation occurs when the coarse and fine particles in concrete separate due to improper mixing or handling.
Bleeding is the upward movement of water in concrete due to the settlement of solid particles.
Segregation can lead to uneven distribution of aggregates in the concrete, resulting in...
Top trending discussions
The duration of N.C.L. Industries interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 6 interviews
Interview experience
based on 410 reviews
Rating in categories
Senior Sales Officer
66
salaries
| ₹0 L/yr - ₹0 L/yr |
Sales Officer
62
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
52
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
42
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
26
salaries
| ₹0 L/yr - ₹0 L/yr |
UltraTech Cement
Ambuja Cements
ACC
Shree Cement